Public Utilities Board
Muskrat Falls Review
~ Abridged and/or Redacted Exhibits ~
The following exhibits were initially filed as Confidential Exhibits but have been abridged and/or redacted to remove commercially sensitive information.
ABRIDGED and/or REDACTED EXHIBITS
CE 01 (R1) (Public):
DC 1010 - Voltage and Conductor Optimization prepared by Hatch April 08
CE 02 (Public):
DC 1010 - Voltage and Conductor Optimization Addendum (Dec 2008)
CE 03 (Public):
DC 1020 - HVdc System Integration - Volume 1 - Summary Report (May 2008)
CE 04 (R1) (Public):
DC 1020 - Volume 2 - Power Flow & Short Circuit
CE 05 (R1) (Public):
DC 1020 - Volume 3 - Comparison of Conventional and CC HVdc Technology
CE 06 (R1) (Public):
DC 1020 - Volume 4 - Multi-Terminal HVdc Link PSSE Stability Model
CE 07 (R1) (Public):
DC 1020 - Volume 5 - Transient Stability Study May 2008
CE 08 (R1) (Public):
DC 1020 - Volume 6 - Cursory Evaluation of Alternate HVdc Configurations
CE 09 (R1) (Public):
DC 1110 - Electrode Review-Gull Island & Soldiers PondMarch 08
CE 10 (R1) (Public):
DC 1210 - HVdc Sensitivity Studies - Final Summary Report (July 2010)
CE 11 (Public):
DC 1250 - Electrode Review Types and Locations March 2010
CE 12 (Public):
DC 1500 - Electrode Review Confirmation of Type & Site Selection Final Report
CE 13 (Public):
GI 1140 - PMF & Construction Design Flood Study 2008
CE 14 (Public):
GI 1190 - Dam Break Study Volume 1
CE 15 (R1) (Public):
MF 1010 - Review of Variants March 2008
CE 16 (R1) (Public):
MF 1050 - Spillway Design Review December 2007
CE 17 (Public):
MF 1130 - River Operation During Construction & Impounding Jan 2008
CE 18 (Public):
MF 1250 - Numerical Modeling of Muskrat Falls Structures May 2008
CE 19 (Public):
MF 1300 - 2010 Site Investigations Geotechnical Report Vol 1 - June 2011
CE 20 (R1) (Public):
MF 1310 - MF Site Access Review-Technical ReportFeb 11
CE 22 (Public):
MF 1330 - Hydraulic Modeling and Studies - Report 1 - 2010 Update - Oct 10
CE 23 (Public):
MF 1330 -Report 2 - 2010 Update MF PMF & Construction Design Flood Study
CE 24 (Public):
MF 1330 - Report 3 - Dec 2010 MF Dam Break Study
CE 25 (Public):
MF 1330 - Report 4 - 2010 Update March 11 Muskrat Falls Ice Study
CE 27 (R1) (Public):
Summary of Studies on Firm and Average Energy Production June 9, 2011
CE 28 (R1) (Public):
Churchill River Complex - Power and Energy Modeling Study Vol 1 (July 1998)
CE 29 (R1) (Public):
Churchill River Optimization Study Volume 1 (January 1999)
CE 30 (R1) (Public):
Churchill River Optimization Study Volume 2 (January 1999)
CE 31 (R1) (Public):
Gull Island to Soldiers Pond HVDC Interconnection DC System Studies Vol 1
CE 32:
See Exhibit 23
CE 33 (R2) (Public):
Derivation of Long-term Holyrood #6 fuel price forecast for 2010
CE 37:
Exhibit Number Not Used
CE 38:
See Exhibit 99
CE 39:
Exhibit Number Not Used
CE 40 (R2) (Public):
Boskalis Shore Approach Feasibility Study Report
CE 41 (R2) (Public):
Feasibility Study of HDD for the Strait of Belle Isle
CE 42 (R2) (Public):
LCP Rock Berm Concept Development Study Report
CE 43 (R2) (Public):
Lower Churchill Project Shore Approach Feasibility Study Report
CE 44 (R2) (Public):
SOBI Marine Crossing Phase 2 Conceptual Design
CE 46 (R2) (Public):
PM0011 CCGT Capital Cost Benchmark Study Final Report
CE 47 (R1) (Public):
50 MW Gas Turbine - Budget Estimate
CE 48:
See Exhibit 5B
CE 49:
See Exhibit 5C
CE 50 (Public):
Strategist Module Documentation
CE 51 (R1) (Public):
Overview of Decision Gate 2 Capital Cost and Schedule Estimates
CE 52 (R1) (Public):
Technical Note Strategic Risk Analysis and Mitigation
CE 53 (R2) (Public):
ANNUAL FIGURES (Net Cash Flow Analysis PWC 245
CE 54 (R1) (Public):
GI1141 Upper Churchill PMF & Flood Handling Procedures Update August 2009
CE 55 (R1) (Public):
SOBI Submarine Cable Tech RFP - Aug 2011
CE 56 (R1) (Public):
Feasibility Study HTGS Units 1&2 Conversion to Synchronous Condenser
CE 59:
See Exhibit 100
CE 61 (R1) (Public):
PWC Derivation of $76 per MWH LCP DG2.
CE 64 (R1) (Public):
LCP Financial Returns - Muskrat Falls, Serving Island Load Only
CE 68 (R1) (Public):
Listing of 3rd Party Vendors - September 30, 2011
CE 69:
See RFI CA/KPL-Nalcor-55
Additional Exhibits
Muskrat Falls Review - Main Page
Board of Commissioners of Public Utilities
Newfoundland and Labrador
Canada