Orders Issued by the Board during 2008 under the Public Utilities Act
Newfoundland Power P.U. 1 (2008)
Application:
Application for approval of:
i.
revised distribution line cost per metre for Contributions in Aid
of Construction (CIAC’s);
ii.
revised distribution plant upgrade cost for CIAC’s; and
iii.
revised CIAC cost factors.
Decision:
1.
The revised cost
factors submitted with the application and contained in the Schedules appended
to this Order are approved to be used in the calculation of all CIAC’s with
effect from February 5, 2008, and, where advantageous to customers of
Newfoundland Power, on all CIAC’s quoted but unpaid as of February 5, 2008.
2.
Newfoundland
Power submit a revised CIAC Policy in its entirety incorporating the revisions
approved herein.
Date Issued:
January 31, 2008
Newfoundland Power P.U. 2 (2008)
Application:
Application for approval of a
Contribution in Aid of Construction (CIAC) for Cottage Area Customers located
at Terrence’s Pond near Clarenville.
Decision:
1.
The Board
approves the Non-Refundable CIAC of four thousand three hundred thirty-one
dollars and twenty-nine cents ($4,331.29), excluding HST, as calculated under
the Policy to provide single-phase service to Domestic Customers located in the
Combined Thorburn Lake Cottage Area for a 20-year period from the date the
Terrence’s Pond Extension is placed in service, pursuant to s. 41(5) of the
Act.
2.
The Board
approves the refund to each of the existing customers in the Thorburn Lake
Cottage Area of the amount of one hundred thirty-six dollars and one cent
($136.01), excluding HST.
3.
The Applicant
shall pay all expenses of the Board arising from this Application.
Date Issued:
April 10, 2008
Newfoundland Power P.U. 3 (2008)
Application:
Application for approval of a
capital expenditure supplemental to Newfoundland Power Inc.’s 2008 Capital
Budget (1st Supplemental – Replacement of power transformer in NP’s Pierre’s
Brook hydroelectric system, the Southern Shore Highway)
Decision:
1. Pursuant to Section 41(3) of the Act, the
Board approves:
i.
capital expenditures estimated in the amount of $486,000 related to
the work that is required to accommodate the replacement transformer at the
Pierre’s Brook substation as set forth in the application; and
ii.
an increase in the amount of $400,000 to the Allowance for
Unforeseen Items approved in Order No. P. U. 27(2007).
2. Newfoundland Power shall pay the expenses of
the Board arising from this application.
Date Issued:
April 10, 2008
Newfoundland and Labrador Hydro P.U. 4 (2008)
Application:
Application for Rate Changes to
Labrador Interconnected Customers
Decision:
1.
The decrease of
the monthly amount of the 2008 automatic rate adjustment in the Rural Rate
Alteration for the Labrador Interconnected customers in the Rate Stabilization
Plan from $92,560 to $32,433, is approved on a final basis, as attached in
Schedule A.
2.
Pursuant to Section
70 of the Act, the Schedule of Rates for the Labrador Interconnected customers,
as attached in Schedule B, is approved on a final basis, effective January 1,
2008.
3.
Hydro shall pay
all expenses of the Board arising from this Application.
Date Issued:
April 30, 2008
Newfoundland and Labrador Hydro P.U. 5 (2008)
Application:
Application for Rate Changes to
Island Interconnected Customers and Isolated Rural Customers
Decision:
1.
Pursuant to Section 70 of the Act the rates as attached in Schedule
A are approved on a final basis, effective for consumption on and after January
1, 2008.
2.
The continuation of the rebate to Hydro’s domestic customers served
from the Labrador Isolated and L’Anse au Loup (Labrador Straits) system is
approved on a final basis.
3.
Hydro shall pay all expenses of the Board arising from this
Application.
Date Issued:
May 2, 2008
Newfoundland Power P.U. 6 (2008)
Application:
Application for an Order of the
Board providing for disposition of the balance in the Purchased Power Unit Cost
Variance Reserve Account pursuant to Sections 58 and 80 of the Act.
Decision:
1.
The Board
approves the amended Rate Stabilization Clause set out in Schedule “A” to this
Order, which adds clause 6 to the Rate Stabilization Account at page 5 of 5.
2.
The Board
approves the disposition of the 2007 balance in the Purchased Power Unit Cost
Variance Reserve Account by means of a credit to the Rate Stabilization
Account, as of March 31, 2008, of $481,611.
3.
Newfoundland
Power shall pay all expenses of the Board arising from this Application.
Date Issued:
May 29, 2008
Newfoundland
Power P.U. 7 (2008)
Application:
Application
for approval of the balance of the balance of the Weather Normalization Reserve
as of December 31, 2007 pursuant to Sections 69(3) and 78 of the Act.
Decision:
1.
The Board
approves Newfoundland Power’s Weather Normalization Reserve of a Negative
Balance of $10,516,682 as at December 31, 2007, pursuant to Sections 69(3) and
78 of the Act.
2.
Newfoundland
Power shall pay all the expenses of the Board arising from this Application.
Date Issued:
May
15, 2008
Newfoundland
Power P.U. 8 (2008)
Application:
Application
for approval of a contribution in aid of construction for a line extension to
serve domestic customers residing in a cottage area pursuant to Section 41(5)
of the Act.
Decision:
1.
The Board
approves the Refundable contribution in aid of construction of four thousand
seven hundred twenty-seven dollars and ninety-six cents ($4,727.96), excluding
HST, as calculated under the Policy to apply to Domestic Customers in the
Golden Gullies and Goulds Big Pond Cottage Area, pursuant to Section 41(5) of
the Act.
2.
Newfoundland
Power shall pay all expenses of the Board arising from this Application.
Date Issued:
May
15, 2008
Newfoundland and
Labrador Hydro P.U. 9 (2008)
Application:
Application
for approval to lease office space - Labrador Region Operations, pursuant to
Section 41 of the Public Utilities Act.
Decision:
1.
The Board
approves Hydro’s proposed 20-month lease of office space for Happy Valley-Goose
Bay in the amount of $6,337.50 per month, plus HST, pursuant to Section 41 of
the Act.
2.
Hydro shall pay
all expenses of the Board arising from this Application.
Date Issued:
May
28, 2008
Newfoundland Power P.U. 10 (2008)
Application:
Application
for approval of the establishment of a 2008 Income Tax Deferral Account and a
2008 Income Tax True-up.
Decision:
1.
The Board
approves:
(a)
the definition of the 2008 Tax Deferral Account contained in
Schedule “A” of this Order;
(b)
a credit of $560,000 of the 2008 Income Tax True-up to the 2008 Tax
Deferral Account as of March 31, 2008;
(c)
a transfer of $560,000 from the 2008 Tax Deferral Account to the
Rate Stabilization Account as of March 31, 2008; and
(d)
a reduction in Newfoundland Power’s base rates of 0.177% to be
effective July 1, 2008.
2. Newfoundland Power
shall pay all the expenses of the Board incurred in this Application.
Date Issued:
May
29, 2008
Newfoundland and Labrador Hydro P.U. 11 (2008)
Application:
Application for approval of the
Rate Stabilization Plan component of the rates to be charged to Newfoundland Power
Inc., pursuant to Section 70 (1) of the Public Utilities Act.
Decision:
1. The Board approves:
(i) the proposed modifications to the fuel
rider component of the Rate Stabilization Plan;
(ii) the rates to be charged by Hydro to Newfoundland
Power, as set out in Schedule “A” to this Order, to be effective for
consumption on or after July 1, 2008;
(iii) the Rate Stabilization Plan Rules as set out
in Schedule “B” to this Order, to be effective July 1, 2008; and
(iv) the revised Industrial Customer Interim rate
sheets, as set out in Schedule “C” to this Order, to reflect the name change of
“Aur Resources Inc.” to “Teck Cominco Limited”.
2. Hydro shall pay the expenses of the Board
incurred in connection with this matter.
Date Issued:
June 12, 2008
Newfoundland
Power P.U. 12 (2008)
Application:
Application
for approval of a contribution in aid of construction for a line extension to serve
domestic customers residing in a cottage area pursuant to Section 41(5) of the
Act.
Decision:
1. The Non-Refundable
CIAC of four thousand five hundred eighty-eight dollars and ninety-four cents
($4,588.94), excluding HST, as calculated under the Policy to provide
single-phase service to Domestic Customers located in the Cottage Area known as
Sandy Point (Area 2) located near the community of Norris Arm South, is
approved.
2. Newfoundland Power
shall pay all expenses of the Board arising from this Application.
Date Issued:
June
19, 2008
Newfoundland Power P.U. 13 (2008)
Application:
Application for approval of a
contribution in aid of construction for a line extension to serve domestic
customers residing in a cottage area pursuant to Section 41(5) of the Act.
Decision:
1. The Non-Refundable CIAC of eight thousand
four hundred thirty-six dollars and fifty-three cents ($8,436.53), excluding
HST, as calculated under the Policy to apply to Domestic Customers located in
the Cottage Area known as Smith’s Pond, is approved.
2. Newfoundland Power shall pay all expenses of
the Board arising from this Application.
Date Issued:
June 19, 2008
Newfoundland Power P.U. 14 (2008)
Application:
Application for approval of a
contribution in aid of construction for a line extension to serve domestic
customers residing in a cottage area pursuant to Section 41(5) of the Act.
Decision:
1. The Non-Refundable CIAC of two thousand three
hundred ninety-two dollars and twenty-four cents ($2,392.24), excluding HST, as
calculated under the Policy to apply to Domestic Customers located in the
Combined Valley Road Cottage Area for a 20-year period from the date the Line
Road Extension is placed in service, is approved.
2. The refund to each of the existing customers
in the Valley Road Cottage Area of the amount of thirty-three dollars and
seventy-six cents ($33.76), excluding HST, is approved.
3. Newfoundland Power shall pay all expenses of
the Board arising from this Application.
Date Issued:
June 19, 2008
Newfoundland Power P.U. 15 (2008)
Application:
Application for approval of Rate
Stabilization Adjustment and Municipal Tax Adjustment to be effective July 1,
2008.
Decision:
1.
The Rate Stabilization Adjustment of 0.761 cents/kWh and the
Municipal Tax Adjustment factor of 1.02359, to be applied to all bills based on
consumption on and after July 1, 2008 to June 30, 2009, are approved.
2.
The rates proposed by
Newfoundland Power to be effective on all electrical consumption on and after
July 1, 2008 to June 30, 2009, as set out in Schedule A to this Order, are
approved.
3.
Newfoundland Power shall pay the expenses of the Board in
connection with this Application.
Date Issued:
June 24, 2008
Newfoundland and
Labrador Hydro P.U. 16 (2008)
Application:
Application
for Rate Changes to Island Interconnected Customers (excluding Burgeo School
and Library) and Isolated Rural Customers (excluding Government departments) to
be effective July 1, 2008
Decision:
1.
The rates
proposed by Hydro for its Island Interconnected customers (excluding Burgeo
School and Library) and Isolated Rural customers (excluding Government
departments) to be effective on all electrical consumption on and after July 1,
2008, as set out in Schedule A to this Order, are approved.
2.
Hydro shall pay
the expenses of the Board incurred in connection with this Application.
Date Issued:
June
24, 2008
Newfoundland and Labrador Hydro P.U. 17 (2008)
Application:
Application
for approval of three capital projects affecting the Holyrood Thermal
Generating Station, pursuant to Section 41(3) of the Act.
Decision:
1. The additional
2008 capital expenditures of:
(a)
$4,446,200 to
replace the Unit 1 Superheater at the Holyrood Thermal Generating Station; and
(b)
$1,278,500 to
replace the public address (paging) system at the Holyrood Thermal Generating
Station;
are
approved.
2. Hydro shall pay
the expenses of the Board arising from this Application.
Date Issued:
June
27, 2008
Newfoundland
Power P.U. 18 (2008)
Application:
Application
for approval of capital expenditures supplemental to Newfoundland Power Inc.’s
2008 Capital Budget (2nd Supplemental – wind generation facilities – Newind
Group Inc – Burin Peninsula and SkyPower Facility – Fermeuse).
Decision:
1. The Board approves
the following capital expenditures associated with the interconnection of the
Wind Farms to Newfoundland Power’s transmission system:
i.
$487,000 to make additions and modifications to Newfoundland
Power’s Laurentian Substation at St. Lawrence to accommodate the
interconnection of the Newind Facility;
ii.
$928,000 to make additions and modifications to Newfoundland Power’s
Fermeuse Substation on the Southern Shore of the Avalon Peninsula to
accommodate the interconnection of the SkyPower Facility, and for associated
metering and protective relaying additions and modifications at Newfoundland
Power’s Cape Broyle, Mobile and Big Pond Substations; and
iii.
$88,000 to make modifications to Newfoundland Power’s transmission
line terminating at Laurentian Substation to accommodate the interconnection of
the Newind Facility.
2. Newfoundland Power
shall pay all the expenses of the Board arising from this Application.
Date Issued:
July
11, 2008
Newfoundland
Power P.U. 19 (2008)
Application:
Application
for approval of capital expenditures supplemental to Newfoundland Power Inc.’s
2008 Capital Budget (3rd Supplemental –Underground civil infrastructure for
utility power cables in Water Street and Harbour Drive areas of St. John’s).
Decision:
1.
The Board approves
the additional 2008 capital expenditures of $1,930,000 associated with the
installation of underground civil infrastructure for utility power cables in
Water Street and Harbour Drive areas of St. John’s.
2.
Newfoundland
Power shall pay all the expenses of the Board arising from this Application.
Date Issued:
July
31, 2008
Newfoundland and
Labrador Hydro P.U. 20 (2008)
Application:
Amended
Application for the approval, pursuant to Sections 78 and 80 of the Act, for
inclusion in rate base of certain Interconnection expenditures incurred by
Hydro, and for the deferral and recognition of certain power purchase costs
incurred by Hydro, all with respect to two wind energy purchase agreements.
Decision:
1.
Hydro’s proposal
to set up a deferral account for the unrecoverable Interconnection Costs
associated with the Power Purchase Agreements, at an estimated cost of
$500,000, together with financing costs, is approved (the “Deferral Account”).
2.
Hydro’s proposal
to include the unamortized balance of the Deferral Account in the rate base for
2008 is approved.
3.
Hydro shall
recognize the balance of the Deferral Account as an expense in 2009.
4.
Hydro shall pay the
expenses of the Board incurred in connection with this Application.
Date Issued:
September
3, 2008
Newfoundland
Power P.U. 21 (2008)
Application:
Application
for approval to proceed with the construction and purchase of certain
improvements to its property pursuant to Section 41(3) of the Act. [Reference
Order No. P. U. 27(2007) – NP 2008 Capital Budget]
Decision:
The
Board approves the amount of $70,000 in leases for 2008 pursuant to Section 41
of the Act.
Date Issued:
September
8, 2008
Newfoundland
Power P.U. 22 (2008)
Application:
Application
for approval, pursuant to Section 91(5) of the Act to amend an existing
committed revolving term credit facility to extend the maturity date.
Decision:
1.
Pursuant to
Section 91(5) of the Act, the Board approves:
a)
the extension of the
maturity date associated with the Amended Committed Facility to August 29,
2011;
b)
such further
extensions of the maturity date as may be requested by Newfoundland Power and
agreed to by the lenders; and
c)
the deletion of
the material adverse change provision described in paragraph 6 of the
Application
d)
all as
contemplated by the Second Amending Agreement.
2. Newfoundland Power
shall pay all the expenses of the Board arising from this Application.
Date Issued:
September 17,
2008
Newfoundland and
Labrador Hydro P.U. 23 (2008)
Application:
Application
for approval to undertake a Condition Assessment and Life Extension Study for the
Holyrood Thermal Generating Station pursuant to Section 41(3) of the Act.
Decision:
1.
An additional
2008 expenditure of $420,000 to begin the proposed Condition Assessment and
Life Extension Study for the Holyrood Thermal Generating Station, which involves
the issuance of a request for proposals, evaluation of the proposals and the
preparation of a detailed scope of work, is approved.
2.
Newfoundland and
Labrador Hydro shall pay all the expenses of the Board arising from this
Application.
Date Issued:
September 25,
2008
Newfoundland
Power P.U. 24 (2008)
Application:
Application
for approval to proceed with the construction and purchase of certain improvements to its property pursuant to
Section 41(3) of the Act (the “Application”).
Decision:
1.
Pursuant to
Section 41(3) of the Act the Board approves the additional 2008 capital
expenditures associated with the purchase of 17 photocopiers as proposed in the
Application.
2.
Newfoundland
Power shall pay all the expenses of the Board arising from this Application.
Date Issued:
October 1, 2008
Newfoundland and Labrador Hydro P.U. 25 (2008)
Application:
Application for approval of a
capital project to purchase a front end loader, pursuant to Section 41(3) of
the Act.
Decision:
1.
Pursuant to Section 41(3) of the Act, the Board approves the additional
capital expenditures of $220,000 for the purchase of a front end loader.
2.
Hydro shall pay the expenses of the Board arising from this
Application.
Date Issued:
October 1, 2008
Newfoundland and
Labrador Hydro P.U. 26 (2008)
Application:
Application
for approval to install neutral grounding resistors at Come By Chance terminal
station and approval of an associated customer contribution, pursuant to
Sections 41(3) and 41(5) of the Act.
Decision:
1.
Pursuant to
Section 41(3) of the Act the Board approves the capital expenditure of $272,271
for installation of neutral grounding resistors at the Come By Chance terminal
station, which asset will be specifically assigned to North Atlantic Refining
Limited upon completion of the capital project.
2.
Pursuant to
Section 41(5) of the Act the Board approves the contribution from the customer,
North Atlantic Refining Limited, of the final capital cost of the project.
3.
Hydro shall pay
the expenses of the Board arising from this Application.
Date Issued:
October 1, 2008
Newfoundland Power P.U. 27 (2008)
Application:
Application for approval of, pursuant to
Sections 41 and 78 of the Act:
a)
its 2009 Capital Budget of $61,571,000;
b)
its 2009 leases of $11,000 per year; and
c)
fixing and determining its average rate base for 2007 in the amount
of $793,703,000.
Decision:
1.
Pursuant to Section 41 of the Act Newfoundland Power’s capital
purchases and construction projects in excess of $50,000, as set out in
Schedule A to this Order, are approved.
2.
Pursuant to Section 41 of the Act the 2009 Capital Budget for
improvements and additions to Newfoundland Power’s property in an amount of
$61,571,000 is approved.
3.
Pursuant to Section 41 of the Act the 2009 leases of $11,000 per
year, as set out in Schedule B to this Order, are approved.
4.
Pursuant to Section 78 of the Act the average rate base for the
year ending December 31, 2007 is hereby fixed and determined at $793,703,000.
5.
Unless otherwise directed by the Board, Newfoundland Power shall
file an annual report to the Board on its 2009 capital expenditures by March 1,
2010.
6.
Unless otherwise directed by the Board, Newfoundland Power shall
provide in conjunction with the 2010 Capital Budget Application, a status
report on the 2009 capital budget expenditures showing for each project:
i.
the approved budget for 2009;
ii.
the expenditures prior to 2009;
iii.
the 2009 expenditures to the date of the Application;
iv.
the remaining projected expenditures for 2009;
v.
the variance between the projected total expenditures and the
approved budget; and
vi.
an explanation of the variance.
7. Newfoundland Power shall
pay all costs and expenses of the Board incurred in connection with the
Application.
Date Issued:
November 12, 2008
Newfoundland Power P.U. 28 (2008)
Application:
Application for approval to proceed with
the construction and purchase of certain improvements to its property pursuant
to Section 41(3) of the Act (the “Application”).
Decision:
1.
The
Non-Refundable CIAC of Three thousand one hundred eighty-four dollars and
seventy-one cents ($3,184.71), excluding HST, as calculated under the Policy to
apply to Domestic Customers located in the Cottage Area known as Monroe’s Pond,
is approved.
2.
Newfoundland Power shall pay all expenses of the Board arising from
this Application.
Date Issued:
November 20, 2008
Newfoundland Power P.U. 29 (2008)
Application:
Application for approval to remove a
distribution line from service in the Stephenville Flood Zone pursuant to
Section 38 of the Act (the “Application”).
Decision:
1.
Pursuant to Section 38 of the Act, the Board consents to the
removal of the Line from the Flood Zone as proposed in the Application.
2.
Newfoundland Power shall pay all expenses of the Board arising from
this Application.
Date Issued:
November 20, 2008
Newfoundland and Labrador Hydro P.U. 30 (2008)
Application:
Application by Newfoundland and Labrador
Hydro (“Hydro”) for the approval of an upgrade to transmission lines TL-227 and
TL-262 (the “Application”), pursuant to Section 41(3) of the Act.
Decision:
1.
Pursuant to Section 41(3) of the Act, the Board approves the
capital expenditure of $350,300 for the upgrade to transmission lines TL-227
and TL-262.
2.
Hydro shall pay all expenses of the Board arising from this
Application.
Date Issued:
November 20, 2008
Newfoundland and Labrador Hydro P.U. 31 (2008)
Application:
Application by Newfoundland and Labrador
Hydro (“Hydro”) for the approval of the deferral of expenses associated with
the repair of the Unit 2 Turbine at the Holyrood Thermal Generating Station as
a Major Extraordinary Repair (the “Application”), pursuant to Sections 69, 78
and 80 of the Act.
Decision:
1.
The Application
is denied.
2.
Hydro shall pay
the expenses of the Board arising from this Application.
Date Issued:
December 18, 2008
Newfoundland and Labrador Hydro P.U. 32 (2008)
Application:
Application by
Newfoundland and Labrador Hydro (“Hydro”) for the approval to extend the
amortization period for deferral of Major Extraordinary Repairs from five to
seven years (the “Application”), pursuant to Sections 69, 78 and 89 of the Act.
Decision:
1.
The Application
is denied.
2.
Hydro shall pay
the expenses of the Board arising from this Application..
Date Issued:
December 18, 2008
Newfoundland and Labrador Hydro P.U. 33 (2008)
Application:
Application by Newfoundland and Labrador
Hydro (“Hydro”) for the approval of a Contribution in Aid of Construction
(“CIAC”) for a single-phase line extension to serve the Walsh’s River Cottage
Area, near Labrador City (the “Application”), pursuant to Section 41(5) of the
Act.
Decision:
1.
The Contribution in Aid of Construction in the amount of
$475,704.62, including HST; to be paid in two separate amounts of $93,000.00 in
2008 and $382,704.62 in 2009, for the supply of single phase electrical service
to 19 domestic customers, located at the Walsh’s River Cottage Area near
Labrador City, as calculated under the Policy, is approved.
2.
Hydro shall pay the expenses of the Board incurred in connection
with this Application.
Date Issued:
December 18, 2008
Newfoundland and Labrador Hydro P.U. 34 (2008)
Application:
Application by Newfoundland and Labrador
Hydro (“Hydro”) for the approval of changes in the rates to be charged for the
supply of power and energy to Labrador Interconnected customers and related
changes to the Rate Stabilization Plan Rules, (the “Application”), pursuant to
Sections 70 and 71 of the Act.
Decision:
1.
The decrease of the monthly amount of the 2009 automatic rate
adjustment in the Rural Rate Alteration for the Labrador Interconnected
customers in the Rate Stabilization Plan from $32,433 to ($5,766), is approved
on a final basis, as attached in Schedule A.
2.
The Schedule of Rates for the Labrador Interconnected customers, as
attached in Schedule B, is approved on a final basis, effective January 1,
2009.
3.
Hydro shall pay the expenses of the Board arising from this
Application.
Date Issued:
December 22, 2008
Newfoundland Power P.U. 35 (2008)
Application:
Application for approval of the Operation
of the Automatic Adjustment Formula for 2009.
Decision:
1.
The Board approves:
i.
a rate of return on rate base for 2009 of 8.37% in a range of 8.19%
to 8.55%; and
ii.
Newfoundland Power’s continued use of the current Customer Rates
approved by Order No. P. U. 15(2008), with effect from January 1, 2009.
2. Newfoundland
Power shall pay the expenses of the Board arising from this Application.
Date Issued:
December 22, 2008
Newfoundland and Labrador Hydro P.U. 36 (2008)
Application:
Application for
approval of (a) its 2009 Capital Budget of $47,856,000; (b) its 2009 capital
budget purchases and construction projects in excess of $50,000; (c) its 2009
leases of $6,720 per year; (d) the proposed estimated contributions in aid of
construction for 2009; and (d) fixing and determining its average rate base for
2007 in the amount of $1,484,545,000.
Decision:
1.
Pursuant to
Section 41 of the Act, Hydro’s proposed capital purchases and construction
projects in excess of $50,000 are approved, as set out in Schedule A to this
Order.
2.
Pursuant to
Section 41 of the Act, the 2009 Capital Budget for improvements and additions
to Hydro’s property in an amount of $ 47,856,000 is approved.
3.
Pursuant to
Section 41 of the Act, the 2009 lease in the amount $6,720 is approved.
4.
Unless otherwise
directed by the Board, Hydro shall file an annual report to the Board on its
2009 capital expenditures by March 1, 2010.
5.
Unless otherwise
directed by the Board Hydro shall provide, in conjunction with the 2010 Capital
Budget Application, a status report on the 2009 capital budget expenditures
showing for each project:
i.
the approved budget for 2009;
ii.
the expenditures prior to 2009;
iii.
the 2009 expenditures to the date of the application;
iv.
the remaining projected expenditures for 2009;
v.
the variance between the projected total expenditures and the
approved budget; and
vi.
an explanation of the variance.
6.
Hydro shall pay all costs and expenses of the Board incurred in
connection with the Application.
Date Issued:
December 23, 2008
Newfoundland and Labrador Hydro P.U. 37 (2008)
Application:
Application by Newfoundland and Labrador
Hydro (“Hydro”) for the approval of the Rate Stabilization Plan components of
the rates to be charged to Island Industrial Customers (the “Application”),
pursuant to Section 70(1) of the Act.
Decision:
1.
The continuation of the rates, rules and regulations for Hydro’s
Island Industrial Customers is approved on an interim basis from January 1,
2009 to March 31, 2009, with the Schedule of Rates as attached in Schedule A.
2.
Hydro shall make application to finalize the interim rates, rules
and regulations for the Island Industrial Customers by January 30, 2009.
3.
Hydro shall pay all expenses of the Board arising from this Application.
Date Issued:
December 24, 2008
Newfoundland and Labrador Hydro P.U. 38 (2008) is Rescinded
see P.U. 1 (2009)
Application:
Application for Rate Changes to Island
Interconnected Customers and Isolated Rurual Customers (Interim Order).
Decision:
1.
The Board approves on an interim basis the rates as attached in
Schedule A to be effective for consumption on and after January 1, 2009 until a
final order of the Board with respect to the within matter.
2.
The continuation of the rebate to Hydro’s domestic customers served
from the Labrador Isolated and L’Anse au Loup (Labrador Straits) system is
approved on an interim basis.
3.
Hydro shall pay all expenses of the Board arising from this Application.
Date Issued:
December 31, 2008
|