NALCOR EXHIBIT FILINGS
    July 6, 2011: Nalcor Submission providing context for the information provided to the Board
     Exhibit 1: NLH 2010 Planning Load Forecast (PLF) for the Island Interconnected System
         ~ Exhibit 1 Addendum: NLH 2010 PLF for the Island Interconnected System
     Exhibit 2: Load Shape
     Exhibit 3: Nalcor Inflation and Escalation Forecast
        ~ Exhibit 3 - Part 2: Nalcor Inflation and Escalation Forecast Part 2 - March 2011
     Exhibit 4: Nalcor / NLH Thermal Fuel Oil Price Forecast Reference Forecast - Jan 2010
     Exhibit 5: Cashflow Calculations for 2010 Generation Expansion Studies Direct Cost
         ~ Exhibit 5 A: Capital Cost Estimates - Wind
         ~ Exhibit 5 B: Studies for Island Pond Hydroelectric Project dated December 2006
         ~ Exhibit 5 C: Feasibility Study for Portland Creek Hydroelectric Project dated January 2007
         ~ Exhibit 5 D (i): Feasibility Study Round Pond Development dated February 1989
         ~ Exhibit 5 D (ii): Feasibility Study Round Pond Development dated September 1988
         ~ Exhibit 5 E: 2010 capital Cost Update - Muskrat Falls HVdc Link
         ~ Exhibit 5 F: Muskrat Falls Capex 15% Contingency: Quarterly Capex Summary
         ~ Exhibit 5 G: Capital Cost Estimates - 50 Mw CT (Greenfield)
         ~ Exhibit 5 H: Holyrood Combined Cycle Plant Study Update dated November 2001
         ~ Exhibit 5 I: Capital Cost Estimates - 25 MW Wind Farm Hydro-Constructed
         ~ Exhibit 5 J: Capital Cost Estimates - Fermeuse Replacement Hydro-constructed
         ~ Exhibit 5 K: Capital Cost Estimates - St. Lawrence Wind Farm Replacement Hydro-Constructed
         ~ Exhibit 5 L (i): Precipitator and Scrubber Installation Study HTGS dated November 20, 2008
         ~ Exhibit 5 L (ii): Capital Cost Estimates - HTGS Environment Improvements - Low NOx Burners
     Exhibit 6:
          ~ Exhibit 6 A: Hydro PPA Details dated July 2, 2011
          ~ Exhibit 6 B: Labrador HVdc Analysis 2010: Input to NLH Generation Planning Analysis
     Exhibit 7: Service Life/Retirement
     Exhibit 8: Muskrat Falls HVdc Link Operating Costs Estimates
     Exhibit 9: Thermal Units - Average Heat Rates
     Exhibit 10:
          ~ Exhibit 10 A: Net Generation Split 2010
          ~ Exhibit 10 B: Annual Average and Firm Energy Production forecasts refer to Exhibit 16
     Exhibit 11: Asset Maintenance Scheduling
     Exhibit 12: Forced Outage Rates Summary Sheet - dated June 29, 2011
     Exhibit 13:
          ~ Exhibit 13 A: Generation Unit Capacities - By Plant (refer to Exhibit 16)
          ~ Exhibit 13 B: Generation Unit Capacities
     Exhibit 14: 2010 PLF Strategist Generation Expansion Plan
          Exhibit 14 Revision 1: 2010 PLF Strategist Generation Expansion Plans
     Exhibit 15: PPA Supply Price
     Exhibit 16: Generation Planning Issues July 2010
     Exhibit 17: Water Management Agreement 2009
     Exhibit 18: Gull Island to Soldiers Pond HVDC Interconnection (Engineering Review) June 1998
     Exhibit 19: Final Feasibility Study re Musrat Falls Hydroelectric Development dated January 1999
     Exhibit 20: Independent Project Analysis - September 2010
     Exhibit 21: Gate 2 Independent Project Review - (Summary)
     Exhibit 22: Gate 2 Independent Project Review - (Detailed)
     Exhibit 23: Historical Summary Labrador Island HVdc System
     Exhibit 24: Island Transmission System Outlook
     Exhibit 25: Information on Wind Farms
     Exhibit 26: Forced Outage Rates 2006 Update
     Exhibit 27: Summary 2010 Long Term Planning Load Forecast
     Exhibit 28: Refurbishment of Holyrood Generating Station
     Exhibit 29: Cost Effectiveness of Delivering Power from LC to Island - Dec 1980
          Exhibit 29 Revision 1: Cost Effectiveness of Delivering Power from LC to Island - Dec 1980
     Exhibit 30: Lower Churchill Project Design Progression 1998-2011
     Exhibit 31: Lower Churchill Project Cost Estimate Progression 1998 to 2011
     Exhibit 32: Financial Model Input - Capital Cost Information Flow
     Exhibit 33: Summary of Ocean Current Stats - Cable Crossing Strait of Belle Isle (SOBI) - Aug 2010
     Exhibit 34: Review of Fishing Equipment - SOBI
     Exhibit 35: Iceberg Risk to Subsea Cables in SOBI
     Exhibit 36: Purchase Price of Muskrat Falls Energy By Hydro From Nalcor
     Exhibit 37: SOBI Decision Recommendation Oct 12, 2010
     Exhibit 38: Muskrat Falls North Spur 1999 to 2011 (Technical Note)
     Exhibit 39: MF1260 - Assessment of Existing Pumpwell System July 2008
     Exhibit 40: MF1271 - Evaluation of Existing Wells, Pumps and Infastructure March 2010
     Exhibit 41: MF1272 - Installation of New Piezometers April 2010
     Exhibit 42: NLH 2009 Planning Criteria Review
     Exhibit 43: 2010 Generation Expansion Scenarios
          Exhibit 43 Revision 1: 2010 Generation Expansion Scenarios
     Exhibit 44: Holyrood Condition Assessment & Life Extension Study (AMEC Report)
     Exhibit 45: Key Regression Equations - Load Forecast
     Exhibit 46: NLH Key Load Forecast for Island Interconnected System
     Exhibit 47: Labrador - Island Link Overview - August 8, 2011
     Exhibit 48: HVDC Project Reliability Studies June 1981
     Exhibit 49: LCP Cost Estimating Process Overview - 4-Aug-2011
     Exhibit 50: Churchill River Complex - PMF Review and Development Study - Volume 1 - Jan 1999
     Exhibit 51: Churchill River Complex - PMF Review & Development Study - Vol 2 - Appendices
     Exhibit 52: Island Pond - Granite Canal Reoptimization and Cost Study - Jan 1997
     Exhibit 53: Island Pond - Final Feasibility - Jan 1988
     Exhibit 54: Bay D'Espoir Flood Analysis and Alternatives Study Dec 1985 Acres
     Exhibit 55: Technical Note - Selection of Turbines and Power Transformers
     Exhibit 56: New Dawn Agreement
     Exhibit 57: Reliability Study of the Strait of Belle Isle HVDC Cable System
     Exhibit 58: Total Island Interconnected Load
     Exhibit 59: Preliminary Transmission System Analysis (Nov 2010)
     Exhibit 60: Island Pond Development Pre-Feasibility Report - Septmber 1986
     Exhibit 61: Assessment of Limitations - Non-Dispatchable Generation - Island System
     Exhibit 62: Key Regression Equations
     Exhibit 63: Provincial Economic Data for Hydro's Planning Load Forecast
     Exhibit 64: Forecast Sub-groups for Island Interconnected System
     Exhibit 65: Holyrood Marine Terminal 10 Year Life Extension Study - Final Report - April 2011
     Exhibit 66: Phase I - Investigation of Methods to Improve Emissions Units 1, 2 and 3 - Oct 2002
     Exhibit 67: Engineering Report - HGS MCC Assessment - Jan 2009
     Exhibit 68: Air Emissions Controls Assessment - HTGS - Final Report - Feb 2004
     Exhibit 69: Studies for Island Pond Hydroelectric Project - Geotechnical Site Investigations
     Exhibit 70: NLH 2010 Generation Expansion Analysis - Other Power Purchases
     Exhibit 71: Meteorological Study: Gull Island - Stephenville - Holyrood Transmission Line Routes
     Exhibit 72: The Follow-On Meteorological Evaluation of Proposed Gull Island Transmission Line
     Exhibit 73: Meteorological Evaluation of Wind / Ice Loadings for Portion of Gull Island Trans Line
     Exhibit 74: Meterology Research - Technical Reports
     Exhibit 75: Climatological Program 1977-78 Weather Study Ref 2
     Exhibit 76: Report Climatological Program 1978-79 Ref 3
     Exhibit 77: Report Climatological Program 1979-80 Ref 4
     Exhibit 78: Report Climatological Program 1980-81 Ref 5
     Exhibit 79: Report Climatological Program 1981-82 Ref 6
     Exhibit 80: Report Climatological Program 1982-83 Ref 7
     Exhibit 81: Report Climatological Program 1983-84 Ref 8
     Exhibit 82: Report Climatological Program 1984-85 Ref 9
     Exhibit 83: Report Climatological Program 1985-86 Ref 10
     Exhibit 84: Report Climatological Program 1986-87 Ref 11
     Exhibit 85: Reliability Study of Transmission Lines on Avalon and Connaigre Peninsulas
     Exhibit 86: 20 Years of Ice Monitoring Experience on Overhead Lines in NL Ref 13
     Exhibit 87: Assessment of Probabilistic Climatic Loadings 230 kv Ref 14
     Exhibit 88: 5th International Workshop on Atmospheric Icing of Structures Ref 15.
     Exhibit 89: Upgrading of 230KV Steel Trans Line System - Probabilistic Approach 2006 Ref 16
     Exhibit 90: IEEE Canadian Review-NLH Wind and Ice Load Monitoring Test Facility Ref 17
     Exhibit 91: HVDC Lab-Island Trans Link - In-cloud icing: Long Range Mountain Ridge Ref 18
     Exhibit 92: DC1070 - Preliminary Meteorological Load Review - 2008 Ref 19
     Exhibit 93: Validation of Ice Accretion Models for Freezing Precipitation Using Field Data Ref 20
     Exhibit 94: HVdc Lab-NL Trans Link Ice Loading on HVdc line crossing Long Range Mountains
     Exhibit 95: Evaluation of Icing in LRM (Version 2011-03-09) Ref 21(2)
     Exhibit 96: Evaluate extreme ice loads from freezing rain - NLH-Final Report 2010 Ref 22
     Exhibit 97: Review of Existing Meteorological Studies Conducted on Lab-Island Trans Link 2011
         Exhibit 97 Appendix A Revision 1: Revision to Pages 15 - 23
     Exhibit 98: Please refer to Exhibit 69
     Exhibit 99: CPWs - Isolated Island Scenario and Labrador Infeed Scenario
     Exhibit 100: Output from 2010 Isolated Island Strategist Run
     Exhibit 101: Navigant Independent Supply Decision Review - Sept 2011
     Exhibit 102: Provincial Generation and Transmission Grid Graphic
     Exhibit 103: Island Interconnected Requirements - Actual and Forecasts
     Exhibit 104: Navigant Key Personnel CVs
     Exhibit 105: Transmission Planning Manual, Rev 2, 2009.
     Exhibit 106: Lab – Island HVdc Link & Island Interconnected System Reliability, 2011
     Exhibit 107: Government of Canada, Canada Gazette Part I, August 27, 2011
     Exhibit 108: Technical Feasibility of Offshore Natural Gas and Gas Liquid Development Based on Submarine Pipeline Transportation System
     Exhibit 109: Clean Air Regulatory Agenda - Reg Framework for Industrial Air Emissions - 2007
     Exhibit 110: Boundry Dam Integrated Carbon Capture & Storage (BD3 ICCS) Demonstration Project
     Exhibit 111: PLF10 Isolated Island - Capital Expenditures by Year
     Exhibit 112: PLF10 Interconnected Island - Capital Expenditures by Year
     Exhibit 113: IR#JRP.165 - Alternative Means of Carrying Out the Project
     Exhibit 114: Upgrade Transmission Line Corridor – Bay d’Espoir to Western Avalon Sept 2011
     Exhibit 115: NLH 2010 Capital Budget Application - Volume II
     Exhibit 116: Inventory of Small Hydro Sites for Energy Supply to the Island Grid: Volume I
     Exhibit 117: Petroleum Products Prices
     Exhibit 118: NEB: Canada's Energy Future - Energy Supply and Demand Projections to 2035