Public Utilities Board
Muskrat Falls Review
~ Abridged and/or Redacted Exhibits ~

The following exhibits were initially filed as Confidential Exhibits but have been abridged and/or redacted to remove commercially sensitive information.


ABRIDGED and/or REDACTED EXHIBITS
     CE 01 (R1) (Public): DC 1010 - Voltage and Conductor Optimization prepared by Hatch – April 08
     CE 02 (Public): DC 1010 - Voltage and Conductor Optimization Addendum (Dec 2008)
     CE 03 (Public): DC 1020 - HVdc System Integration - Volume 1 - Summary Report (May 2008)
     CE 04 (R1) (Public): DC 1020 - Volume 2 - Power Flow & Short Circuit
     CE 05 (R1) (Public): DC 1020 - Volume 3 - Comparison of Conventional and CC HVdc Technology
     CE 06 (R1) (Public): DC 1020 - Volume 4 - Multi-Terminal HVdc Link PSSE Stability Model
     CE 07 (R1) (Public): DC 1020 - Volume 5 - Transient Stability Study – May 2008
     CE 08 (R1) (Public): DC 1020 - Volume 6 - Cursory Evaluation of Alternate HVdc Configurations
     CE 09 (R1) (Public): DC 1110 - Electrode Review-Gull Island & Soldiers Pond–March 08
     CE 10 (R1) (Public): DC 1210 - HVdc Sensitivity Studies - Final Summary Report (July 2010)
     CE 11 (Public): DC 1250 - Electrode Review – Types and Locations – March 2010
     CE 12 (Public): DC 1500 - Electrode Review Confirmation of Type & Site Selection – Final Report
     CE 13 (Public): GI 1140 - PMF & Construction Design Flood Study 2008
     CE 14 (Public): GI 1190 - Dam Break Study – Volume 1
     CE 15 (R1) (Public): MF 1010 - Review of Variants – March 2008
     CE 16 (R1) (Public): MF 1050 - Spillway Design Review – December 2007
     CE 17 (Public): MF 1130 - River Operation During Construction & Impounding – Jan 2008
     CE 18 (Public): MF 1250 - Numerical Modeling of Muskrat Falls Structures – May 2008
     CE 19 (Public): MF 1300 - 2010 Site Investigations Geotechnical Report – Vol 1 - June 2011
     CE 20 (R1) (Public): MF 1310 - MF Site Access Review-Technical Report–Feb 11
     CE 22 (Public): MF 1330 - Hydraulic Modeling and Studies - Report 1 - 2010 Update - Oct 10
     CE 23 (Public): MF 1330 -Report 2 - 2010 Update – MF PMF & Construction Design Flood Study
     CE 24 (Public): MF 1330 - Report 3 - Dec 2010 – MF Dam Break Study
     CE 25 (Public): MF 1330 - Report 4 - 2010 Update – March 11– Muskrat Falls Ice Study
     CE 27 (R1) (Public): Summary of Studies on Firm and Average Energy Production June 9, 2011
     CE 28 (R1) (Public): Churchill River Complex - Power and Energy Modeling Study Vol 1 (July 1998)
     CE 29 (R1) (Public): Churchill River Optimization Study Volume 1 (January 1999)
     CE 30 (R1) (Public): Churchill River Optimization Study – Volume 2 (January 1999)
     CE 31 (R1) (Public): Gull Island to Soldiers Pond HVDC Interconnection – DC System Studies Vol 1
     CE 32: See Exhibit 23
     CE 33 (R2) (Public): Derivation of Long-term Holyrood #6 fuel price forecast for 2010
     CE 37: Exhibit Number Not Used
     CE 38: See Exhibit 99
     CE 39: Exhibit Number Not Used
     CE 40 (R2) (Public): Boskalis Shore Approach Feasibility Study Report
     CE 41 (R2) (Public): Feasibility Study of HDD for the Strait of Belle Isle
     CE 42 (R2) (Public): LCP Rock Berm Concept Development Study Report
     CE 43 (R2) (Public): Lower Churchill Project Shore Approach Feasibility Study Report
     CE 44 (R2) (Public): SOBI Marine Crossing Phase 2 Conceptual Design
     CE 46 (R2) (Public): PM0011 – CCGT Capital Cost Benchmark Study Final Report
     CE 47 (R1) (Public): 50 MW Gas Turbine - Budget Estimate
     CE 48: See Exhibit 5B
     CE 49: See Exhibit 5C
     CE 50 (Public): Strategist Module Documentation
     CE 51 (R1) (Public): Overview of Decision Gate 2 Capital Cost and Schedule Estimates
     CE 52 (R1) (Public): Technical Note – Strategic Risk Analysis and Mitigation
     CE 53 (R2) (Public): ANNUAL FIGURES (Net Cash Flow Analysis PWC 245
     CE 54 (R1) (Public): GI1141 Upper Churchill PMF & Flood Handling Procedures Update August 2009
     CE 55 (R1) (Public): SOBI Submarine Cable Tech RFP - Aug 2011
     CE 56 (R1) (Public): Feasibility Study HTGS Units 1&2 Conversion to Synchronous Condenser
     CE 59: See Exhibit 100
     CE 61 (R1) (Public): PWC Derivation of $76 per MWH LCP DG2.
     CE 64 (R1) (Public): LCP Financial Returns - Muskrat Falls, Serving Island Load Only
     CE 68 (R1) (Public): Listing of 3rd Party Vendors - September 30, 2011
     CE 69: See RFI CA/KPL-Nalcor-55



Additional Exhibits          Muskrat Falls Review - Main Page

Board of Commissioners of Public Utilities
Newfoundland and Labrador
Canada