ORDERS ISSUED BY THE BOARD DURING 2002-2003

UNDER

THE PUBLIC UTILITIES ACT

CHAPTER P- 47, 1990

 

- Click Order Number To View -

 

 

Newfoundland and Labrador Hydro                                               P.U. 1 (2002-2003)

         Application:

Ex Parte – Application for approval, pursuant to section 41 of the Act, of the repair of a transformer situated at the site of the Corner Brook Frequency Converter.

Decision:

The Applicant’s proposed 2002 capital expenditure of $465,600.00 for the rewinding of the T2 Transformer situated at the Corner Brook Frequency Converter approved as a result of a meeting of the Panel.

Date Issued:

April 16, 2002

 

 

Newfoundland Power Inc.                                                               P.U. 2 (2002-2003)

         Application:

Application for approval of the balance of the weather normalization reserve as of December 31, 2001 pursuant to Sections 69(3) and 78 of the Act.

Decision:

The Applicant’s weather normalization reserve of a Negative Balance of $9,899,796 as at December 31, 2001 approved as a result of a meeting of the Board.

At the next general rate review, the function and methodology of the Weather Normalization Reserve will be reviewed by the Board whereby the Applicant shall present its views on the function and methodology of the reserve and its proposal for the disposition of the deficit balance contained in the reserve account.

Date Issued:

May 2, 2002

 

 

Newfoundland Power Inc.                                                               P.U. 3 (2002-2003)

         Application:

Application for approval of the a contribution in aid of construction for a line extension.

Decision:

Pursuant to Section 41(5) of the Act, the Board approves the contribution in aid of construction.

Date Issued:

May 2, 2002

 

Newfoundland Power Inc.                                                               P.U. 4 (2002-2003)

         Application:

Application for approval of the a contribution in aid of construction for a line extension to serve Pitcher’s Pond Golf Inc. pursuant to s. 41(5) of the Act.

Decision:

Pursuant to Section 41(5) of the Act, the Board approves the contribution in aid of construction in the amount of Ninety-seven thousand three hundred fifty-nine dollars ($97,359.00), including HST, as calculated under the Policy, to provide three-phase service for a pump house and single-phase service for the clubhouse, to serve a golf course for Pitcher’s Pond Golf Inc. located near the Town of Whiteway, as a result of a meeting of the Board.

Date Issued:

May 2, 2002

 

Newfoundland Power Inc.                                                               P.U. 5 (2002-2003)

         Application:

Application for approval of the a contribution in aid of construction for a line extension to serve primarily seasonal customers pursuant to s. 41(5) of the Act.

Decision:

Pursuant to Section 41(5) of the Act, the Board approves the contribution in aid of construction in the amount of Two thousand eight hundred fifty-two dollars and eighty-nine cents ($2,852.89), including HST, as calculated under the Policy, for each of the five (5) Seasonal Customers as described in the Application with premises located on Trails End Road in the Mahers Cottage Area, as a result of a meeting of the Board.

Date Issued:

May 2, 2002

 

Newfoundland Power Inc.                                                               P.U. 6 (2002-2003)

         Application:

Application for approval of the a contribution in aid of construction for a line extension to serve the Town of Bay Roberts pursuant to s. 41(5) of the Act.

Decision:

Pursuant to Section 41(5) of the Act, the Board approves the contribution in aid of construction in the amount of Twenty-two thousand three hundred thirty dollars and seventy cents ($22,330.70), including HST, as calculated under the Policy, to provide single-phase, joint-use extension to serve a tourist chalet located on Veterans Memorial Highway, near Bay Roberts, as a result of a meeting of the Board.

Date Issued:

May 2, 2002

 

 

Newfoundland and Labrador Hydro        P.U. 7(2002-2003) , Appendices , Summary

         Application:

In the matter of an Application by Newfoundland and Labrador Hydro (Hydro) for approvals of:
(1) Under Section 70 of the Act, changes in the rates to be charged for the supply of power and energy to its Retail Customer, Newfoundland Power, its Rural Customers and its Industrial Customers;
(2) Under Section 71 of the Act, its Rules and Regulations applicable to the supply of electricity to its Rural Customers;
(3) Under Section 71 of the Act, the contracts setting out the terms and conditions applicable to the supply of electricity to its Industrial Customers; and
(4) Under Section 41 of the Act, its 2002 Capital Budget

Decision:

Please click order for complete details

Date Issued:

June 7, 2002

 

 

Newfoundland Power Inc.                                                               P.U. 8 (2002-2003)

         Application:

Application for approval of the a contribution in aid of construction for a line extension to serve primarily seasonal customers pursuant to s. 41(5) of the Act.

Decision:

Pursuant to Section 41(5) of the Act, the Board approves the contribution in aid of construction in the amount of Three thousand three hundred twenty-seven dollars and sixty-four cents ($3,327.64), including HST, as calculated under the Policy, and the suspension of the payment of refunds to the Customers until such time as the shortfall of $93.81 per customer referred to in the Application is recovered.

Date Issued:

June 12, 2002

 

 

Newfoundland Power Inc.                                                               P.U. 9 (2002-2003)

         Application:

Application for approval of the rate stabilization account adjustment and the municipal tax adjustment to be applied to rates for the period July 1, 2002 to June 30, 2003.

Decision:

The Board approves the Rate Stabilization Adjustment factor of 0.163 cents/kWh and the MTA factor of 1.02501 to be applied to all bills based on meter readings for the period July 1, 2002 to June 30, 2003.

Date Issued:

June 20, 2002

 

 

Newfoundland and Labrador Hydro                                             P.U. 10 (2002-2003)

         Application:

For approval of: (1) Under Section 70 of the Act, changes in the rates to be charged for the supply of power and energy to its Retail Customer, Newfoundland Power, its Rural Customers and its Industrial Customers; (2) Under Section 71 of the Act, its Rules and Regulations applicable to the supply of electricity to its Rural Customers; (3) Under Section 71 of the Act, the contracts setting out the terms and conditions applicable to the supply of electricity to its Industrial Customers; and (4) Under Section 41 of the Act, its 2002 Capital Budget.

Decision:

Pursuant to Section 90 (1) of the Act, the Board ordered that the costs of the Industrial Customers be fixed at $250,000 and that NLH shall, within a reasonable time period, pay intervenor costs to the Industrial Customers in the amount of $250,000.

Date Issued:

July 4, 2002

 

 

Newfoundland and Labrador Hydro                                             P.U. 11 (2002-2003)

         Application:

For approval of: Under Section 71 of the Act, certain rules and regulations pertaining to the supply of electrical power and energy to two of its industrial customers, Corner Brook Pulp and Paper Limited and Abitibi-Consolidated Company of Canada (Grand Falls).

Decision:

1.   Pursuant to Section 71 of the Act the definition of “Generating Capacity” set out in paragraph 1.01 (i) of the rules and regulations pertaining to the provision of electrical service by Hydro to Corner Brook Pulp and Paper Limited shall be revised so as to read as follows:

(i)   “Generating Capacity” includes

i. 99,100 kW, being the amount of Power the Customer is able to generate at 60 Hz from its hydraulic generating resources, or to generate at 50 Hz from its hydraulic generating resources and have converted to 60 Hz, and

ii.10,000 kW, being the amount of Power the Customer requires from Hydro for use in its electric boiler to produce process steam, a load that the Customer is normally able to displace by using its oil-filed steam boiler,but does not include capacity from generating facilities dedicated to the generation of power and energy for sale or transfer to Hydro or to a third party.

2.   Pursuant to Section 75 of the Act:

(a)  Until the Board makes a final Order approving such other rate, the Power and Energy rate associated with the provision of Generation Outage Power and Energy by Hydro to Corner Brook Pulp and Paper Limited and to Abitibi-Consolidated Company of Canada shall be the Industrial Non-Firm rate as proposed by Hydro in its 2001 General Rate Application, modified to reflect a fuel efficiency factor of 615 kWh/bbl, as established by the Board in Order No. P.U. 7 (2002-2003) calculated as set out in the attached Appendix “A”.

(b)  When the Board issues a final Order establishing the Industrial Non-Firm rate, the amounts paid for any supply of Generation Outage Power and Energy will be adjusted to reflect any reduction in the rate and an appropriate credit will be issued by Hydro to Corner Brook Pulp and Paper Limited and Abitibi-Consolidated Company of Canada.

Date Issued:

July 11, 2002

 

 

Newfoundland and Labrador Hydro                                             P.U. 12 (2002-2003)

         Application:

For approval of: Under Section 71 of the Act, of an additional supply of non-firm power and energy on a temporary basis to one of its industrial customers, Corner Brook Pulp and Paper Limited.

Decision:

1.   Pursuant to Section 71 of the Act, the supply of the Electric Boiler Power and Energy shall be in accordance with the Rules and Regulations approved by the Board in Order No. P.U. 7 (2002-2003) pertaining to the provision of electrical service by Hydro to CBPP.

2.   Pursuant to Section 75 of the Act:

(a)    Until the Board issues a final Order approving such other rate, the power and energy rate charged for the Electric Boiler Power and Energy shall be the Industrial Non-Firm rate as proposed by Hydro in the 2001 General Rate Application, modified to reflect a fuel efficiency factor of 615 kWh/bbl, as established by the Board in Order No. P.U. 7 (2002-2003), calculated as set out in the attached Appendix “A”; and

(b)   When the Board issues a final Order establishing the Industrial Non-Firm rate, the amounts paid by CBPP for any supply of Electric Boiler Power and Energy will be adjusted to reflect any reduction in the rate and any appropriate credit will be issued by Hydro to CBPP.

Date Issued:

July 11, 2002

 

 

Newfoundland Power Inc.                                                             P.U. 13 (2002-2003)

         Application:

Application for approval of the a contribution in aid of construction for a line extension to serve the City of St. John’s pursuant to s. 41(5) of the Act.

Decision:

Pursuant to Section 41(5) of the Act, the Board approves the contribution in aid of construction in the amount of Thirty-five thousand five hundred forty dollars and seventy-five cents ($35,540.75), including HST, as calculated under the Policy, to provide service to the pumping station from the City of St. John’s.

Date Issued:

July 9, 2002

 

 

Newfoundland Power Inc.                                                             P.U. 14 (2002-2003)

         Application:

Application for approval of the a contribution in aid of construction for a line extension to serve Seasonal Customers located at Frenchman’s Cove, near Corner Brook pursuant to s. 41(5) of the Act.

Decision:

Pursuant to Section 41(5) of the Act, the Board approves the contribution in aid of construction in the amount of Seven thousand four hundred seventeen dollars and fifty cents ($7,417.50), including HST, as calculated under the Policy, to provide service to Seasonal Residential Customers located at Frenchman’s Cove, near Corner Brook.

Date Issued:

July 9, 2002

 

 

Newfoundland Power Inc.                                                             P.U. 15 (2002-2003)

         Application:

Application for approval to proceed with the construction and purchase of certain improvements to its property pursuant to Section 41 (3) of the Act.

Decision:

Pursuant to Section 41(3) of the Act, the Board approves the construction projects and capital purchases in excess of $50,000, as set forth in Appendix “A” attached to the Order and the revised 2002 capital budget as set forth in Appendix “B” attached to the Order.

Date Issued:

July 9, 2002

 

 

Newfoundland and Labrador Hydro                                             P.U. 16 (2002-2003)

         Application:

For approval of: (1) Under Section 70 of the Act, changes in the rates to be charged for the supply of power and energy to its Retail Customer, Newfoundland Power, its Rural Customers and its Industrial Customers; (2) Under Section 71 of the Act, its Rules and Regulations applicable to the supply of electricity to its Rural Customers; (3) Under Section 71 of the Act, the contracts setting out the terms and conditions applicable to the supply of electricity to its Industrial Customers; and (4) Under Section 41 of the Act, its 2002 Capital Budget.

Decision:

NLH’s 2002 revenue requirement shall be adjusted to allow NLH to recover the amount of $804,498 through rates over the period from September 1, 2002 to December 31, 2003.

Date Issued:

July 15, 2002

 

 

Newfoundland Power Inc.                                                             P.U. 17 (2002-2003)

         Application:

Application for approval of the a contribution in aid of construction for a line extension to serve primarily Seasonal Customers located at Freshwater Pond off the Winterland Highway on the Burin Peninsula pursuant to s. 41(5) of the Act.

Decision:

Pursuant to Section 41(5) of the Act, the Board approves the contribution in aid of construction in the amount of Six thousand, four hundred forty-two dollars and sixty-nine cents ($6,442.69), including HST, for each of the four (4) new Customers as described in the Application with seasonal residences located at Freshwater Pond Cottage Area; and the refund amounts, as set out in Schedule A, attached to the Order, for each of the eight (8) existing Customers with seasonal residences located at Freshwater Pond Cottage Areas.

Date Issued:

August 1, 2002

 

 

Newfoundland Power Inc.                                                             P.U. 18 (2002-2003)

         Application:

Application for approval of the a contribution in aid of construction for a line extension to serve Residential and Seasonal Customers located at Port Blandford pursuant to s. 41(5) of the Act.

Decision:

Pursuant to Section 41(5) of the Act, the Board approves the contribution in aid of construction in the amount of Eight hundred twenty dollars and ninety-four cents ($820.94), including HST, for Residential Customers and a CIAC of Three Thousand three hundred four dollars and ninety-four cents ($3,304.94), including HST, for Seasonal Customers, located at Port Blandford, as calculated under the Policy.

Date Issued:

August 1, 2002

 

 

Newfoundland Power Inc.                                                             P.U. 19 (2002-2003)

         Application:

Application for approval of the a contribution in aid of construction for a line extension to serve Aliant Telecom Inc. pursuant to s. 41(5) of the Act.

Decision:

Pursuant to Section 41(5) of the Act, the Board approves the contribution in aid of construction in the amount of Fifty-six thousand seven hundred fifty-two dollars and fifty cents ($56,752.20), including HST, as calculated under the Policy, for Aliant Telecom Inc.

Date Issued:

August 1, 2002

 

 

Newfoundland and Labrador Hydro                                             P.U. 20 (2002-2003)

         Application:

Application for approval of certain proposed capital projects for 2002, pursuant to s. 41(3) of the Act.

Decision:

Pursuant to Section 41(3) of the Act, the Board approves the replacement of the sewage disposal system at the Holyrood Thermal Generating Plant and the relocation of a diesel generating unit to Cartwright (a total of $502,800) as set out in Schedule A to the Application.

Date Issued:

August 6, 2002

 

 

Newfoundland and Labrador Hydro   P.U. 21(2002-2003) , Schedule A , Schedule B

         Application:

In the matter of an Application by Newfoundland and Labrador Hydro (Hydro) for approvals of:
(1) Under Section 70 of the Act, changes in the rates to be charged for the supply of power and energy to its Retail Customer, Newfoundland Power, its Rural Customers and its Industrial Customers;
(2) Under Section 71 of the Act, its Rules and Regulations applicable to the supply of electricity to its Rural Customers;
(3) Under Section 71 of the Act, the contracts setting out the terms and conditions applicable to the supply of electricity to its Industrial Customers; and
(4) Under Section 41 of the Act, its 2002 Capital Budget

Decision:

Please click order for complete details

Date Issued:

August 22, 2002

 

 

Newfoundland Power Inc.                                                             P.U. 22 (2002-2003)

         Application:

In the matter of an amended application by Newfoundland Power:

(1)    to revise its schedule of rates, tolls and charges to permit recovery of additional costs payable to Newfoundland and Labrador Hydro for the supply of power as a result of Order No. P.U. 21(2002-2003),

(2)    an amendment to Newfoundland Power's Rate Stabilization Clause, and

(3)    for approval of an amendment of the definition of the Rate Stabilization Account with Newfoundland Power's System of Accounts.

Decision:

Please click order for complete details

Date Issued:

August 28, 2002

 

 

Newfoundland Power Inc.                                                             P.U. 23 (2002-2003)

         Application:

To issue Series AJ First Mortgage Bonds pursuant to Section 91 of the Public Utilities Act in an amount of up to $75,000,000.

Decision:

Approval given to Newfoundland Power to issue Series AJ First Mortgage Bonds in an amount of up to $75,000,000 and on the general terms set out in the Application subject to the following conditions:

(a)          The Bonds shall be issued on or before December 31, 2002.

(b) Newfoundland Power shall provide to the Board an Affidavit specifying the terms and conditions of the Bond issue within five (5) days (non-business days excepted) after closing the Bond issue.   In particular, the Affidavit shall set forth the following:

         (i)         date of the issue,

(ii)        term,

(iii)       maturity date,

(iv)       principal amount,

(v)        coupon rate,

(vi)              particulars of sinking fund, if any,

(vii)             price to public and to the underwriters,

(viii)           yield to the public,

(ix)              underwriting fee,

(x)                actual cost (i.e. yield) to Newfoundland Power, and

(xi)              any other material terms or conditions not contemplated at the date of the application but forming part of the negotiated terms and conditions.

(c)          Newfoundland Power shall provide to the Board a copy of the Underwriting Agreement relating to the Bond issue within five (5) days (non-business days excepted) after closing the Bond issue.

(d)          The proceeds from the Bond issue shall be used in the manner set out in  paragraph 9 of the Application, and Newfoundland Power shall report by Affidavit to the Board on the disposition of the proceeds no later than six months from this date.

All costs and expenses incurred by the Board in connection with the Application shall be borne by Newfoundland Power.

Date Issued:

September 26, 2002

 

 

Newfoundland and Labrador Hydo                                               P.U. 24 (2002-2003)

         Application:

Approval of a contribution in aid of construction for the supply of single-phase electrical service

Decision:

Pursuant to Section 41 (5) of the Act, the Board approves the CIAC.

Date Issued:

October 2, 2002

 

 

Newfoundland Power Inc.                                                             P.U. 25 (2002-2003)

         Application:

Approval of a contribution in aid of construction for a line extension to serve primarily seasonal customers located at Butts Pond East near Gambo, pursuant to s 41(5) of the Act.

Decision:

1)      Pursuant to Section 76 of the Act, Order No. P.U. 8 (2002-2003) is hereby rescinded.

2)   Pursuant to Section 41 (5) of the Act, the Board approves:

(a)  the CIAC of Three thousand three hundred twenty-seven dollars and sixty-four cents ($3,327.64), including HST, as calculated under the Policy being a total contribution of $86,808 distributed amongst 30 customers located in Butts Pond East; and

(b)  the suspension of the payment of refunds to the Customers until such time as any shortfall in the recovery of the $86,808 contribution which may be caused by customers option not to take service has been recovered from additional customers connecting to the line.

Date Issued:

October 2, 2002

 

 

Newfoundland and Labrador Hydro                                             P.U. 26 (2002-2003)

         Application:

Application by Newfoundland and Labrador Hydro (“NLH”) pursuant to Section 38 of the Act for consent to decommission its diesel generating station and to abandon its service of the electrical distribution system situate at Great Harbour Deep (the“Application”)..

Decision:

1. Pursuant to Section 38 of the Act, the Board consents to and approves the abandonment and decommissioning by NLH of its diesel generating station and electrical distribution system in the Town of Great Harbour Deep, and the termination of the provision of electrical service, on or after October 31, 2002.

2. NLH shall provide notice to those persons named above who made written submission to the Board of the date after which electrical service will no longer be provided.

3. NLH shall pay all costs and expenses of the Board incurred in connection with this Application.

Date Issued:

October 30, 2002

 

 

Newfoundland Power Inc.                                                             P.U. 27 (2002-2003)

         Application:

General Rate Application (the “Application”) by Newfoundland Power Inc. (“NP”) filed pursuant to Order No. P.U. 22 (2002-2003).

Decision:

The registered Intervenors, the schedule of dates, the order of witnesses, and the procedures for the hearing of the Application are as set out in Appendix “A” to this Order.

Date Issued:

November 5, 2002

 

 

Newfoundland and Labrador Hydro                                             P.U. 28 (2002-2003)

         Application:

For approval of the purchase by Hydro of the joint use support structures of Aliant Telecom Inc. located in Hydro’s service territory, pursuant to s. 41 of the Act.

Decision:

1.   Pursuant to s. 41 of the Act, the purchase by Hydro of the Joint Use Support Structures and the associated supplementary capital expenditure for 2002 of $3,569,840 is hereby approved.

2.       Hydro shall pay all costs and expenses of the Board incurred in connection with this Application Date

Issued:

November 5, 2002

 

 

Newfoundland and Labrador Hydro             P.U. 29 (2002-2003), Appendix 1, Appendix 2

         Application:

For approval of: (1) its 2003 Capital Budget pursuant to s. 41(1) of the Act; (2) its 2003 capital purchases and construction projects in excess of $50,000 pursuant to s. 41(3)(a) of the Act; (3) its leases for 2003 in excess of $5,000 per year pursuant to s. 42(3)(b) of the Act; and (4) its estimated contributions in aid of construction for 2003 pursuant to s. 41(5) of the Act.

Decision:

1.       Pursuant to section 41 of the Act, Hydro’s 2003 capital budget in the amount of $33,070,000.00, as set out in Appendix 1, Section A of this Order, is hereby approved.

2.       Pursuant to subsection 41.(3)(a) of the Act Hydro’s 2003 capital purchases and construction projects in excess of $50,000.00, as set out in Appendix 1, Sections B and C of the Order, are approved.

3.       Pursuant to section 41. (3)(b) of the Act Hydro’s 2003 leases in excess of $5,000.00 per calendar year, as set out in Appendix 1, Section D of this Order are approved.

4.       Hydro’s proposed estimated contributions in aid of construction of $170,000,000.00 are approved provided that all such contributions are sought in accordance with the policies approved by the Board;

5.       The application of the Industrial Customers for costs is denied; and

6.       Hydro shall pay the expenses of the Board arising from this Application.

Issued:

November 29, 2002

 

 

Newfoundland and Labrador Hydro                                             P.U. 30 (2002-2003)

         Application:

Application for approval of a contribution in aid of construction for the supply of single-phase electrical service to a Chlorination Building at Hampden.

Decision:

The Board approves the contribution in aid of construction in the amount of Forty nine thousand one hundred and eighty-five dollars and fifty cents ($49,185.50) for the supply of single-phase electrical service to the new Chlorination Building at Hampden, Newfoundland and Labrador, as a result of a meeting of the Board.

Issued:

December 4, 2002

 

 

Newfoundland Power Inc.                                                             P.U. 31 (2002-2003)

         Application:

Application for approval of a contribution in aid of construction for a line extension to serve the Town of Port Union pursuant to s. 41(5) of the Act.

Decision:

Pursuant to Section 41(5) of the Act, the Board approves the contribution in aid of construction in the amount of Thirty-eight thousand three hundred twenty-three dollars and seventy-five cents ($38,323.75), including HST, as calculated under the Policy, to provide service to a pumping station for the Town of Port Union, as a result of a meeting of the Board.

Date Issued:

December 4, 2002

 

 

Newfoundland Power Inc.                                                             P.U. 32 (2002-2003)

         Application:

Application for approval of a contribution in aid of construction for a line extension to serve six seasonal customers whose residences are located at Mint Brook near the community of Gambo pursuant to s. 41(5) of the Act.

Decision:

Pursuant to Section 41(5) of the Act, the Board approves the contribution in aid of construction in the amount of Three thousand eight hundred seventy-three dollars and fifty-eight cents ($3,873.58), including HST, for each seasonal customer as calculated under the Policy, as a result of a meeting of the Board.

Date Issued:

December 4, 2002

 

 

Newfoundland Power Inc.                                                             P.U. 33 (2002-2003)

         Application:

General Rate Application (the “Application”) by Newfoundland Power Inc. (“NP”) filed pursuant to Order No. P.U. 22 (2002-2003) and a Motion by the Consumer Advocate.

Decision:

The Motion of the Consumer Advocate is denied.

Date Issued:

December 11, 2002

 

 

Newfoundland Power Inc.                                                             P.U. 34 (2002-2003)

         Application:

General Rate Application (the “Application”) by Newfoundland Power Inc. (“NP”) filed pursuant to Order No. P.U. 22 (2002-2003).

Decision:

1.   The Schedule of Dates for the hearing of this Application is amended as set out in Appendix “A” – Item 2 – 1st Revision.

2.   The Order of Witnesses for the hearing of this Application is amended as set out in Appendix “A” – Item 3. – 1st Revision.

Date Issued:

December 12, 2002

 

 

Newfoundland Power Inc.                                                             P.U. 35 (2002-2003)

         Application:

Interim approval of Newfoundland Power Inc.’s current schedule of rates, tolls and charges from January 1, 2003, pursuant to Section 75 of the Public Utilities Act and Order No. P.U. 22 (2002-2003)

Decision:

Pursuant to Section 75 of the Public Utilities Act, RSN 1990, Chapter P-47, the Board approves, on an interim basis from January 1, 2003, the current schedule of rates, tolls and charges of Newfoundland Power as approved in Order No. P.U. 22 (2002-2003), which will remain in effect until a final order of the Board.

Date Issued:

December 19, 2002

 

 

Newfoundland Power Inc.           P.U. 36 (2002-2003), Schedule A, Schedule B, Schedule C

         Application:

In the matter of an application by Newfoundland Power Inc. for an Order pursuant to Sections 41 and 78 of the Act:

1.       approving its 2003 Capital Budget of $55,790,000;

2.       approving the purchase, construction and leases in 2003 of the improvements and additions to its property as set out in the application; and

3.       fixing and determining its average rate base for 2001 in the amount of $545,162,000.

Decision:

Please click order and schedules for complete details

Date Issued:

December 23, 2002

 

 

 