Public Utilities Board
Muskrat Falls Review
~ Nalcor Exhibits ~
|
NALCOR EXHIBIT FILINGS
|
|
July 6, 2011: Nalcor Submission providing context
for the information provided to the Board
Exhibit 1: NLH 2010 Planning Load Forecast (PLF) for the Island Interconnected System
~ Exhibit 1 Addendum: NLH 2010 PLF for the Island Interconnected System
Exhibit 2:
Load Shape
Exhibit 3:
Nalcor Inflation and Escalation Forecast
~ Exhibit 3 - Part 2:
Nalcor Inflation and Escalation Forecast Part 2 - March 2011
Exhibit 4:
Nalcor / NLH Thermal Fuel Oil Price Forecast Reference Forecast - Jan 2010
Exhibit 5:
Cashflow Calculations for 2010 Generation Expansion Studies Direct Cost
~ Exhibit 5 A:
Capital Cost Estimates - Wind
~ Exhibit 5 B:
Studies for Island Pond Hydroelectric Project dated December 2006
~ Exhibit 5 C:
Feasibility Study for Portland Creek Hydroelectric Project dated January 2007
~ Exhibit 5 D (i):
Feasibility Study Round Pond Development dated February 1989
~ Exhibit 5 D (ii):
Feasibility Study Round Pond Development dated September 1988
~ Exhibit 5 E:
2010 capital Cost Update - Muskrat Falls HVdc Link
~ Exhibit 5 F:
Muskrat Falls Capex 15% Contingency: Quarterly Capex Summary
~ Exhibit 5 G:
Capital Cost Estimates - 50 Mw CT (Greenfield)
~ Exhibit 5 H:
Holyrood Combined Cycle Plant Study Update dated November 2001
~ Exhibit 5 I:
Capital Cost Estimates - 25 MW Wind Farm Hydro-Constructed
~ Exhibit 5 J:
Capital Cost Estimates - Fermeuse Replacement Hydro-constructed
~ Exhibit 5 K:
Capital Cost Estimates - St. Lawrence Wind Farm Replacement Hydro-Constructed
~ Exhibit 5 L (i):
Precipitator and Scrubber Installation Study HTGS dated November 20, 2008
~ Exhibit 5 L (ii):
Capital Cost Estimates - HTGS Environment Improvements - Low NOx Burners
Exhibit 6:
~ Exhibit 6 A:
Hydro PPA Details dated July 2, 2011
~ Exhibit 6 B:
Labrador HVdc Analysis 2010: Input to NLH Generation Planning Analysis
Exhibit 7:
Service Life/Retirement
Exhibit 8:
Muskrat Falls HVdc Link Operating Costs Estimates
Exhibit 9:
Thermal Units - Average Heat Rates
Exhibit 10:
~ Exhibit 10 A:
Net Generation Split 2010
~ Exhibit 10 B:
Annual Average and Firm Energy Production forecasts refer to Exhibit 16
Exhibit 11:
Asset Maintenance Scheduling
Exhibit 12:
Forced Outage Rates Summary Sheet - dated June 29, 2011
Exhibit 13:
~ Exhibit 13 A:
Generation Unit Capacities - By Plant (refer to Exhibit 16)
~ Exhibit 13 B:
Generation Unit Capacities
Exhibit 14:
2010 PLF Strategist Generation Expansion Plan
Exhibit 14 Revision 1:
2010 PLF Strategist Generation Expansion Plans
Exhibit 15:
PPA Supply Price
Exhibit 16:
Generation Planning Issues July 2010
Exhibit 17:
Water Management Agreement 2009
Exhibit 18:
Gull Island to Soldiers Pond HVDC Interconnection (Engineering Review) June 1998
Exhibit 19:
Final Feasibility Study re Musrat Falls Hydroelectric Development dated January 1999
Exhibit 20:
Independent Project Analysis - September 2010
Exhibit 21:
Gate 2 Independent Project Review - (Summary)
Exhibit 22:
Gate 2 Independent Project Review - (Detailed)
Exhibit 23:
Historical Summary Labrador Island HVdc System
Exhibit 24:
Island Transmission System Outlook
Exhibit 25:
Information on Wind Farms
Exhibit 26:
Forced Outage Rates 2006 Update
Exhibit 27:
Summary 2010 Long Term Planning Load Forecast
Exhibit 28:
Refurbishment of Holyrood Generating Station
Exhibit 29:
Cost Effectiveness of Delivering Power from LC to Island - Dec 1980
Exhibit 29 Revision 1:
Cost Effectiveness of Delivering Power from LC to Island - Dec 1980
Exhibit 30:
Lower Churchill Project Design Progression 1998-2011
Exhibit 31:
Lower Churchill Project Cost Estimate Progression 1998 to 2011
Exhibit 32:
Financial Model Input - Capital Cost Information Flow
Exhibit 33:
Summary of Ocean Current Stats - Cable Crossing Strait of Belle Isle (SOBI) - Aug 2010
Exhibit 34:
Review of Fishing Equipment - SOBI
Exhibit 35:
Iceberg Risk to Subsea Cables in SOBI
Exhibit 36:
Purchase Price of Muskrat Falls Energy By Hydro From Nalcor
Exhibit 37:
SOBI Decision Recommendation Oct 12, 2010
Exhibit 38:
Muskrat Falls North Spur 1999 to 2011 (Technical Note)
Exhibit 39:
MF1260 - Assessment of Existing Pumpwell System July 2008
Exhibit 40:
MF1271 - Evaluation of Existing Wells, Pumps and Infastructure March 2010
Exhibit 41:
MF1272 - Installation of New Piezometers April 2010
Exhibit 42:
NLH 2009 Planning Criteria Review
Exhibit 43:
2010 Generation Expansion Scenarios
Exhibit 43 Revision 1:
2010 Generation Expansion Scenarios
Exhibit 44:
Holyrood Condition Assessment & Life Extension Study (AMEC Report)
Exhibit 45:
Key Regression Equations - Load Forecast
Exhibit 46:
NLH Key Load Forecast for Island Interconnected System
Exhibit 47:
Labrador - Island Link Overview - August 8, 2011
Exhibit 48:
HVDC Project Reliability Studies June 1981
Exhibit 49:
LCP Cost Estimating Process Overview - 4-Aug-2011
Exhibit 50:
Churchill River Complex - PMF Review and Development Study - Volume 1 - Jan 1999
Exhibit 51:
Churchill River Complex - PMF Review & Development Study - Vol 2 - Appendices
Exhibit 52:
Island Pond - Granite Canal Reoptimization and Cost Study - Jan 1997
Exhibit 53:
Island Pond - Final Feasibility - Jan 1988
Exhibit 54:
Bay D'Espoir Flood Analysis and Alternatives Study Dec 1985 Acres
Exhibit 55:
Technical Note - Selection of Turbines and Power Transformers
Exhibit 56:
New Dawn Agreement
Exhibit 57:
Reliability Study of the Strait of Belle Isle HVDC Cable System
Exhibit 58:
Total Island Interconnected Load
Exhibit 59:
Preliminary Transmission System Analysis (Nov 2010)
Exhibit 60:
Island Pond Development Pre-Feasibility Report - Septmber 1986
Exhibit 61:
Assessment of Limitations - Non-Dispatchable Generation - Island System
Exhibit 62:
Key Regression Equations
Exhibit 63:
Provincial Economic Data for Hydro's Planning Load Forecast
Exhibit 64:
Forecast Sub-groups for Island Interconnected System
Exhibit 65:
Holyrood Marine Terminal 10 Year Life Extension Study - Final Report - April 2011
Exhibit 66:
Phase I - Investigation of Methods to Improve Emissions Units 1, 2 and 3 - Oct 2002
Exhibit 67:
Engineering Report - HGS MCC Assessment - Jan 2009
Exhibit 68:
Air Emissions Controls Assessment - HTGS - Final Report - Feb 2004
Exhibit 69:
Studies for Island Pond Hydroelectric Project - Geotechnical Site Investigations
Exhibit 70:
NLH 2010 Generation Expansion Analysis - Other Power Purchases
Exhibit 71:
Meteorological Study: Gull Island - Stephenville - Holyrood Transmission Line Routes
Exhibit 72:
The Follow-On Meteorological Evaluation of Proposed Gull Island Transmission Line
Exhibit 73:
Meteorological Evaluation of Wind / Ice Loadings for Portion of Gull Island Trans Line
Exhibit 74:
Meterology Research - Technical Reports
Exhibit 75:
Climatological Program 1977-78 Weather Study Ref 2
Exhibit 76:
Report Climatological Program 1978-79 Ref 3
Exhibit 77:
Report Climatological Program 1979-80 Ref 4
Exhibit 78:
Report Climatological Program 1980-81 Ref 5
Exhibit 79:
Report Climatological Program 1981-82 Ref 6
Exhibit 80:
Report Climatological Program 1982-83 Ref 7
Exhibit 81:
Report Climatological Program 1983-84 Ref 8
Exhibit 82:
Report Climatological Program 1984-85 Ref 9
Exhibit 83:
Report Climatological Program 1985-86 Ref 10
Exhibit 84:
Report Climatological Program 1986-87 Ref 11
Exhibit 85:
Reliability Study of Transmission Lines on Avalon and Connaigre Peninsulas
Exhibit 86:
20 Years of Ice Monitoring Experience on Overhead Lines in NL Ref 13
Exhibit 87:
Assessment of Probabilistic Climatic Loadings 230 kv Ref 14
Exhibit 88:
5th International Workshop on Atmospheric Icing of Structures Ref 15.
Exhibit 89:
Upgrading of 230KV Steel Trans Line System - Probabilistic Approach 2006 Ref 16
Exhibit 90:
IEEE Canadian Review-NLH Wind and Ice Load Monitoring Test Facility Ref 17
Exhibit 91:
HVDC Lab-Island Trans Link - In-cloud icing: Long Range Mountain Ridge Ref 18
Exhibit 92:
DC1070 - Preliminary Meteorological Load Review - 2008 Ref 19
Exhibit 93:
Validation of Ice Accretion Models for Freezing Precipitation Using Field Data Ref 20
Exhibit 94:
HVdc Lab-NL Trans Link Ice Loading on HVdc line crossing Long Range Mountains
Exhibit 95:
Evaluation of Icing in LRM (Version 2011-03-09) Ref 21(2)
Exhibit 96:
Evaluate extreme ice loads from freezing rain - NLH-Final Report 2010 Ref 22
Exhibit 97:
Review of Existing Meteorological Studies Conducted on Lab-Island Trans Link 2011
Exhibit 97 Appendix A Revision 1:
Revision to Pages 15 - 23
Exhibit 98:
Please refer to Exhibit 69
Exhibit 99:
CPWs - Isolated Island Scenario and Labrador Infeed Scenario
Exhibit 100:
Output from 2010 Isolated Island Strategist Run
Exhibit 101:
Navigant Independent Supply Decision Review - Sept 2011
Exhibit 102:
Provincial Generation and Transmission Grid Graphic
Exhibit 103:
Island Interconnected Requirements - Actual and Forecasts
Exhibit 104:
Navigant Key Personnel CVs
Exhibit 105:
Transmission Planning Manual, Rev 2, 2009.
Exhibit 106:
Lab – Island HVdc Link & Island Interconnected System Reliability, 2011
Exhibit 107:
Government of Canada, Canada Gazette Part I, August 27, 2011
Exhibit 108:
Technical Feasibility of Offshore Natural Gas and Gas Liquid Development
Based on Submarine Pipeline Transportation System
Exhibit 109:
Clean Air Regulatory Agenda - Reg Framework for Industrial Air Emissions - 2007
Exhibit 110:
Boundry Dam Integrated Carbon Capture & Storage (BD3 ICCS) Demonstration Project
Exhibit 111:
PLF10 Isolated Island - Capital Expenditures by Year
Exhibit 112:
PLF10 Interconnected Island - Capital Expenditures by Year
Exhibit 113:
IR#JRP.165 - Alternative Means of Carrying Out the Project
Exhibit 114:
Upgrade Transmission Line Corridor – Bay d’Espoir to Western Avalon Sept 2011
Exhibit 115:
NLH 2010 Capital Budget Application - Volume II
Exhibit 116:
Inventory of Small Hydro Sites for Energy Supply to the Island Grid: Volume I
Exhibit 117:
Petroleum Products Prices
Exhibit 118:
NEB: Canada's Energy Future - Energy Supply and Demand Projections to 2035
|
Board of Commissioners of Public Utilities
Newfoundland and Labrador
Canada
|