Board Order: P.U. 1(2000-2001) SCHEDULE B
Proposed
Revisions to CIAC Policy[1]
Residential
Policy:
7. JOINT USE ALLOWANCE
(a) Where the Company constructs a Line
extension for which a CIAC is required, and the Line extension will be used
jointly by the Company and Newtel Communications Inc. will be
attaching to the Line extension, then the construction cost
used to calculate the CIAC in accordance with Clause 5 of this policy, and
payable by the customer or customers, shall be reduced. In such case, the joint use distribution
line Cost per Metre in Appendix A shall be used to
calculate the CIAC reduced by the amount specified in Note 1 of
Appendix A.
(b) Where the Company
constructs a Line extension for which a CIAC is required, and a Cable Company
will be attaching to the Line extension, the Cost per Metre in Appendix A shall
be reduced by the amount specified in Note 12 of Appendix
A.
General Service Policy:
7. JOINT USE ALLOWANCE
(a) In circumstances where the Company
constructs a Line extension for which a CIAC is required, and the Line
extension will be used jointly by the Company and Newtel Communications
Inc. will be attaching to the Line extension, then the construction
cost used to calculate the CIAC in accordance with Clause 5 of this policy and
payable by the customer or customers shall be reduced. In such case, the joint use distribution
line Cost per Metre in Appendix A shall be used to
calculate the CIAC reduced by the amount specified in Note 1 of
Appendix A.
(b) In circumstances where the Company constructs a
Line extension for which a CIAC is required, and a Cable Company will be
attaching to the Line extension, the Cost per Metre in Appendix A shall be
reduced by the amount specified in Note 12 of Appendix A.