Home - Public Utilities - Board Orders
Orders Issued by the Board prior to 2023 under the Public Utilities Act  


Order
Date Issued
Applicant
Application Type
Application Description
01/20/23
NP
Contribution in Aid of Construction
Application by Newfoundland Power Inc. in accordance with Order No. P.U. 4 (1997-98) to update the cost factors used in its Contribution in Aid of Construction policy.
01/26/23
NLH

Capital Budget

Application approving capital expenditures for 2023 projects and multi-year projects commencing in 2023; (b) approving its 2023 Capital Budget; and (c) fixing and determining its average rate base for 2021.
03/15/23
NLH

Capital Budget

Application approving capital expenditures for 2023 projects and multi-year projects commencing in 2023; (b) approving its 2023 Capital Budget; and (c) fixing and determining its average rate base for 2021.
01/26/23
NLH

Rate Stabilization

Application by Newfoundland and Labrador Hydro for approval of Island Industrial Customer rates to reflect revisions with respect to the Island Industrial Customer Rate Stabilization Plan Adjustments.
03/10/23
NLH

Costs

Application for the Abandonment of Transmission Line L1301 - Labrador Interconnected Group Costs Submission as per Order No. P.U. 29(2022)
03/17/23
NP
Contribution in Aid of Construction
Application by Newfoundland Power Inc. for approval of a Contribution in Aid of Construction for an Upgrade to Long Pond Substation for Memorial University of Newfoundland, pursuant to section 41 of the Act.
04/12/23
NLH

Supplemental Capital Expenditure

Application by Newfoundland and Labrador Hydro for approval of capital expenditures for section replacement and weld refurbishment of Penstock 1 at the Bay d’Espoir Hydroelectric Generating Facility, pursuant to subsection 41(3) of the Act.
04/13/23
NLH

Deferrals, Accounts and Reserves

Application by Newfoundland and Labrador Hydro for recovery of the 2022 balance in the Isolated Systems Supply Cost Variance Deferral Account pursuant to sections 70(1) and 80 of the Act.
04/17/23
NP
Deferrals, Accounts and Reserves
Application by Newfoundland Power Inc. for approval of the disposition of the 2022 balance in the Demand Management Incentive Account pursuant to sections 58 and 80 of the Act.
04/17/23
NP
Deferrals, Accounts and Reserves
Application by Newfoundland Power Inc. for approval of the balance in the Weather Normalization Reserve as of December 31, 2022 pursuant to sections 69(3) and 78 of the Act.
04/18/23
NLH
Abandonment of Plant or Service
Application by Newfoundland and Labrador Hydro for consent to abandon the hydrogen system portion of the Ramea Wind-Hydrogen-Diesel Generation Project, pursuant to section 38 of the Act.
04/28/23
NLH
Rates
Application by Newfoundland and Labrador Hydro, acting in its capacity as the Newfoundland and Labrador System Operator, for approval of the effective date of interim transmission rates applicable post commissioning of the Labrador-Island Link, pursuant to sections 71 and 75 of the Act.
05/05/23
NLH
Supplemental Capital Expenditure
Application by Newfoundland and Labrador Hydro for approval of a capital expenditure for the purchase and replacement of last stage blades for Units 1 and 2 at the Holyrood Thermal Generating Station, pursuant to section 41 of the Act.
05/31/23
NLH
Award of Costs
2023 Capital Budget Application as per Order No. P.U. 2(2023) - Labrador Interconnected Group Costs Application - Order
05/31/23
NP
Supplemental Capital Expenditure
Application by Newfoundland Power Inc. for the approval of supplemental capital expenditures to proceed with the purchase and installation of a replacement power transformer for Memorial Substation pursuant to section 41(3) of the Act.
06/01/23
NLH
Rates
Application by Newfoundland and Labrador Hydro for approval, pursuant to sections 70(1) and 71 of the Act, of a revised Utility Rate reflecting updated Rate Stabilization Plan Current Plan and Conservation and Demand Management Cost Recovery adjustments and continuation of the Project Cost Recovery Rider.
06/19/23
NLH
Rules and Regulations (Service Agreements)
Application by Newfoundland and Labrador Hydro for an exemption to Regulation 17 of its rules and regulations and approval of an Upstream Capacity Charge pursuant to the Network Additions Policy.
06/23/23
NP
Rates
Application by Newfoundland Power Inc. pursuant to sections 70 and 71 of the Act for approval of: (i) revised rate stabilization and municipal tax adjustments for the period July 1, 2023 to June 30, 2024; and (ii) a revised Schedule of Rates, Tolls and Charges.
06/28/23
NLH
Rates
Application by Newfoundland and Labrador Hydro for approval of a change in rates to be charged to its Island Interconnected, L’Anse au Loup and Isolated Rural customers.
07/21/23
NLH
Rates
Application by Newfoundland and Labrador Hydro for the approval of a change in the Conservation and Demand Management Cost Recovery Adjustment to be charged to Island Industrial customers effective July 1, 2023.
07/21/23
NP
Security Issues
Application by Newfoundland Power Inc. for approval to issue Series AS First Mortgage Bonds pursuant to section 91 of the Act.
08/14/23
NLH
Supplemental Capital Expenditure
Application by Newfoundland and Labrador Hydro for approval of a capital expenditure for the construction and installation of ultra-fast electric vehicle chargers, pursuant to section 41 of the Act.
08/22/23
NLH
Contribution in Aid of Construction
Application by Newfoundland Power Inc. for approval of a Contribution in Aid of Construction for a line extension to serve customers in the cottage area known as Jonathan’s Pond, near the Town of Gander pursuant to section 41 of the Act.
08/31/23
NP
Deferrals, Accounts and Reserves
Application by Newfoundland Power Inc. for approval to recover costs through its Electrification Cost Deferral Account to complete a pilot project to assess load management strategies for electric vehicles.
09/21/23
NLH
Reviews, Plans and Studies
Application for approval of Newfoundland and Labrador Hydro’s Network Additions Policy for the Labrador Interconnected system in Order No. P.U. 7(2021); and Newfoundland and Labrador Hydro’s request to change reporting requirements set out in Order No. P.U. 7(2021).
09/25/23
NLH
Contribution in Aid of Construction
Application by Newfoundland and Labrador Hydro for approval of a contribution towards the cost of improvements from Iron Ore Company of Canada, pursuant to section 41(5) of the Act.
10/03/23
NP
Contribution in Aid of Construction
Application by Newfoundland Power Inc. for approval of a Contribution in Aid of Construction for a single-phase extension to the Northbrook Road cottage area, pursuant to section 41 of the Act.
10/13/23
NP
Contribution in Aid of Construction
Application by Newfoundland Power Inc. for approval of a Contribution in Aid of Construction to provide three-phase service to two dairy farms located in the Town of Cormack, pursuant to section 41 of the Act.
10/18/23
NLH
Supplemental Capital Expenditure
Application by Newfoundland and Labrador Hydro for approval of a capital expenditure for the purchase of a Spare Generator Step-Up Transformer, pursuant to section 41 of the Act.
12/01/23
NLH
Contribution in Aid of Construction
Application by Newfoundland and Labrador Hydro for approval of a Contribution in Aid of Construction for a single-phase extension to a water treatment building in the Town of L’Anse Au Clair, pursuant to section 41 of the Act.
12/12/23
NLH
Rules and Regulations (Service Agreements)
Application by Newfoundland and Labrador Hydro for approval of an extension of the Third Amended and Restated Pilot Agreement for the Optimization of Hydraulic Resources pursuant to section 3(b)(iii) of the EPCA and sections 70 and 76 of the Act.
12/12/23
NLH
Contribution in Aid of Construction
Application by Newfoundland and Labrador Hydro for approval of a contribution towards the cost of improvements for Braya Renewable Fuels (Newfoundland) GP Inc., pursuant to section 41(5) of the Act.
12/18/23
NLH
Rules and Regulations (Service Agreements)
Application by Newfoundland and Labrador Hydro for approval of the terms of a Capacity Assistance Agreement between Hydro and Corner Brook Pulp and Paper Limited, pursuant to sections 70, 71 and 80 of the Act.
12/19/23
NLH
Deferrals, Accounts and Reserves
Application by Newfoundland and Labrador Hydro for approval of a deferral account to provide for recovery of costs for electrification programs under its Electrification, Conservation and Demand Management Plan pursuant to subsection 58 of the Act.
12/19/23
NLH
Rates
Application by Newfoundland and Labrador Hydro for approval of a rate for non-firm service in Labrador, revisions to the Island Industrial customer non-firm rate, the discontinuance of the Labrador secondary energy rate and a revision to the Supply Cost Variance Deferral Account definition.
12/21/23
NLH
Capital Budget
Application by Newfoundland and Labrador Hydro for an Order pursuant to sections 41 and 78 of the Act: (a) approving capital expenditures for 2024 projects and multi-year projects commencing in 2024; (b) approving its 2024 Capital Budget; and (c) fixing and determining its average rate base for 2022.

Order
Date Issued
Applicant
Application Type
Application Description
01/12/22
Hydro
Award of Costs
Application by Newfoundland and Labrador Hydro for approval of a Network Additions Policy for the Labrador Interconnected system; and an application for costs by the communities of Sheshatshiu, Happy Valley-Goose Bay, Wabush and Labrador City.
01/21/22
Hydro
Rates
Application by Newfoundland and Labrador Hydro for approval to continue the current Island Industrial Customer rates pursuant to sections 70(1) and 71 of the Act.
01/05/23
NP
General Rates
A general rate application filed by Newfoundland Power Inc. for approval of, inter alia, rates to be charged to its customers for 2022 and 2023.
02/21/22
Hydro
Deferrals, Accounts and Reserves
Application by Newfoundland and Labrador Hydro for approval of changes to various deferral account definitions, approval of changes to the rules and regulations applicable to the Rate Stabilization Plan, and other matters reflecting the determinations set out in Order No. P.U. 33(2021).
01/24/22
Hydro
Rate Stabilization
Application by Newfoundland and Labrador Hydro for approval of Island Industrial Customer rates to reflect revisions with respect to the Island Industrial Customers Rate Stabilization Plan adjustments.
02/24/22
Hydro
Rates
Application by Newfoundland and Labrador Hydro for approval of a change in rates to be charged to its Island Interconnected, L'Anse au Loup and Isolated Rural customers.
03/07/22
NP
Security Issues
Application by Newfoundland Power Inc. for approval to issue Series AR First Mortgage Bonds pursuant to section 91 of the Act.
03/24/22
Hydro
Contribution in Aid of Construction
Application by Newfoundland and Labrador Hydro for approval of a Contribution in Aid of Construction for a single-phase to three-phase upgrade for a Parks Canada Visitor Information Centre, pursuant to section 41 of the Act.
04/06/22
Hydro
Supplemental Capital Expenditure
Application by Newfoundland and Labrador Hydro for approval of supplemental capital expenditures related to the 2022 Allowance for Unforeseen Items for the construction and purchase of certain improvements and additions to its property pursuant to section 41 of the Act.
04/12/22
NP
Deferrals, Accounts and Reserves
Application by Newfoundland Power Inc. for approval of the disposition of the 2021 balance in the Demand Management Incentive Account pursuant to sections 58 and 80 of the Act.
04/12/22
NP
Deferrals, Accounts and Reserves
Application by Newfoundland Power Inc. for approval of the balance in the Weather Normalization Reserve as of December 31, 2021 pursuant to sections 69(3) and 78 of the Act.
04/22/22
Hydro
Supplemental Capital Expenditure
Application by Newfoundland and Labrador Hydro for approval of a capital expenditure for the roof replacement of the Makkovik Diesel Generating Station pursuant to section 41 of the Act.
04/28/22
NP
Contribution in Aid of Construction
Application by Newfoundland Power Inc. for approval of a Contribution in Aid of Construction for three-phase service for Corner Brook Acute Care Hospital, pursuant to section 41 of the Act.
05/03/22
Hydro
Supplemental Capital Expenditure
Application by Newfoundland and Labrador Hydro for approval of the purchase and installation of a new diesel engine for the Mary's Harbour Diesel Generating Station pursuant to section 41 of the Act.
05/06/22
Hydro
Rules and Regulations (Service Agreements)
Application by Newfoundland and Labrador Hydro for an exemption to Regulation 17 of its rules and regulations and approval of an Upstream Capacity Charge pursuant to the Network Additions Policy.
05/06/22
Hydro
Deferrals, Accounts and Reserves
Application by Newfoundland and Labrador Hydro for recovery of the 2021 balances in (i) the Isolated Systems Supply Cost Variance Deferral Account, (ii) the Revised Energy Supply Cost Variance Deferral Account, and (iii) the Holyrood Conversion Rate Deferral Account, pursuant to sections 70(1) and 80 of the Act.
05/20/22
Hydro
Supplemental Capital Expenditure
Application by Newfoundland and Labrador Hydro for approval to purchase one set of last stage blades to serve as capital spares for Units 1 and 2 at the Holyrood Thermal Generating Station, pursuant to section 41(3) of the Act.
05/20/22
Hydro
Supplemental Capital Expenditure
Application by Newfoundland and Labrador Hydro for approval of Rotor Rim Shrinking and Stator Recentering at the Upper Salmon Hydroelectric Generating Station pursuant to section 41 of the Act.
06/21/22
Hydro
Rates
Application by Newfoundland and Labrador Hydro for approval, pursuant to sections 70(1) and 71 of the Act, of a revised Utility Rate reflecting updated Rate Stabilization Plan Current Plan and Conservation and Demand Management Cost Recovery adjustments and the addition of a Project Cost Recovery Rider.
06/29/22
NP
Rates
Application filed by Newfoundland Power Inc. for approval pursuant to sections 70 and 71 of the Act for approval of: (i) revised rate stabilization and municipal; (ii) tax adjustments for the period July 1, 2022 to June 30, 2023; and (iii) a revised schedule of rates, tolls and charges; and revisions to the Rate Stabilization Clause.
06/30/22
Hydro
Rates
Application by Newfoundland Hydro for approval of a change in rates to be charged to its Island Interconnected, L’Anse au Loup and Isolated Rural customers.
07/06/22
Hydro
Rates
Application by Newfoundland and Labrador Hydro for an order approving a revised Demand Revenue Credit per kW for use in the Labrador Network Additions Policy pursuant to section 70(1) of the Act.
07/08/22
Hydro
Rates
Application by Newfoundland Hydro for the approval of a change in the Conservation and Demand Management Cost Recovery Adjustment to be charged to Island Industrial customers effective July 1, 2022.
08/18/22
Hydro
Supplemental Capital Expenditure
Application by Newfoundland and Labrador Hydro for an Order approving supplemental capital expenditures for four projects at the Holyrood Thermal Generating Station
08/18/22
Hydro
Rates
Application by Newfoundland Hydro for approval of a change in rates to be charged to its Island Interconnected, L’Anse au Loup and Isolated Rural customers.
08/19/22
Hydro
Supplemental Capital Expenditure
Application by Newfoundland and Labrador Hydro for approval of capital expenditures to construct a new three-phase line in Hampden.
08/22/22
Hydro
Supplemental Capital Expenditure
Application by Newfoundland and Labrador Hydro for approval the recovery of costs associated with the Business Systems Transformation Program.
08/22/22
Hydro
Supplemental Capital Expenditure
Application by Newfoundland and Labrador Hydro for approval to Relocate a Distribution Line and for the Contribution by Anaconda Mining Equal to the Cost of the Relocation
09/12/22
Hydro
Abandonment of Plant
Application by Newfoundland and Labrador Hydro for consent to abandon Transmission Line L1301.
10/07/22
Hydro
Supplemental Capital Expenditure
Application by Newfoundland and Labrador Hydro for a change or modification to Order No. P.U. 24(2022) pursuant to section 28(2) of the Board of Commissioners of Public Utilities Regulations, 1996 (the “Regulations”).
10/18/22
Hydro
Contribution in Aid of Construction
Application by Newfoundland and Labrador Hydro for approval of a Contribution in Aid of Construction for a line extension to serve customers in the cottage area known as Thorne Lake, near the Town of Labrador City pursuant to section 41 of the Act.
11/07/22
Hydro
Supplemental Capital Expenditure
Application by Newfoundland and Labrador Hydro for approval of capital expenditures necessary to address supply in Charlottetown and Pinsent’s Arm, Labrador, pursuant to section 41(3) of the Act.
11/10/22
NP and Hydro
Deferrals, Accounts and Reserves
Application by Newfoundland and Labrador Hydro and Newfoundand Power on June 16, 2021 for approvals with respect to its conservation and demand management and electrification programming.
11/25/22
Hydro
Rules and Regulations (Service Agreements)
Application by Newfoundland and Labrador Hydro for approval of certain rules and regulations pertaining to the supply of electrical power and energy to one of its Island Industrial customers, Marathon Gold Corporation, pursuant to section 71 of the Act.
12/16/22
Hydro
Rules and Regulations (Service Agreements)
Application by Newfoundland and Labrador Hydro for approval of a Third Amended and Restated Pilot Agreement for the Optimization of Hydraulic Resources pursuant to section 3(b)(iii) of the EPCA and sections 70 and 76 of the Act.
12/16/22
Hydro
Rules and Regulations (Service Agreements)
Application by Newfoundland and Labrador Hydro for approval of the extension of a temporary service agreement with a customer in Labrador West pursuant to section 71 of the Act.
12/16/22
Hydro
Deferrals, Accounts, and Reserves
Application by Newfoundland and Labrador Hydro for approval of a change in its Conservation and Demand Management Deferral Account pursuant to section 70(1) of the Act.
12/20/22
NP
Capital Budget
Application by Newfoundland Power Inc. for an Order pursuant to sections 41 and 78 of the Act:
     (a) approving a 2023 Capital Budget of $123,463,000;
     (b) approving capital expenditures related to multi-year projects commencing in 2023; and
     (c) fixing and determining a 2021 rate base of $1,202,946,000.

Order
Date Issued
Applicant
Application Type
Application Description
01/12/21
Hydro
Deferrals, Accounts and Reserves
Application by Newfoundland and Labrador Hydro for approval of a revision to the Revised Energy Supply Cost Variance Deferral Account, pursuant to Order No. P.U. 29(2020).
01/15/21
Hydro
Capital Budget
Application by Newfoundland and Labrador Hydro for approval for an Order, pursuant to sections 41 and 78 of the Act: (a) approving its 2021 capital purchases and construction projects in excess of $50,000; (b) approving its 2021 Capital Budget of $107,452,400; and (c) fixing and determining its average rate base for 2017, 2018, and 2019 in the amounts of $2,068,754,000, $2,265,683,000, and $2,306,047,000 respectively.
01/25/21
Hydro
Rates
Application by Newfoundland and Labrador Hydro, acting in its capacity as the Newfoundland and Labrador System Operator, for approval of amendments to the pro-forma Transmission Service Agreements, the rates and rate methodology and the Transmission Policies and Procedures, pursuant to sections 71 and 75 of the Act.
01/26/21
Hydro
Rules and Regulations (Service Agreements)
Application by Newfoundland and Labrador Hydro, of a revised Power Service Agreement, a Firm Energy Power Purchase Agreement, and a Second Amended and Restated Capacity Assistance Agreement between Hydro and Corner Brook Pulp and Paper Limited, pursuant to sections 70, 71 and 80 of the Act.
01/28/21
Hydro
Rate Stabilization
Application by Newfoundland and Labrador Hydro for approval to continue the current Island Industrial Customer rates pursuant to sections 70(1) and 71 of the Act.
02/25/21
Hydro
Rate Stabilization
Application by Newfoundland and Labrador Hydro for approval pursuant to sections 70(1) and 76 of the Act, for the approval of the 2021 Island Industrial Customer Rate Stabilization Plan Adjustments in accordance with the Rate Stabilization Plan Rules.
03/17/21
Hydro
Reviews, Plans and Studies
Approval of Newfoundland and Labrador Hydro’s Network Additions Policy for the Labrador Interconnected system.
03/24/21
Hydro
Deferrals, Accounts and Reserves
Application by Newfoundland and Labrador Hydro for approval of an amendment to the Reliability and Resource Adequacy Deferral Account Definition pursuant to sections 58 and 80 of the Act.
03/26/21
Hydro
Deferrals, Accounts and Reserves
Application by Newfoundland and Labrador Hydro for approval of two exceptions to financial reporting requirements relating to the Muskrat Falls Power Purchase Agreement and the deferral and recovery of capital-related overhead costs, pursuant to section 58 of the Act.
03/26/21
NP
Capital Budget
Application by Newfoundland Power Inc. for an Order pursuant to sections 41 and 78 of the Act: (a) approving a 2021 Capital Budget of $111,298,000; (b) approving certain capital expenditures related to multi-year projects commencing in 2021; and (c) fixing and determining a 2019 rate base of $1,153,556,000; and Order No. P.U. 37(2020) in relation to Newfoundland Power Inc.’s 2021 Capital Budget Application; and Newfoundland Power’s request for approval of proposed expenditures associated with a new substation for St. John’s North-Portugal Cove. 
03/29/21
Hydro
Capital Budget
Application by Newfoundland and Labrador Hydro for an Order approving, pursuant to sections 41 and 78 of the Act: (a) its 2021 capital purchases and construction projects in excess of $50,000; (b) its 2021 Capital Budget; and (c) its average rate base for 2017, 2018, and 2019; and Order No. P.U. 2(2021) in relation to Newfoundland and Labrador Hydro’s 2021 Capital Budget Application; and Newfoundland and Labrador Hydro’s request for approval of proposed expenditures associated with a project to replace personal computers and a project to replace a diesel genset at Nain.
04/07/21
NP
Capital Budget
Application by Newfoundland Power Inc. for an Order pursuant to sections 41 and 78 of the Act: (a) approving a 2021 Capital Budget of $111,298,000; (b) approving certain capital expenditures related to multi-year projects commencing in 2021; and (c) fixing and determining a 2019 rate base of $1,153,556,000; and Order No. P.U. 37(2020) in relation to Newfoundland Power Inc.’s 2021 Capital Budget Application; and Newfoundland Power’s request for approval of proposed capital expenditures, in the amount of approximately $31.6 million, to replace its customer service system.
04/13/21
NP
Deferrals, Accounts and Reserves
Application by Newfoundland Power Inc. for approval of the balance in the Weather Normalization Reserve as of December 31, 2020 pursuant to sections 69(3) and 78 of the Act.
04/13/21
NP
Deferrals, Accounts and Reserves
Application by Newfoundland Power Inc. for approval of the disposition of the 2020 balance in the 2020 Demand Management Incentive Account pursuant to sections 58 and 80 of the Act. 
05/12/21
Hydro
Deferrals, Accounts and Reserves
Application by Newfoundland and Labrador Hydro for recovery of the 2020 balances in (i) the Isolated Systems Supply Cost Variance Deferral Account, (ii) the Revised Energy Supply Cost Variance Deferral Account, and (iii) the Holyrood Conversion Rate Deferral Account, pursuant to sections 70(1) and 80 of the Act.
05/20/21
Hydro
Deferrals, Accounts and Reserves
Application by Newfoundland and Labrador Hydro for approval of two exceptions to financial reporting requirements relating to the Muskrat Falls Power Purchase Agreement and the deferral and recovery of capital-related overhead costs, pursuant to section 58 of the Act.
05/20/21
Hydro
Supplemental Capital Expenditure
Application by Newfoundland and Labrador Hydro for approval of a capital expenditure to supplement the 2021 Allowance for Unforeseen Items for the construction and purchase of certain improvements and additions to its property pursuant to section 41 of the Act.
05/26/21
Hydro
Supplemental Capital Expenditure
Application by Newfoundland and Labrador Hydro for approval of a capital expenditure for the overhaul of Holyrood Thermal Generating Station Unit 1 Boiler Feed Pump East pursuant to section 41 of the Act. 
05/31/21
Hydro
Contribution in Aid of Construction
Application by Newfoundland and Labrador Hydro of a contribution towards the cost of improvements from Iron Ore Company of Canada pursuant to section 41 of the Act.
06/10/21
Hydro
Supplemental Capital Expenditure
Application by Newfoundland and Labrador Hydro for approval of a capital expenditure to purchase Diesel Generator Unit 2102 for Charlottetown, Labrador pursuant to section 41 of the Act. 
06/17/21
Hydro
Award of Costs
Application by Newfoundland and Labrador Hydro in relation to Newfoundland and Labrador Hydro’s 2021 Capital Budget; and an application for costs by the communities of Sheshatshiu, Happy Valley-Goose Bay, Wabush and Labrador City.
06/18/21
Hydro
Rates
Approval of Newfoundland and Labrador Hydro’s for approval, pursuant to sections 70(1) and 71 of the Act, of the Rate Stabilization Plan and Conservation and Demand Management Cost Recovery Rate Adjustments to be charged to Newfoundland Power Inc.
06/29/21
NP
Rates
Application by Newfoundland Power Inc. pursuant to sections 70 and 71 of the Act for approval of: (i) revised rate stabilization and municipal (i) tax adjustments for the period July 1, 2021 to June 30, 2022; (ii) a revised schedule of rates, tolls and charges; and (iii) revisions to the Rate Stabilization Clause.
06/30/21
Hydro
Rates
Application by Newfoundland and Labrador Hydro for approval of a change in rates to be charged to its Island Interconnected, L’Anse au Loup and Isolated Rural customers.
07/13/21
Hydro
Rates
Application by Newfoundland and Labrador Hydro for the approval of a change in the CDM Cost Recovery Adjustment to be charged to Island Industrial customers effective July 1, 2021.
07/19/21
NP
General Rates
A general rate application by Newfoundland Power Inc. to establish customer electricity rates for 2022-2023.
08/18/21
Hydro
Supplemental Capital Expenditure
Application by Newfoundland and Labrador Hydro for approval of a capital expenditure to construct an interconnection between Star Lake Terminal Station and Valentine Terminal Station to provide service to Marathon Gold Corporation pursuant to section 41 of the Act.
08/20/21
Hydro
Supplemental Capital Expenditure
Application by Newfoundland and Labrador Hydro for approval for approval of a capital expenditure to purchase a diesel generating unit for the Ramea Diesel Generating Station pursuant to section 41 of the Act. 
09/13/21
NP
Capital Budget
An application by Newfoundland Power Inc. for an Order pursuant to sections 41 and 78 of the Act: (a) approving a 2021 Capital Budget of $111,298,000; (b) approving certain capital expenditures related to multi-year projects commencing in 2021; and (c) fixing and determining a 2019 rate base of $1,153,556,000; and Order No. P.U. 37(2020) in relation to Newfoundland Power Inc.’s 2021 Capital Budget Application; and Order No. P.U. 12 (2021) issued on April 7, 2021 in relation to Newfoundland Power Inc.’s proposed capital expenditures to replace its customer service system, in the amount of $9,903,000 in 2021, $15,826,000 in 2022, and $5,917,000 in 2023; and an application by the Consumer Advocate, Dennis Browne, Q.C., for an order pursuant to subsections 100(3) and 118(2) of the Act staying Order No. P.U. 12 (2021).
09/29/21
NP and Hydro
Deferrals, Accounts and Reserves
An application filed by Newfoundland Power Inc. on December 16, 2020 for approval of, among other things, supplemental 2021 capital expenditures related to the construction of an electric vehicle charging network associated with the implementation of new electrification programming set out in the joint utility Electrification, Conservation and Demand Management Plan 2021-2025; and an application filed by Newfoundland and Labrador Hydro June 16, 2021 for approval of, among other things, supplemental 2021 capital expenditures related to the construction of an electric vehicle charging network associated with the implementation of new electrification programming set out in the joint utility Electrification, Conservation and Demand Management Plan 2021-2025; and the application by Newfoundland Power Inc. and Newfoundland and Labrador Hydro for approval of 2021 capital expenditures for electric vehicle charging stations pursuant to section 41 of the Act.
10/18/21
NP and Hydro
Deferrals, Accounts and Reserves
An application filed by Newfoundland Power Inc. on December 16, 2020 for approval of, among other things, supplemental 2021 capital expenditures related to the construction of an electric vehicle charging network associated with the implementation of new electrification programming set out in the joint utility Electrification, Conservation and Demand Management Plan 2021-2025; and an application filed by Newfoundland and Labrador Hydro June 16, 2021 for approval of, among other things, supplemental 2021 capital expenditures related to the construction of an electric vehicle charging network associated with the implementation of new electrification programming set out in the joint utility Electrification, Conservation and Demand Management Plan 2021-2025; and the application by Newfoundland Power Inc. and Newfoundland and Labrador Hydro for approval of 2021 capital expenditures for electric vehicle charging stations pursuant to section 41 of the Act.
11/08/21
Hydro
Rules and Regulations (Service Agreements)
Application by Newfoundland and Labrador Hydro for approval of a Second Amended and Restated Pilot Agreement for the Optimization of Hydraulic Resources pursuant to section 3(b)(iii) of the EPCA and sections 70 and 76 of the Act.
11/19/21
Hydro
Rules and Regulations (Service Agreements)
Application by Newfoundland and Labrador Hydro for approval of an interruptible load service agreement with Labrador Lynx Limited.
12/08/21
Hydro
Deferrals, Accounts and Reserves
Application by Newfoundland and Labrador Hydro for of new deferral accounts, changes to existing deferral accounts, and an accounting deviation, associated with the commissioning of the Muskrat Falls Project, pursuant to section 58 of the Act.
12/17/21
Hydro
Supplemental Capital Expenditure
Application by Newfoundland and Labrador Hydro for approval of a capital expenditure to supplement the 2021 Allowance for Unforeseen Items for the construction and purchase of certain improvements and additions to its property pursuant to section 41 of the Act.
12/20/21
NP
Contribution in Aid of Construction
An application by Newfoundland Power Inc. accordance with Order No. P.U. 4(1997-98) to update the cost factors used in its Contribution in Aid of Construction policy.
12/20/21
NP
Capital Budget
An application by Newfoundland Power Inc. for an Order pursuant to sections 41 and 78 of the Act: (a) approving capital expenditures for 2022 projects and multi-year projects commencing in 2022; (b) approving its 2022 Capital Budget; and (c) fixing and determining its average rate base for 2020.
01/31/22
NP
Capital Budget
An application by Newfoundland Power Inc. for an Order pursuant to sections 41 and 78 of the Act: (a) approving capital expenditures for 2022 projects and multi-year projects commencing in 2022; (b) approving its 2022 Capital Budget; and (c) fixing and determining its average rate base for 2020.
12/20/21
Hydro
Capital Budget
Application by Newfoundland and Labrador Hydro for an Order pursuant to sections 41 and 78 of the Act: (a) approving capital expenditures for 2022 projects and multi-year projects commencing in 2022; (b) approving its 2022 Capital Budget; and (c) fixing and determining its average rate base for 2020.
04/20/22
Hydro
Capital Budget
Application by Newfoundland and Labrador Hydro for an Order pursuant to sections 41 and 78 of the Act: (a) approving capital expenditures for 2022 projects and multi-year projects commencing in 2022; (b) approving its 2022 Capital Budget; and (c) fixing and determining its average rate base for 2020.

Order
Date Issued
Name of Applicant
Application Type
Application Description
01/13/20
Hydro
Rules and Regulations (Service Agreements)
Application by Newfoundland and Labrador Hydro for an exemption to Regulation 17 of its rules and regulations.
01/30/20
Hydro
Rates
Application by Newfoundland and Labrador Hydro for approval to continue the current Island Industrial Customer rates pursuant to sections 70(1) and 71 of the Act.
02/10/20
Hydro
Deferrals, Accounts and Reserves
Application by Newfoundland and Labrador Hydro for approval of an account to defer the savings associated with the Firm Energy Power Purchase Agreement with Corner Brook Pulp and Paper Limited. 
02/20/20
NP
Contribution in Aid of Construction
Application by Newfoundland Power Inc. in accordance with Order No. P.U. 4(1997-98) to update the cost factors used in its Contribution in Aid of Construction Policy.
02/21/20
NP
Capital Budget
Application by Newfoundland Power Inc. for an Order, pursuant to sections 41 and 78 of the Act: (a) approving a 2020 Capital Budget of $96,614,000; (b) approving certain capital expenditures related to multi-year projects commencing in 2020; and (c) fixing and determining a 2018 rate base of $1,117,341,000.
02/21/20
Hydro
Capital Budget
Application by Newfoundland and Labrador Hydro for an Order, pursuant to sections 41 and 78 of the Act: (a) approving its 2020 capital purchases and construction projects in excess of $50,000; (b) approving its 2020 Capital Budget of $108,487,300; (c) approving its estimated contributions in aid of construction for 2020; and (d) fixing and determining Hydro’s average rate base for 2015 and 2016 in the amounts of $1,747,308,000 and $1,885,849,000, respectively.
02/21/20
Hydro
Supplemental Capital Expenditure
pplication by Newfoundland and Labrador Hydro for approval of a capital expenditure for the construction and installation of an electric vehicle fast charging network across the island pursuant to section 41 of the Act.
02/26/20
Hydro
Rate Stabilization
Application by Newfoundland and Labrador Hydro for approval of revisions to the Rate Stabilization Plan Rules and Island Industrial customer rates pursuant to sections 70(1) and 71 of the Act.
03/24/20
NP
Security Issues
Application by Newfoundland Power Inc. for an Order, for approval to issue Series AQ First Mortgage Bonds pursuant to section 91 of the Act.
04/06/20
NP
Deferrals, Accounts and Reserves
Application by Newfoundland Power Inc. for approval of the balance in the Weather Normalization Reserve as of December 31, 2019 pursuant to sections 69(3) and 78 of the Act.
04/08/20
NP
Deferrals, Accounts and Reserves
Application by Newfoundland Power Inc. for an Order of the Board for disposition of the 2019 balance in the 2019 Demand Management Incentive Account pursuant to sections 58 and 80 of the Act.
04/29/20
Hydro
Rules and Regulations (Service Agreements)
Application by Newfoundland and Labrador Hydro for an exemption to Regulation 17 of its rules and regulations.
05/01/20
Hydro
Deferrals, Accounts and Reserves
Application by Newfoundland and Labrador Hydro for recovery of the 2019 balances in (i) the Isolated Systems Supply Cost Variance Deferral Account, (ii) the Revised Energy Supply Cost Variance Deferral Account, and (iii) the Holyrood Conversion Rate Deferral Account, pursuant to sections 70(1) and 80 of the Act. 
05/11/20
Hydro
Supplemental Capital Expenditure
Application by Newfoundland and Labrador Hydro for approval of Capital Expenditures necessary for the continued operation of the Holyrood Thermal Generation Station pursuant to section 41 of the Act.
05/27/20
Hydro
General Rate
Application by Newfoundland and Labrador Hydro for approval to delay the filing of its General Rate Application pursuant to sections 70, 71 and 76 of the Act.
06/17/20
Hydro
Rate Stabilization
Application by Newfoundland and Labrador Hydro pursuant to OC2020-081 for the approval of a one-time bill credit to Newfoundland Power Inc. and the continuation of the current Utility RSP Fuel Rider, RSP Current Plan and CDM Cost Recovery Adjustment.
06/17/20
NP
Rate Stabilization
Application by Newfoundland Power Inc. pursuant to OC2020-081 for approval to: (i) suspend the operation of the Rate Stabilization Clause with respect to the Rate Stabilization Adjustment to be charged for the period July 1, 2020 to June 30, 2021; (ii) suspend the operation of the Municipal Tax Clause with respect to the Municipal Tax Adjustment factor for the period July 1, 2020 to June 30, 2021; and (iii) provide a one-time customer bill credit in July 2020
06/30/20
Hydro
Rate Stabilization
Application by Newfoundland and Labrador Hydro pursuant to OC2020-081 for the approval of: (i) a one-time customer bill credit plan for Hydro’s Rural customers who are subject to automatic rate changes based on Newfoundland Power’s customer rates; and (ii) the inclusion of the financial impact of the one-time customer bill credit in the Rate Stabilization Plan Rural Rate Alteration.
06/30/20
Hydro
Rates
Application by Newfoundland and Labrador Hydro for the approval of a change in the CDM Cost Recovery Adjustment to be charged to Island Industrial customers effective July 1, 2020.
08/20/20
Hydro
Award of Costs
Application by Newfoundland and Labrador Hydro for approval of revisions to its Cost of Service Methodology; and an application for costs by Corner Brook Pulp and Paper, NARL Refining Limited Partnership and Vale Newfoundland and Labrador Limited.
08/20/20
Hydro
Award of Costs
Application by Newfoundland and Labrador Hydro for approval of revisions to its Cost of Service Methodology; and an application for costs by the communities of Sheshatshiu, Happy Valley-Goose Bay, Wabush and Labrador City.
08/20/20
Hydro
Award of Costs
Application by Newfoundland and Labrador Hydro Hydro for approval to expand the restriction on load additions in Labrador East; and an application for costs by the communities of Sheshatshiu, Happy Valley-Goose Bay, Wabush and Labrador City.
08/26/20
Hydro
Award of Costs
Application by Newfoundland and Labrador Hydro for approval of an interruptible load service agreement with Labrador Lynx Limited; and an application for costs by the communities of Sheshatshiu, Happy Valley-Goose Bay, Wabush and Labrador City.
08/26/20
NP
Abandonment of Works or Service
Application by Newfoundland Power Inc. for consent to abandon a part of its transmission line infrastructure pursuant to section 38 of the Act.
08/27/20
Hydro
Supplemental Capital Expenditure
Application by Newfoundland and Labrador Hydro for approval of the acquisition and installation of equipment to connect and integrate a photovoltaic and battery operated storage system at Mary’s Harbour, pursuant to section 41 of the Act.
09/03/20
Hydro
Supplemental Capital Expenditure
Application by Newfoundland and Labrador Hydro for approval of replacement of the line protection relays and associated equipment and cabling located in the Wabush Terminal Station for transmission lines L34 and L35 and for approval of a contribution by Tacora of an amount equal to the final capital cost of the project, pursuant to section 41 of the Act. 
09/14/20
Hydro
Supplemental Capital Expenditure
Application by Newfoundland and Labrador Hydro for an Order that the provision of electric vehicle charging services is not subject to the legislative authority of the province and does not require an approved rate, toll, or charge.
10/01/20
NP
Contribution in Aid of Construction
Application by Newfoundland Power Inc. for approval of a Contribution in Aid of Construction for a single-phase extension to the Southern Lake cottage area, pursuant to section 41 of the Act.
10/30/20
Hydro
Deferrals, Accounts and Reserves
Application by Newfoundland and Labrador Hydro for the disposition of the balance in a deferral account approved in Order No. P.U. 3(2020) for savings associated with a firm energy purchases from Corner Brook Pulp and Paper Limited. 
11/16/20
NP
Abandonment of Works or Service
Application by Newfoundland Power Inc. for consent to abandon a part of its transmission line infrastructure pursuant to section 38 of the Act.  
11/16/20
Hydro
Rules and Regulations (Service Agreements)
Application by Newfoundland and Labrador Hydro for approval of an interruptible load service agreement with Labrador Lynx Limited. 
11/16/20
Hydro
Supplemental Capital Expenditure
Application by Newfoundland and Labrador Hydro for approval of a capital expenditure to supplement the 2020 Allowance for Unforeseen Items for the construction and purchase of certain improvements and additions to its property pursuant to section 41 of the Act.
11/17/20
Hydro
Award of Costs
Application for costs by Grand Riverkeeper Labrador, Inc. 
11/27/20
Hydro
Rules and Regulations (Service Agreements)
Application by Newfoundland and Labrador Hydro for an exemption to Regulation 17 of its rules and regulations.
12/11/20
Hydro
Deferrals, Accounts and Reserves
Application by Newfoundland and Labrador Hydro for approval of an account to defer the revenue requirement impact associated with the sale of the frequency converter to Corner Brook Pulp and Paper Limited.
12/14/20
NP
Rate Base
Application by Newfoundland Power Inc. for approval of a 2021 forecast average rate base and a 2021 rate of return on rate base in accordance with Order No. P.U. 2(2019).
12/15/20
NP
Capital Budget
Application by Newfoundland Power Inc. for an Order pursuant to sections 41 and 78 of the Act: (a) approving a 2021 Capital Budget of $111,298,000; (b) approving certain capital expenditures related to multi-year projects commencing in 2021; and (c) fixing and determining a 2019 rate base of $1,153,556,000.
12/17/20
Hydro
Rules and Regulations (Service Agreements)
Application by Newfoundland and Labrador Hydro for approval of an Amended and Restated Pilot Agreement for the Optimization of Hydraulic Resources pursuant to section 3(b)(iii) of the EPCA and sections 70 and 76 of the Act.
12/17/20
NP
Contribution in Aid of Construction
Application by Newfoundland Power Inc. in accordance with Order No. P.U. 4(1997-98) to update the cost factors used in its Contribution in Aid of Construction Policy.
12/18/20
Hydro
Security Issues
Application by Newfoundland and Labrador Hydro for approval to issue debt pursuant to section 91 of the Act.

Order
Date Issued
Name of Applicant
Application Type
Application Description
01/23/19
Hydro
Rules and Regulations (Service Agreements)
Application by Newfoundland and Labrador Hydro pursuant to section 71 of the Act, for an exemption to Regulation 17.
01/24/19
NP
General Rate
A general rate application by Newfoundland Power Inc. for approval of, inter alia, rates to be charged to its customers for 2019 and 2020.
01/30/19
NP
Contribution in Aid of Construction
Application by Newfoundland Power Inc. for approval of a Contribution in Aid of Construction for a line extension to provide three-phase service to the Town of Gander, pursuant to section 41 of the Act.
01/30/19
Hydro
Rate Stabilization
Application by Newfoundland and Labrador Hydro pursuant to section 70 for approval of the Rate Stabilization Plan components of the rates to be charged to Island Industrial Customers effective January 1, 2019.
02/19/19
NP
Supplemental Capital Expenditure
Application by Newfoundland Power Inc. for approval of a capital expenditure for a substation on the Memorial University of Newfoundland St. John’s campus, pursuant to section 41 of the Act.
02/19/19
NP
Supplemental Capital Expenditure
Application by Newfoundland Power Inc. for approval of a capital expenditure for a substation transformer at Newfoundland Power’s Pepperrell Substation and the construction of a three-phase distribution feeder line from Pepperrell Substation, pursuant to section 41 of the Act.
02/21/19
Hydro
Supplemental Capital Expenditure
Application by Newfoundland and Labrador Hydro for approval of a capital expenditure to supplement the 2019 Allowance for Unforeseen Items for the construction and purchase of certain improvements and additions to its property pursuant to section 41 of the Act.
03/04/19
Hydro
Rules and Regulations (Service Agreements)
Application by Newfoundland and Labrador Hydro for approval for an exemption of the temporary restriction on load additions in Labrador East, pursuant to its Rules and Regulations.
03/05/19
Hydro
Capital Budget
Application by Newfoundland and Labrador Hydro approving its 2018 Capital Budget Application; and the proposed Muskrat Falls to Happy Valley-Goose Bay Interconnection project which was deferred pursuant to Order No. P.U. 43(2017) and Order No. P.U. 9(2018). 
P.U. 10(2019)
03/05/19
Hydro
Award of Costs
Application by Newfoundland and Labrador Hydro’s for approval of a regulation to restrict load additions in Labrador East and Order Nos. P.U. 32(2018) and P.U. 36(2018); and an application for costs by the communities of Sheshatshiu, Happy Valley-Goose Bay, Wabush and Labrador City.
03/19/19
NP
Abandonment of Plant or Service
Application by Newfoundland Power Inc. to reduce service from three-phase to single-phase on a section of distribution line on the Avalon Peninsula, pursuant to section 38 of the Act.
03/19/19
NP
Abandonment of Plant or Service
Application by Newfoundland Power Inc. to remove a section of distribution line from service on the Burin Peninsula, pursuant to section 38 of the Act.
04/08/19
NP
Deferrals, Accounts and Reserves
Application by Newfoundland Power Inc. for approval of the balance in the Weather Normalization Reserve as of December 31, 2018 pursuant to sections 69(3) and 78 of the Act.
04/09/19
NP
Contribution in Aid of Construction
Application by Newfoundland Power Inc. for approval of a Contribution in Aid of Construction for a line extension to serve customers in the cottage area known as Island Pond, near the Town of Colinet, pursuant to section 41 of the Act.
05/03/19
Hydro
Rates
Application by Newfoundland and Labrador Hydro for approval of a change in rates to be charged to its Island Interconnected and Isolated Rural customers.
05/07/19
Hydro
General Rate
A general rate application filed by Newfoundland and Labrador Hydro on July 28, 2017.
05/22/19
Hydro
Abandonment of Plant or Service
Application by Newfoundland and Labrador Hydro to remove a section of distribution line from service on the Avalon Peninsula, pursuant to section 38 of the Act.
05/23/19
Hydro
Rules and Regulations (Service Agreements)
Application by Newfoundland and Labrador Hydro for approval of a regulation to restrict load additions in Labrador East and Order No. P.U. 32(2018) and Order No. P.U. 36(2018); and an application for approval to extend the temporary restriction on load additions in Labrador East.
P.U. 19(2019)
05/29/19
Hydro
Award of Costs
Application by Newfoundland and Labrador Hydro approving its 2018 Capital Budget Application; and the proposed Muskrat Falls to Happy Valley-Goose Bay Interconnection project which was deferred pursuant to Order Nos. P.U. 43(2017) and P.U. 9(2018) and approved in Order No. P.U. 9(2019); and an application for costs by the communities of Sheshatshiu, Happy Valley-Goose Bay, Wabush and Labrador City.
P.U. 20(2019)
05/29/19
Timothy W. Buckle 
Request to State a Case
Application Timothy W. Buckle requesting a stated case pursuant to section 101 of the Act.
06/06/19
Hydro
Deferrals, Accounts and Reserves
Application by Newfoundland and Labrador Hydro for recovery of the 2018 balances in (i) the Isolated Systems Supply Cost Variance Deferral Account, (ii) the Energy Supply Cost Variance Deferral Account, and (iii) the Holyrood Conversion Rate Deferral Account, pursuant to sections 70(1) and 80 of the Act. 
06/06/19
Hydro
Supplemental Capital Expenditure
Application by Newfoundland and Labrador Hydro for approval of a capital expenditure to complete a Hinds Lake Unit Overhaul and Level II Condition Assessments at Bay d’Espoir Penstock 4, Granite Canal Penstock and Hinds Lake Penstock pursuant to section 41 of the Act.
06/12/19
Hydro
Deferrals, Accounts and Reserves
A general rate application by Newfoundland and Labrador Hydro to establish customer electricity rates for 2018 and 2019; and the proposed test year costs related to the Business Systems Transformation Program. 
06/17/19
Hydro
Rates
Application by Newfoundland and Labrador Hydro for the approval of a change in the CDM Cost Recovery Adjustment to be charged to Island Industrial customers effective July 1, 2019. 
06/25/19
Hydro
Rate Stabilization
Application by Newfoundland and Labrador to delay implementation of its July 1, 2019 Utility Rate Stabilization Plan and Conservation and Demand Management rate changes.
07/02/19
NP
Contribution in Aid of Construction
Application by Newfoundland Power Inc. for approval of a Contribution in Aid of Construction for a single-phase extension to Skibbereen Road, pursuant to section 41 of the Act.
07/26/19
Hydro
Rules and Regulations (Service Agreements)
Application by Newfoundland and Labrador Hydro for an exemption to Regulation 17 of its rules and regulations.
08/26/19
Hydro
Supplemental Capital Expenditure
Application by Newfoundland and Labrador Hydro for approval of a capital expenditure for refurbishment of the Hardwoods gas turbine alternator exciter end bearing and the purchase of an exciter bearing liner and thrust pads pursuant to section 41 of the Act.
09/06/19
Hydro
Deferrals, Accounts and Reserves
Application by Newfoundland and Labrador Hydro for approval to defer certain costs related to the Reliability and Resource Adequacy Study pursuant to sections 58 and 80 of the Act.
09/11/19
Hydro
General Rate
A general rate application filed by Newfoundland and Labrador Hydro on July 28, 2017 to establish customer electricity rates for 2018 and 2019; and Order No. P.U. 16(2019) relating to the 2017 general rate application; and an application filed by Newfoundland and Labrador Hydro on July 11, 2019 to reflect the findings of the Board in Order No. P.U. 16(2019) and requesting approval of, among other things, changes to its rates, rules and regulations for the supply of power and energy to its customers to be effective October 1, 2019.
09/25/19
NP
Rate Stabilization
Application by Newfoundland Power Inc. pursuant to sections 70, 71 and 80 of the Act and Order Nos. P.U. 16(2019), P.U. 25(2019) and P.U. 30(2019) for approval of: (i) revisions to the rates, rules and regulations to permit recovery of additional costs payable to Newfoundland and Labrador Hydro for the supply of power as a result of a revised Utility rate effective October 1, 2019; (ii) revised rate stabilization and municipal tax adjustments for the period October 1, 2019 to June 30, 2020; and (iii) revisions to Newfoundland Power’s Rate Stabilization Clause. 
09/25/19
Hydro
Rates
Application by Newfoundland and Labrador Hydro for approval of a change in rates for the supply of power and energy to Hydro Rural customers who are subject to automatic rate changes based on the rates approved for customers of Newfoundland Power Inc.
10/15/19
Hydro
Supplemental Capital Expenditure
Application by Newfoundland and Labrador Hydro for of a capital expenditure for refurbishment and upgrade of a gas generator to be used as a spare for the Hardwoods and Stephenville Gas Turbine facilities pursuant to section 41 of the Act.
10/29/19
Hydro
Rules and Regulations (Service Agreements)
Application by Newfoundland and Labrador Hydro Hydro for approval to expand the restriction on load additions in Labrador East approved in Order Nos. P.U. 32(2018), P.U. 36(2018) and P.U. 18(2019).
11/01/19
Hydro
Rules and Regulations (Service Agreements)
Application by Newfoundland and Labrador Hydro for approval of a Firm Energy Power Purchase Agreement with Corner Brook Pulp and Paper Limited pursuant to sections 70(1), 71 and 80 of the Act.
11/07/19
NP
Supplemental Capital Expenditure
Application by Newfoundland Power Inc. for approval of a capital expenditure for the relocation of a portion of a transmission line for Cottle’s Island Lumber Company Limited pursuant to section 41 of the Act.
11/20/19
Hydro
Deferrals, Accounts and Reserves
Application by Newfoundland and Labrador Hydro for approval of revisions to its Cost of Service Methodology for use in the determination of test year class revenue requirements reflecting the inclusion of the Muskrat Falls Project costs upon full commissioning, pursuant to section 3 of the EPCA.
12/09/19
Hydro
Rules and Regulations (Service Agreements)
Application by Newfoundland and Labrador Hydro approved in Order No. P.U. 26(2018) relating to the sale of the Corner Brook frequency converter by Newfoundland and Labrador Hydro to Corner Brook Pulp and Paper Limited; and the recovery of retirement costs associated with the sale of the frequency converter to Corner Brook Pulp and Paper Limited, in the amount of approximately $4.25 million. 
12/17/19
Hydro
Supplemental Capital Expenditure
Application by Newfoundland and Labrador Hydro for approval of a capital expenditure for the construction of a line extension and the installation of power usage monitoring and control equipment at the BlockLab site pursuant to section 41 of the Act
12/19/19
Hydro
Award of Costs
Application by Newfoundland and Labrador Hydro for approval of its 2017 General Rate Application; and Order Nos. P.U. 16(2019) and P.U. 30(2019) related to Newfoundland and Labrador Hydro’s 2017 General Rate Application; and an application for costs by Corner Brook Pulp and Paper, NARL Refining Limited Partnership and Vale Newfoundland and Labrador Limited.
12/19/19
Hydro
Award of Costs
Application by Newfoundland and Labrador Hydro for approval of its 2017 General Rate Application; and Order Nos. P.U. 16(2019) and P.U. 30(2019) related to Newfoundland and Labrador Hydro’s 2017 General Rate Application; and an application for costs by the communities of Sheshatshui, Happy Valley-Goose Bay, Wabush and Labrador City.
12/20/19
Hydro
Rules and Regulations (Service Agreements)
Application by Newfoundland and Labrador Hydro for approval of an interruptible load service agreement with Labrador Lynx Limited.

Order
Date Issued
Name of Applicant
Application Type
Application Description
01/23/18
Hydro
Contribution in Aid of Construction
Application by Newfoundland and Labrador Hydro for approval of a Contribution in Aid of Construction to provide service to the Western Regional Service Board’s waste transfer facility located on Route 420 near Hampden Junction, pursuant to section 41 of the Act.
01/26/18
Hydro
Rates
Application by Newfoundland and Labrador Hydro to establish customer electricity rates for 2018 and 2019; and an application from the Consumer Advocate to delay the schedule for Newfoundland and Labrador Hydro’s general rate application until additional information is filed.
02/09/18
Hydro
Rules and Regulations (Service Agreements)
Application by Newfoundland and Labrador Hydro, acting in its capacity as the Newfoundland and Labrador System Operator, for approval of pro-forma Transmission Service Agreements and interim transmission rates and rate methodology, and Transmission Policies and Procedures and Code of Conduct for transmission system operations, pursuant to sections 71 and 75 of the Act.
02/14/18
Hydro
Award of Costs
Application by Newfoundland and Labrador Hydro for an Order approving, pursuant to Section 41 of the Act: (a) its 2018 capital purchases and construction projects in excess of $50,000; (b) its 2018 Capital Budget; and (c) its estimated contributions in aid of construction for 2018; and an application for approval of costs by Industrial Customer Group pursuant to Order No. P.U. 43(2017).
02/23/18
Hydro
Captial Budget
Application by Newfoundland and Labrador Hydro for an Order approving, pursuant to section 41 of the Act: (a) its 2018 capital purchases and construction projects in excess of $50,000; (b) its 2018 Capital Budget; and (c) its estimated contributions in aid of construction for 2018; and Order No. P.U. 43(2017) in relation to Hydro’s 2018 Capital Budget application; and additional information filed by Newfoundland and Labrador Hydro pursuant to Order No. P.U. 43(2017). 
03/01/18
Hydro
Contribution in Aid of Construction
Application by Newfoundland and Labrador Hydro for an Order approving a capital expenditure to perform a voltage conversion of the Labrador City Feeder VA26 pursuant to section 41 of the Act; and a Contribution in Aid of Construction for a line extension to serve the Smoky Mountain Ski Club near Labrador City, pursuant to section 41 of the Act.
03/14/18
Hydro
General Rate
A general rate Application by Newfoundland and Labrador Hydro to establish customer electricity rates for 2018 and 2019; and an application by Newfoundland and Labrador Hydro for approval, on an interim basis, of Island Industrial customer rates and Labrador Industrial Transmission rates, effective April 1, 2018.
03/23/18
NP
Contribution in Aid of Construction
Application by Newfoundland Power Inc. for approval of a Contribution in Aid of Construction for a single-phase extension to the Riverbank Road Phase 2 Cottage Area, pursuant to section 41 of the Act.
03/23/18
Hydro
Captial Budget
Application by Newfoundland and Labrador Hydro for an Order approving, pursuant to section 41 of the Act: (a) its 2018 capital purchases and construction projects in excess of $50,000; (b) its 2018 Capital Budget; and (c) its estimated contributions in aid of construction for 2018; and Order No. P.U. 43(2017) in relation to Hydro’s 2018 Capital Budget application; and additional information filed by Newfoundland and Labrador Hydro pursuant to Order No. P.U. 43(2017); and the proposed Muskrat Falls to Happy Valley-Goose Bay Interconnection project which was deferred pursuant to Order No. P.U. 43(2017). 
04/03/18
NP
Deferrals, Accounts and Reserves
Application by Newfoundland Power Inc. for an Order of the Board providing for disposition of the 2017 balance in the 2017 Demand Management Incentive Account pursuant to sections 58 and 80 of the Act.
04/03/18
NP
Deferrals, Accounts and Reserves
Application by Newfoundland Power Inc. for approval of the balance in the Weather Normalization Reserve as of December 31, 2017 pursuant to sections 69(3) and 78 of the Act.
05/02/18
NP
Contribution in Aid of Construction
Application by Newfoundland Power Inc. for approval of a Contribution in Aid of Construction for a single-phase extension to Harmon Seaside Park Developments Limited, pursuant to section 41 of the Act.
05/10/18
Hydro
General Rate - RFI Confidentiality
A general rate application by Newfoundland and Labrador Hydro to establish customer electricity rates for 2018 and 2019; and an application by Newfoundland and Labrador Hydro for an order that its responses to two information requests be considered confidential.
05/22/18
Hydro
General Rate - Defferal of Cost of Service Methodolgy Issues
A general rate application by Newfoundland and Labrador Hydro to establish customer electricity rates for 2018 and 2019; and an application by Newfoundland and Labrador Hydro requesting deferral of certain cost of service methodology issues raised in the 2017 general rate application
05/28/18
Hydro
General Rate - Revised Interim Rates to be Charged to Newfoundland Power
A general rate application by Newfoundland and Labrador Hydro to establish customer electricity rates for 2018 and 2019; and an application by Newfoundland and Labrador Hydro for approval of revised rates to be charged to Newfoundland Power on an interim basis, effective July 1, 2018. 
06/11/18
NP
Contribution in Aid of Construction
Application by Newfoundland Power Inc. for approval of a Contribution in Aid of Construction for a single-phase extension to the Indian Cove Cottage Area, pursuant to section 41 of the Act.
06/14/18
Hydro
General Rate - Consumer Advocate Motion for an Order declaring Order in Council Jurisdicition
A general rate application by Newfoundland and Labrador Hydro to establish customer electricity rates for 2018 and 2019; and a motion by the Consumer Advocate for an order declaring whether two Orders-in-Council restrict the Board’s jurisdiction to allow Newfoundland and Labrador Hydro’s application to recover any costs relating to components of the Muskrat Falls Project.
06/14/18
Hydro
Rates - Confidential RFIs
A general rate application by Newfoundland and Labrador Hydro to establish customer electricity rates for 2018 and 2019; an application by Newfoundland and Labrador Hydro for an order that its responses to two information requests be considered confidential; and an application by Newfoundland and Labrador Hydro requesting that the information contained in Table 2 of Hydro’s response to PUB-NLH-149 be considered confidential
06/20/18
Hydro
Supplemental Capital Expenditure
Application by Newfoundland and Labrador Hydro for approval of a capital expenditure to supplement the 2018 Allowance for Unforeseen Items for the construction and purchase of certain improvements and additions to its property pursuant to section 41 of the Act.
06/22/18
NP
Rate Stabilization
Application by Newfoundland Power Inc. pursuant to Sections 70 and 75 of the Act for approval of: (i) revised rate stabilization and municipal tax adjustments for the period July 1, 2018 to June 30, 2019; and (ii) a revised schedule of rates, tolls and charges; and (iii) amended rules and regulations.
06/22/18
Hydro
Rules and Regulations (Service Agreements)
Application by Newfoundland and Labrador Hydro, pursuant to section 70 of the Act and Order Nos. P.U. 49(2016) and P.U. 22(2017), for the approval of a change in the CDM Cost Recovery Adjustment to be charged to Island Industrial Customers effective July 1, 2018. 
06/29/18
Hydro
Rates
Application by Newfoundland and Labrador Hydro for approval of a change in rates to be charged to its Island Interconnected, L’Anse au Loup and Isolated Rural customers.
07/04/18
Hydro
Supplemental Capital Expenditure
Application by Newfoundland and Labrador Hydro for approval of a capital expenditure to complete Level 2 condition assessments on penstocks at the Bay d’Espoir Hydroelectric Generating Station pursuant to section 41 of the Act.
07/04/18
NP
General Rate
Application by Newfoundland Power Inc. a general rate application by Newfoundland Power Inc. to establish customer electricity rates for 2019 and 2020.
07/11/18
Hydro
Supplemental Capital Expenditure
Application by Newfoundland and Labrador Hydro for approval of a capital expenditure to restore the design performance of the air heaters to increase the generating capacity of Units 1, 2, and 3 at the Holyrood Thermal Generating Station pursuant to section 41 of the Act.
08/09/18
Hydro
Rules and Regulations (Service Agreements)
Application by Newfoundland and Labrador Hydro for approval of the sale of the Corner Brook Frequency Converter to Corner Brook Pulp and Paper Limited and of amendments to its Service Agreement, pursuant to sections 38, 48, and 71 of the Act. 
08/10/18
Hydro
Rules and Regulations (Service Agreements)
Application by Newfoundland and Labrador Hydro to enter into a Temporary Service Agreement with a new customer in Labrador West.
08/10/18
NP
Supplemental Capital Expenditure
Application by Newfoundland Power Inc. for approval of a capital expenditure to replace the roof at its Duffy Place facility, pursuant to section 41 of the Act.
08/21/18
Hydro
Rate Base
Application by Newfoundland and Labrador Hydro for approval to include in its 2016 and 2017 rate base certain expenses in excess of the approved 2016 and 2017 Allowance for Unforeseen Items, pursuant section 78 of the Act.
08/24/18
The Board’s Investigation and Hearing into Supply Issues and Power Outages on the Island Interconnected System  
Confidential RFIs
Application by Newfoundland and Labrador Hydro requesting that its responses to three requests for information relating to the Near-Term Generation Adequacy Report be considered confidential.
09/07/18
NP
Contribution in Aid of Construction
Application by Newfoundland Power Inc. for approval of a Contribution in Aid of Construction for a line extension to provide three-phase service to Newco Metal and Auto Recycling Limited, pursuant to section 41 of the Act.
09/11/18
Hydro
Rules and Regulations (Service Agreements)
Application by Newfoundland and Labrador Hydro for approval of a regulation to restrict load additions in Labrador East.
09/12/18
Hydro
Supplemental Capital Expenditure
Application by Newfoundland and Labrador Hydro for approval of a capital expenditure for a Control System between Mary’s Harbour Diesel Plant and St. Mary’s River Hydro Plant pursuant to section 41 of the Act.
09/24/18
Hydro
Supplemental Capital Expenditure
Application by Newfoundland and Labrador Hydro for approval of a capital expenditure to upgrade the Happy Valley-Goose Bay distribution system pursuant to section 41 of the Act. 
10/02/18
NP
Capital Budget
Application by Newfoundland Power Inc. for an Order pursuant to sections 41 and 78 of the Act: (a) approving a 2019 Capital Budget of $93,304,000; (b) approving certain capital expenditures related to multi-year projects commencing in 2019; and  (c) fixing and determining a 2017 rate base of $1,092,254,000.
10/05/18
Hydro
Rules and Regulations (Service Agreements)
Application by Newfoundland and Labrador Hydro for approval of a regulation to restrict load additions in Labrador East and Order No. P.U. 32(2018); and an application for approval of a revised regulation to restrict load additions in Labrador East.
10/11/18
Hydro
Rules and Regulations (Service Agreements)
Application by Newfoundland and Labrador Hydro for approval of an interruptible load service agreement with Labrador Lynx Limited.
10/26/18
Hydro
Supplemental Capital Expenditure
Application by Newfoundland and Labrador Hydro for approval to reroute transmission lines TL 239 and TL 226 pursuant to section 41 of the Act. 
11/07/18
Hydro
Rules and Regulations (Service Agreements)
Application by Newfoundland and Labrador Hydro for approval of a revision to its Schedule of Rates, Tolls and Charges to modify the specifically assigned charge to an island industrial customer pursuant to section 70 of the Act. 
11/22/18
Hydro
Rules and Regulations (Service Agreements)
Application by Newfoundland and Labrador Hydro for approval of an Amended and Restated Capacity Assistance Agreement with Corner Brook Pulp and Paper Limited pursuant to section 70(1), 71 and 80 of the Act.
11/29/18
Hydro
Deferrals, Accounts and Reserves
Application by Newfoundland and Labrador Hydro for approval an application from Newfoundland and Labrador Hydro for approval of a Pilot Agreement for the Optimization of Hydraulic Resources, a Hydraulic Resources Optimization Deferral Account, and revised Rate Stabilization Plan rules; and an application from Newfoundland and Labrador Hydro requesting that a portion of the response to a request for information relating to the above application be considered confidential.
11/29/18
The Board’s Investigation and Hearing into Supply Issues and Power Outages on the Island Interconnected System  
Confidential RFIs
Application by Newfoundland and Labrador Hydro requesting that portions of responses to two requests for information relating to the Near-Term Generation Adequacy Report be considered confidential.
11/30/18
NP
Contribution in Aid of Construction
Application by Newfoundland Power Inc. for approval of a Contribution in Aid of Construction for a line extension to provide single-phase service to Destination RV Resort Inc., pursuant to section 41 of the Act.
11/30/18
Hydro
Rules and Regulations (Service Agreements)
Application by Newfoundland and Labrador Hydro for approval of a Load Curtailable Agreement with Vale Newfoundland and Labrador Limited pursuant to sections 70, 71 and 80 of the Act.
11/30/18
Hydro
Rules and Regulations (Service Agreements)
Application by Newfoundland and Labrador Hydro to enter into a Temporary Service Agreement with a new customer in Labrador West and Order No. P.U. 27(2018); and an application for costs by the Labrador Interconnected Group.
12/10/18
Hydro
Capital Budget
Application by Newfoundland and Labrador Hydro for an Order approving, pursuant to section 41 of the Act: (a) its 2019 capital purchases and construction projects in excess of $50,000; (b) its 2019 Capital Budget; (c) its estimated contributions in aid of construction for 2019; and (d) fixing and determining Hydro’s average rate base for 2013 and 2014 in the amounts of $1,546,930,000 and $1,620,982,000, respectively.
12/12/18
rHydro
Deferrals, Accounts and Reserves
A general rate application by Newfoundland and Labrador Hydro to establish customer electricity rates for 2018 and 2019; and an application by Newfoundland and Labrador Hydro for approval to defer costs incurred for the use of the Labrador-Island Link and Labrador Transmission Assets as directed in Order in Council OC2018-213.
12/13/18
Hydro
General Rate - Interim Rates - Deferral Account
A general rate application by Newfoundland and Labrador Hydro to establish customer electricity rates for 2018 and 2019; and an application by Newfoundland and Labrador Hydro for approval, on an interim basis, of changes to Island Industrial customer rates, and to establish a cost deferral account for 2018 in relation to a proposed change in depreciation methodology.
12/18/18
Hydro
Deferrals, Accounts and Reserves - Rate Stabilization
Application by Newfoundland and Labrador Hydro for approval of a Pilot Agreement for the Optimization of Hydraulic Resources, a Hydraulic Resources Optimization Deferral Account, and revised Rate Stabilization Plan rules pursuant to sections 69(3), 70, 71 and 76 of the Act. 
12/21/18
NP
Contribution in Aid of Construction
A filing by Newfoundland Power Inc. in accordance with Order No. P.U. 4(1997-98) to update the cost factors used in its Contribution in Aid of Construction Policy.

Newfoundland and Labrador Hydro
  Application:  
  Application by Newfoundland and Labrador Hydro for approval of two exceptions to financial reporting requirements relating to contributions in aid of construction and the provision of betterment to non-customers, pursuant to Section 58 of the Act.
  Decision:  
 
  1. Hydro’s proposal to continue its historic treatment of recording all contributions to assets, both from customers and entities that are not customers, as CIACs for financial statement purposes and to offset the CIAC against the cost of the asset for computation of average rate base, is approved.
  2. Hydro’s proposal that betterment not be provided to non-customers is not approved.
  3. Hydro shall pay all the expenses of the Board arising from this Application.
  Date Issued:  
  January 16, 2017  
     
     
The Board’s Investigation and Hearing into Supply Issues and Power Outages on the Island Interconnected System Matter
  Application:  
  Motion by Newfoundland and Labrador Hydro to strike out three reports filed by Grand Riverkeeper Labrador, Inc.
  Decision:  
 
  1. Hydro’s motion to strike the two Bernander reports dated November 26, 2015 and October 13, 2016, and the Raphals report dated October 17, 2016, is granted.
  2. Hydro shall pay the expenses of the Board associated with the matter.
  Date Issued:  
  January 20, 2017  
     
     
Newfoundland and Labrador Hydro
  Application:  
  Application by Newfoundland and Labrador Hydro for approval of a Load Curtailable Agreement with Vale Newfoundland and Labrador Limited pursuant to sections 70, 71 and 80 of the Act.
  Decision:  
 
  1. The proposed Load Curtailable Agreement with Vale Newfoundland and Labrador Limited is approved.
  2. Hydro shall file with the Board, no later than April 15 of the year following each winter period December 1 - March 31 while the agreement is in place, a report setting out the dates, times, duration and system conditions, including generation available and calculation of system reserve, under which capacity assistance was requested, the capacity assistance requested and provided, and the capacity and variable payments made.
  3. Hydro shall pay all expenses of the Board arising from this Application.
  Date Issued:  
  January 25, 2017  
     
     
Newfoundland Power Inc.
  Application:  
  Application by Newfoundland Power Inc. for approval to issue Series AP First Mortgage Bonds pursuant to section 91 of the Act.
  Decision:  
 
  1. Newfoundland Power’s proposal to issue Series AP First Mortgage Bonds in an amount of up to $100,000,000 to repay short term indebtedness is approved subject to the following conditions:
    1. The Series AP First Mortgage Bonds shall be issued on or before December 31, 2017.
    2. Newfoundland Power shall file with the Board a report specifying the terms and conditions of the bond issue within five (5) days after closing, setting out the following:
      1. date of issue;
      2. term;
      3. maturity date;
      4. principal amount;
      5. coupon rate;
      6. particulars of sinking fund, if any;
      7. price to public and to the underwriters;
      8. yield to the public;
      9. underwriting fee;
      10. actual cost (i.e. yield) to Newfoundland Power; and
      11. any other material terms or conditions.
    3. Newfoundland Power shall file with the Board a copy of the Underwriting Agreement relating to the bonds within five (5) days after closing.
    4. Newfoundland Power shall file with the Board a report on the disposition of the proceeds no later than six months from the date of the closing.
  2. Newfoundland Power shall pay all expenses of the Board arising from this Application.
  Date Issued:  
  February 2, 2017  
     
     
Newfoundland and Labrador Hydro
  Application:  
  Application by Newfoundland and Labrador Hydro for approval to construct a distribution feeder at the Bottom Waters Terminal Station pursuant to section 41 of the Act.
  Decision:  
 
  1. The proposed capital expenditure in the amount of $3,045,000 to construct a distribution feeder at the Bottom Waters Terminal Station is approved.
  2. Hydro shall pay all expenses of the Board arising from this Application.
  Date Issued:  
  February 24, 2017  
     
     
Newfoundland Power Inc.
  Application:  
  Application by Newfoundland Power Inc. for approval of a capital expenditure to replace the substation transformer at Riverhead Substation pursuant to section 41 of the Act; and an application for approval of a Contribution in Aid of Construction for a distribution line for the St. Lawrence Fluorspar Mine pursuant to section 41 of the Act.
  Decision:  
 
  1. The proposed capital expenditures in the amount of:
    1. $1,475,000 to replace the substation transformer at the Riverhead Substation; and
    2. $1,354,000 to provide substation equipment and construct a distribution feeder to serve the St. Lawrence Fluorspar Mine are approved.
  2. The Contribution in Aid of Construction of eight hundred and eighty six thousand and fifty six dollars ($886,056), excluding HST, to extend 3-phase power to the fluorspar mining facility near the Town of St. Lawrence is approved.
  3. Newfoundland Power shall pay all expenses of the Board arising from this Application.
  Date Issued:  
  February 24, 2017  
     
     
Newfoundland and Labrador Hydro
  Application:  
  Application by Newfoundland and Labrador Hydro to acquire two 230 kV transmission lines serving Labrador West pursuant to section 41 of the Act.
  Decision:  
 
  1. The proposed capital expenditure in the amount of $3,168,944 for:
    1. the sublease of two 230 kV transmission lines that run from Churchill Falls to the Twin Falls generating plant site;
    2. the sublease of two 230 kV transmission lines that run from the Twin Falls generating plant site to the Wabush Terminal Station;
    3. the lease of electrical equipment situated in the Churchill Falls Switchyard; and
    4. the purchase of spare parts and inventory associated with the Wabush Terminal Station, the Churchill Falls Switchyard and the transmission lines is approved.
  2. Hydro shall pay all expenses of the Board arising from this Application.
  Date Issued:  
  February 24, 2017  
     
     
Newfoundland and Labrador Hydro
  Application:  
  Application by Newfoundland and Labrador Hydro for approval to delay the filing of its General Rate Application pursuant to sections 70, 71 and 76 of the Act.
  Decision:  
 
  1. Hydro shall file its next general rate application no later than July 31, 2017.
  2. Hydro shall pay all expenses of the Board arising from this Application.
  Date Issued:  
  March 16, 2017  
     
     
The Board’s Investigation and Hearing into Supply Issues and Power Outages on the Island Interconnected System
  Matter:  
  Request by Grand Riverkeeper Labrador, Inc. that the Board rescind or amend Order No. P.U. 2(2017).
  Decision:  
 
  1. The GRK application to rescind or amend Order No. P.U. 2(2017) is denied.
  Date Issued:  
  March 29, 2017  
     
     
Newfoundland and Labrador Hydro
  Application:  
  Application by Newfoundland and Labrador Hydro to replace the exciter controls for Units 1 and 2 at the Holyrood Thermal Generating Station pursuant to section 41 of the Act.
  Decision:  
 
  1. The proposed capital expenditure in the amount of $1,349,200 to replace the exciter control modules for Units 1 and 2 at the Holyrood Thermal Generating Station is approved.
  2. Hydro shall pay all expenses of the Board arising from this Application.
  Date Issued:  
  April 3, 2017  
     
     
Newfoundland and Labrador Hydro
  Application:  
  Application by Newfoundland and Labrador Hydro for approval to replace equipment at the Wabush Terminal Station pursuant to section 41 of the Act.
  Decision:  
 
  1. The proposed project to: 
    1. replace one 46 kV circuit breaker, 46-33, and complete breaker and feeder protection upgrades for this circuit breaker;
    2. replace thirty-six 46 kV post insulators, twenty-four 46 kV suspension insulators, and twenty-four 230 kV suspension insulators;
    3. purchase and replace shaft seals and resistance rings for synchronous condenser 1 and 2; and
    4. complete Level 2 condition assessments of synchronous condenser 1 and 2 is approved, with estimated capital expenditures in the amounts of $2,585,200 in 2017 and $327,300 in 2018.
  2. Hydro shall pay all expenses of the Board arising from this Application.
  Date Issued:  
  April 10, 2017  
     
     
Newfoundland Power Inc.
  Application:  
  Application by Newfoundland Power Inc. for approval of the balance in the Weather Normalization Reserve as of December 31, 2016 pursuant to sections 69(3) and 78 of the Act.
  Decision:  
 
  1. Newfoundland Power’s Weather Normalization Reserve of a negative balance of $1,720,704.94 as of December 31, 2016 is approved.
  2. Newfoundland Power shall pay all costs and expenses of the Board in connection with this Application.
  Date Issued:  
  April 20, 2017  
     
     
Newfoundland and Labrador Hydro
  Application:  
  Application by Newfoundland and Labrador Hydro to inspect and refurbish Bay d’Espoir Penstock 2 and to complete a major overhaul on Bay d’Espoir Unit 3 Turbine pursuant to section 41 of the Act.
  Decision:  
 
  1. The proposed capital expenditure in the amount of $9,063,700 to inspect and refurbish Bay d’Espoir Penstock 2 is approved subject to the following conditions:
    1. Hydro shall file, on the day following the third day of inspection, an analysis by a qualified engineer or other appropriate expert, containing field findings on the weld condition and indicating whether or not the work must proceed, to support the refurbishment of the penstock; and
    2. Hydro shall file copies of any subsequent inspection and assessment reports in connection with the refurbishment of the penstock.
  2. The proposed capital expenditure in the amount $2,361,500 to complete a major overhaul on Bay d’Espoir Unit 3 Turbine is approved.
  3. Hydro shall pay all expenses of the Board arising from this Application.
  Date Issued:  
  April 21, 2017  
     
     
Newfoundland and Labrador Hydro
  Application:  
  Application for a general rate application filed by Newfoundland and Labrador Hydro on July 30, 2013; and an amended general rate application filed by Newfoundland and Labrador Hydro on November 10, 2014; and Order No. P.U. 49(2016); and an application filed by Newfoundland and Labrador Hydro on January 27, 2017 with revised proposals related to the general rate application to reflect Order No. P.U. 49(2016).
  Decision:  
 
  1. Hydro shall file a revised Compliance Application arising from Order No. P.U. 49(2016), incorporating the findings of the Board in this Decision and Order.
  2. Hydro shall pay all costs and expenses of the Board arising from this Application.
  Date Issued:  
  May 1, 2017  
     
     
Newfoundland and Labrador Hydro
  Application:  
  Application for a general rate application filed by Newfoundland and Labrador Hydro for approval of a capital expenditure to supplement the 2017 Allowance for Unforeseen Items for the construction and purchase of certain improvements and additions to its property pursuant to section 41 of the Act.
  Decision:  
 
  1. The addition of a supplementary amount of $500,000 to the 2017 Allowance for Unforeseen Items is approved.
  2. Hydro shall pay all expenses of the Board arising from this Application.
  Date Issued:  
  May 2, 2017  
     
     
Newfoundland and Labrador Hydro
  Application:  
  Application for a general rate application filed by Newfoundland and Labrador Hydro on July 30, 2013; and an amended general rate application filed by Newfoundland and Labrador Hydro on November 10, 2014; and Order No. P.U. 49(2016); and an application filed by Newfoundland and Labrador Hydro on January 27, 2017 with revised proposals related to the general rate application to reflect Order No. P.U. 49(2016); and Order No. P.U. 14(2017).
  Decision:  
 
  1. Hydro shall transfer the Newfoundland Power RSP Load Variation balance to the Newfoundland Power RSP Current Plan to mitigate the proposed July 1, 2017 RSP Adjustment rate increase.
  2. Hydro shall provide with its revised compliance application detailed calculations in relation to the transfer from the Newfoundland Power RSP Load Variation balance and the resulting impacts on rates.
  3. Hydro shall set out the proposed RSP Current Plan rate on the Utility Rate sheet showing i) the RSP Current Plan rate, calculated in the ordinary course, and ii) the RSP Current Plan mitigation rate.
  4. Hydro shall pay all costs and expenses of the Board arising from this Application.
  Date Issued:  
  May 12, 2017  
     
     
Newfoundland and Labrador Hydro & Newfoundland Power Inc.
  Application:  
  Application by Newfoundland and Labrador Hydro for approval of rules and rates for a Net Metering Program; and an application by Newfoundland Power Inc. for approval of rules and rates for a Net Metering Service Option.
  Decision:  
 
  1. Hydro’s proposal to revise its Schedule of Rates, Rules and Regulations to permit the implementation of the net metering program is approved, to be effective as of July 1, 2017.
  2. Hydro shall file a revised Schedule of Rates, Rules and Regulations for the approval of the Board.
  3. Newfoundland Power’s proposal to revise its i) rates, tolls and charges and ii) rules and regulations to permit the implementation of the net metering program is approved, to be effective as of July 1, 2017.
  4. Newfoundland Power shall file revised i) rates, tolls and charges and ii) rules and regulations for the approval of the Board.
  5. Hydro and Newfoundland Power shall provide an annual report, beginning on April 1, 2018, on their respective net metering programs.
  6. Hydro and Newfoundland Power shall pay the costs and expenses of the Board associated with these applications, to be shared equally.
  Date Issued:  
  May 18, 2017  
     
     
Newfoundland Power Inc.
  Application:  
  Application by Newfoundland Power Inc. for approval of a Contribution in Aid of Construction for three-phase service to the Town of Conception Bay South, pursuant to section 41 of the Act.
  Decision:  
 
  1. The Contribution in Aid of Construction of two hundred and thirteen thousand seven hundred dollars and forty six cents ($213,700.46), excluding HST, to provide three-phase service to a waste management station in the Town of Conception Bay South is approved.
  2. Newfoundland Power shall pay all expenses of the Board arising from this Application.
  Date Issued:  
  May 19, 2017  
     
     
Newfoundland Power Inc.
  Application:  
  Application by Newfoundland Power Inc. for approval of capital expenditures to refurbish Turbine No. 1 and perform rockfall remediation at the Rose Blanche hydro plant pursuant to section 41 of the Act.
  Decision:  
 
  1. The proposed capital expenditure in the amount of $1,787,000 to refurbish Turbine No. 1 at the Rose Blanche hydro plant is approved.
  2. The proposed capital expenditure in the amount of $1,494,000 to perform rockfall remediation at the Rose Blanche hydro plant is approved.
  3. Newfoundland Power shall pay all expenses of the Board arising from this Application.
  Date Issued:  
  May 23, 2017  
     
     
Newfoundland and Labrador Hydro
  Application:  
  Application by Newfoundland and Labrador Hydro for approval of a capital expenditure to refurbish and replace critical systems and equipment at the Holyrood Thermal Generating Station pursuant to section 41 of the Act.
  Decision:  
 
  1. The proposed capital expenditure in the amount of $2,610,000 to refurbish and replace critical systems and equipment at the Holyrood Thermal Generating Station including:
    1. boiler air flow and heat transfer equipment refurbishments and replacements including boiler air heaters and expansion joints;
    2. piping, valves, and heat tracing replacements related to boiler feed water, steam, and cooling water systems; and
    3. turbine and generator lubrication and control system replacements including DC tube oil, pump motor starters, and speed probes and cables is approved.
  2. Hydro shall pay all expenses of the Board arising from this Application.
  Date Issued:  
  May 30, 2017  
     
     
Newfoundland and Labrador Hydro
  Application:  
  Application by Newfoundland and Labrador Hydro for approval of a capital expenditure to repair and advance the overhaul of the Happy Valley gas turbine pursuant to section 41 of the Act.
  Decision:  
 
  1. The proposed capital expenditure in the amount of $3,714,800 for the repair and advanced overhaul of the Happy Valley gas turbine is approved.
  2. Hydro shall pay all expenses of the Board arising from this Application.
  Date Issued:  
  May 30, 2017  
     
     
Newfoundland and Labrador Hydro
  Application:  
  Application for a general rate application filed by Newfoundland and Labrador Hydro on July 30, 2013; and an amended general rate application filed by Newfoundland and Labrador Hydro on November 10, 2014; and Order No. P.U. 49(2016); and an application filed by Newfoundland and Labrador Hydro on January 27, 2017 with revised proposals related to the general rate application to reflect Order No. P.U. 49(2016); and Order No. P.U. 14(2017) and P.U. 16(2017).
  Decision:  
 

REVENUE REQUIREMENT
1.   A revised average rate base for 2013 of $1,549,685,000 is approved.
2.   For the purpose of calculating the 2014 revenue deficiency the following are approved:
         a. a 2014 test year revenue requirement of $554,646,000;
         b. a 2014 forecast average rate base of $1,629,088,000; and
         c. a rate of return on average rate base for 2014 of 7.18% in a range of 6.98% to 7.38%.
3.   For 2015 rate setting purposes the following are approved:
         a. a 2015 test year revenue requirement of $566,510,000;
         b. a 2015 forecast average rate base of $1,785,353,000; and
         c. a rate of return on average rate base for 2015 of 6.61% in a range of 6.41% to 6.81%.
4.   For the purpose of calculating the 2015 revenue deficiency the following are approved:
         a. a 2015 test year revenue requirement of $539,219,000;
         b. a 2015 test year forecast average rate base of $1,729,093,000; and
         c. a rate of return on average rate base for 2015 of 6.67%, in a range of 6.47% to 6.87%.
5.   For the purpose of calculating the 2016 revenue deficiency the following are approved:
         a. a 2016 revenue requirement of $544,382,000;
         b. a forecast average rate base for 2016 of $1,802,235,000; and
         c. a rate of return on average rate base for 2016 of 6.61% in a range of 6.41% to 6.81%.

REVENUE DEFICIENCIES
6.   Hydro's proposal to not reflect the use of actual No. 6 fuel costs in the 2014 test year revenue requirement for the
      purpose of calculating the 2014 revenue deficiency is approved.
7.   Hydro's proposal to include the 2014 additional capacity-related supply costs approved for recovery by the Board in
      calculating its 2014 revenue deficiency is approved.
8.   Hydro's proposal to credit $6,577,000 to increase the balance in the Newfoundland Power RSP Current Plan balance
      effective January 1, 2017, and to debit $804,000 from the Newfoundland Power RSP Current Plan balance effective
      June 30, 2017, to eliminate the cumulative excess earnings for the period 2014 to 2017 from Newfoundland Power,
      is approved.
9.   Hydro's proposal to apply a rate reduction to Hydro's rural customers on the Labrador Interconnected System to       provide for the disposition of cumulative excess revenues over the period 2014 to 2017 is approved.
10.  Hydro's proposal to provide a refund to Labrador Industrial Transmission customers for disposition of cumulative
      excess revenues over the period 2014 to 2017 is approved.

RATES
11.   The following riders and adjustments for Hydro’s Utility Customer rate are approved to be effective July 1, 2017:
         a. RSP Fuel Price Projection Rider of 0.672 ¢ per kWh
         b. RSP Recovery Adjustment of (0.132) ¢ per kWh
         c. RSP Mitigation Adjustment rate of (0.911) ¢ per kWh
         d. Conservation and Demand Management Cost Recovery Adjustment of 0.019 ¢ per kWh
12.   The rates to be charged by Hydro to Newfoundland Power, Labrador Interconnected customers, Labrador Industrial Transmission customers, and Government Departments in Hydro’s diesel service areas, as set out in Schedule A to this Order, to be effective for electrical consumption on or after July 1, 2017, are approved.
13.   The Rules and Regulations for service to Hydro’s Rural customers, as set out in Schedule B to this Order, to be effective as of July 1, 2017, are approved.
14.   The Rules and Regulations for Hydro’s Conservation and Demand Management Cost Recovery, as set out in Schedule C to this Order, to be effective as of July 1, 2017, are approved.
15.   The Rate Stabilization Plan Rules, as set out in Schedule D to this Order, to be effective as of July 1, 2017, are approved.
16.   The interim Utility Customer rates approved in Order Nos. P.U 29(2013), P.U. 47(2014), P.U. 14(2015) and P.U. 9(2016), effective for consumption on and after September 1, 2013, are approved on a final basis.
17.   The interim Government Diesel rates approved in Order No. P.U. 14(2015), effective for consumption on and after July 1, 2015, are approved on a final basis.
18.   The interim Labrador Industrial Transmission Rate approved in Order Nos. P.U. 57(2014) and P.U. 15(2016), effective for consumption on and after January 1, 2015, is approved on a final basis.

EXCESS EARNINGS/DEFERRAL ACCOUNTS
19.   The following deferral account definitions, as set out in Schedule E to this Order, to be effective as of July 1, 2017 is approved:
         a. Isolated Systems Supply Cost Variance Deferral Account
         b. Energy Supply Cost Variance Deferral Account
         c. Conservation and Demand Management Cost Deferral Account
         d. Holyrood Conversion Rate Deferral Account
20.   The excess earnings account definition, as set out Schedule F to this Order, to be effective as of July 1, 2017, is approved.

COSTS
21.   Hydro shall pay all costs and expenses of the Board, including those of the Consumer Advocate, arising from this Application.

  Date Issued:  
  June 14, 2017  
     
     
Newfoundland Power Inc.
  Application:  
  Application by Newfoundland Power Inc. for approval pursuant to Sections 70 and 75 of the Act and Order Nos. P.U. 13(2013), P.U. 23(2013) and P.U. 17(2017) for: (i) approval of revisions to the rates, rules and regulations for a change in costs payable to Newfoundland and Labrador Hydro for the supply of power as a result of a revised utility rate effective July 1, 2017; (ii) approval of revised rate stabilization and municipal tax adjustments for the period July 1, 2017 to June 30, 2018; (iii) approval of a revised Rate Stabilization Clause related to the Maximum Monthly Charge; and (iv) approval of revised rates, rules and regulations to implement a Net Metering Service Option.
  Decision:  
 
  1. The Rate Stabilization Adjustment of (0.195) cents per kWh and the Municipal Tax Adjustment Factor of 1.02806 for the period July 1, 2017 to June 30, 2018 is approved.
  2. The Schedule of Rates, Tolls and Charges, as set out in Schedule A to this Order, to be effective on all electrical consumption on and after July 1, 2017, including the revised Rate Stabilization Clause and amendments to permit the implementation of a Net Metering Service Option, is approved.
  3. Newfoundland Power shall pay the expenses of the Board arising from this Application.
  Date Issued:  
  June 15, 2017  
     
     
Newfoundland and Labrador Hydro
  Application:  
  Application for a general rate application filed by Newfoundland and Labrador Hydro on July 30, 2013; and an amended general rate application filed by Newfoundland and Labrador Hydro on November 10, 2014; and Order No. P.U. 49(2016); and an application filed by Newfoundland and Labrador Hydro on January 27, 2017 with revised proposals related to the general rate application to reflect Order No. P.U. 49(2016); and Order No. P.U. 14(2017) and P.U. 16(2017); and the revised general rate application proposals related to the Industrial Customer Rate Stabilization Plan.
  Decision:  
 
  1. Hydro shall transfer the necessary funds from the Industrial Customer RSP Load Variation balance to eliminate the cumulative revenue deficiency for the period 2014 to 2017 for Island Industrial customers.
  2. Hydro will make a one-time payment of $0.174 million from the Industrial Customer RSP Load Variation balance to NARL Refining Limited Partnership on or before July 1, 2017.
  3. Hydro shall transfer the remaining Industrial Customer RSP Load Variation balance to the Industrial Customer RSP Current Plan to mitigate the proposed July 1, 2017 RSP Adjustment rate increase.
  4. Hydro shall file for the approval of the Board a revised Schedule of Rates, Tolls and Charges and RSP Rules, effective July 1, 2017, incorporating the findings of the Board in this Order and setting out detailed calculations in relation to the transfers from the Industrial Customer RSP Load Variation balance and the resulting impacts on rates.
  5. The revised Schedule of Rates, Tolls and Charges and RSP Rules shall set out the proposed RSP Current Plan rate, calculated in the ordinary course, as well as the RSP Current Plan mitigation rate.
  6. Hydro shall pay all costs and expenses of the Board arising in this matter.
  Date Issued:  
  June 20, 2017  
     
     
Newfoundland and Labrador Hydro
  Application:  
  Application for a general rate application filed by Newfoundland and Labrador Hydro for approval of a change in rates to be charged to its Island Interconnected, L’Anse au Loup and Isolated Rural customers and for approval of revised Rules and Regulations.
  Decision:  
 
  1. The rates proposed by Hydro to be effective for all electrical consumption on or after July 1, 2017 for its Island Interconnected and L’Anse au Loup customers (Rates 1.1, 1.1S, 2.1, 2.3, 2.4 and 4.1) and Isolated Rural customers, excluding government departments (Rates 1.2D, 1.2DS, 2.1D, 2.2D and 4.1D), as set out in Schedule A to this Order, are approved.
  2. The Rules and Regulations as set out in Schedule B to this Order are approved.
  3. The interim rates approved in Order Nos. P.U. 19(2015) and P.U. 26(2016) for Island Interconnected and Isolated Rural customers, effective for consumption on and after July 1, 2015, are approved on a final basis. 
  4. Hydro shall pay all expenses of the Board arising from this Application.
  Date Issued:  
  June 30, 2017  
     
     
Newfoundland and Labrador Hydro
  Application:  
  Application for a general rate application filed by Newfoundland and Labrador Hydro on July 30, 2013; and an amended general rate application filed by Newfoundland and Labrador Hydro on November 10, 2014; and Order No. P.U. 49(2016); and an application filed by Newfoundland and Labrador Hydro on January 27, 2017 with revised proposals related to the general rate application to reflect Order No. P.U. 49(2016); and Order No. P.U. 24(2017); and an application by Newfoundland and Labrador Hydro for approval of a change in rates to be charged to its Island Industrial customers and revised Rate Stabilization Plan rules.
  Decision:  
 
  1. The rates proposed by Hydro to be effective for all electrical consumption on or after July 1, 2017 for its Island Industrial customers, as set out in Schedule A to this Order, are approved.
  2. The Rate Stabilization Plan rules as set out in Schedule B to this Order are approved.
  3. The interim rates approved for Industrial Customers in Order Nos. P.U. 29(2013), P.U. 21 (2015) and P.U. 35(2015), effective for consumption on and after September 1, 2013, are approved on a final basis. 
  4. Hydro shall pay all expenses of the Board arising from this Application.
  Date Issued:  
  July 6, 2017  
     
     
Newfoundland and Labrador Hydro
  Application:  
  Application by Newfoundland and Labrador Hydro for approval of a capital expenditure to supplement the 2017 Allowance for Unforeseen Items for the construction and purchase of certain improvements and additions to its property pursuant to section 41 of the Act.
  Decision:  
 
  1. The addition of a supplementary amount of $540,000 to the 2017 Allowance for Unforeseen Items is approved.
  2. Hydro shall pay all expenses of the Board arising from this Application.
  Date Issued:  
  July 19, 2017  
     
     
Newfoundland Power Inc.
  Application:  
  Application by Newfoundland Power Inc. for approval of a Contribution in Aid of Construction for three-phase service to 10718 Nfld Inc., pursuant to section 41 of the Act.
  Decision:  
 
  1. The Contribution in Aid of Construction of three hundred and thirty-eight thousand six hundred fifty four dollars ($338,654), excluding HST, to provide three-phase service to an industrial park, Glencrest Business Centre, in the City of St. John’s is approved.
  2. Newfoundland Power shall pay all expenses of the Board arising from this Application.
  Date Issued:  
  July 19, 2017  
     
     
Newfoundland Power Inc.
  Application:  
  Application by Newfoundland Power Inc. for approval of a Contribution in Aid of Construction to upgrade the three-phase service provided to Husky Energy Inc.’s graving dock in Argentia, pursuant to section 41 of the Act.
  Decision:  
 
  1. The Contribution in Aid of Construction of two hundred and forty nine thousand four hundred and ninety eight dollars and eighty cents ($249,498.80), excluding HST, to upgrade the three-phase service to Husky Energy Inc.’s  graving dock in Argentia is approved.
  2. Newfoundland Power shall pay all expenses of the Board arising from this Application.
  Date Issued:  
  September 8, 2017  
     
     
Newfoundland and Labrador Hydro
  Application:  
  Application by Newfoundland and Labrador Hydro for approval of a general rate application to establish customer electricity rates for 2018 and 2019.
  Decision:  
 
  1. The intervenors in the Application are as set out in Schedule “A” to this Order.
  2. The schedule of dates for the Application shall be as set out in Schedule “B” to this Order and may be amended by the direction of the Board.
  3. The rules of procedure for the Application shall be as set out in Schedule “C” to this Order.
  Date Issued:  
  September 25, 2017  
     
     
Newfoundland and Labrador Hydro
  Application:  
  Application by Newfoundland and Labrador Hydro for approval of revisions to the Rate Stabilization Plan Rules, a revision to the Industrial customer rate sheets and the transfer of the Industrial Customer Rate Stabilization Plan Surplus Balance to the Industrial Customer Rate Stabilization Current Plan.
  Decision:  
 
  1. The revisions to the Rate Stabilization Plan rules, as set out in Schedule A to this Order, effective September 30, 2017, are approved.
  2. The revision to the Industrial Customer rate sheets, as set out in Schedule B to this Order, effective September 30, 2017, is approved.
  3. A transfer of the balance in the Industrial Customer RSP Surplus account to the Industrial Customer RSP Current Plan, effective September 30, 2017, is approved.
  4. Hydro shall pay all expenses of the Board arising from this Application.
  Date Issued:  
  October 10, 2017  
     
     
Newfoundland and Labrador Hydro
  Application:  
  Application by Newfoundland and Labrador Hydro for a general rate application filed on July 30, 2013; and an amended general rate application filed on November 10, 2014; and applications for costs pursuant to Order No. P.U. 49(2016) by: i) the Industrial Customer Group; ii) Innu Nation; iii) the Nunatsiavut Government; and iv) Vale Newfoundland and Labrador Limited.
  Decision:  
 
  1. The costs of the Industrial Customer Group are fixed at $300,000, exclusive of HST.
  2. The costs of Vale Newfoundland and Labrador Limited are fixed at $150,000, exclusive of HST.
  3. The costs of Innu Nation are fixed at $75,000, exclusive of HST.
  4. The costs of the Nunatsiavut Government are fixed at $75,000, exclusive of HST.
  5. Hydro shall, within thirty days, pay to the Industrial Customer Group, Vale Newfoundland and Labrador Limited, Innu Nation and the Nunatsiavut Government the costs fixed in this order.
  6. Hydro shall pay all expenses of the Board arising from these Applications.
  Date Issued:  
  October 24, 2017  
     
     
Newfoundland and Labrador Hydro
  Application:  
  Application by Newfoundland and Labrador Hydro for approval of a Commissioning Power Non-Firm Rate pursuant to Sections 70(1) and 71 of the Act.
  Decision:  
 
  1. The Commissioning Power Non-Firm Rate proposed by Hydro, as set out in Schedule A to be effective on electrical consumption on and after the date of this Order is approved.
  2. Hydro shall pay all expenses of the Board arising from this Application.
  Date Issued:  
  October 27, 2017  
     
     
Newfoundland and Labrador Hydro
  Application:  
  Application by Newfoundland and Labrador Hydro for approval of a revised Capacity Assistance Agreement with Corner Brook Pulp and Paper Limited pursuant to section 70(1), 71 and 80 of the Act.
  Decision:  
 
  1. The Revised Capacity Assistance Agreement between Hydro and Corner Pulp and Paper Limited, to be effective as of November 1, 2017, is approved.
  2. Hydro shall file a report no later than May 30 of each year during the term of the Revised Capacity Assistance Agreement setting out for the latest winter period:
    1. the capacity assistance requested and provided, including dates, times and duration;
    2. the system conditions at the time of the capacity assistance request, including generation available and calculation of system reserve; and
    3. payments made.
  3. Hydro shall pay all expenses of the Board arising from this Application.
  Date Issued:  
  October 31, 2017  
     
     
Newfoundland and Labrador Hydro
  Application:  
  Application by Newfoundland and Labrador Hydro to establish customer electricity rates for 2018 and 2019; and a submission filed by the Labrador Interconnected Group requesting an order of the Board directing Newfoundland and Labrador Hydro to respond to certain requests for information.
  Decision:  
 
  1. Hydro shall provide a response to the following Requests for Information in accordance with the findings of the Board: LAB-NLH-004, LAB-NLH-005, LAB-NLH-007, LAB-NLH-008, LAB-NLH-009, LAB-NLH-021, LAB-NLH-022, LAB-NLH-036, LAB-NLH-037, LAB-NLH-038, LAB-NLH-039, and LAB-NLH-040.
  2. Hydro will not be required to provide a response to LAB-NLH-016.
  3. Hydro shall pay all expenses of the Board arising from this Application.
  Date Issued:  
  November 3, 2017  
     
     
Newfoundland and Labrador Hydro
  Application:  
  Application by Newfoundland and Labrador Hydro to establish customer electricity rates for 2018 and 2019; and a submission by Newfoundland and Labrador Hydro setting out reasons as to why it should not be required to respond to certain requests for information filed by the Consumer Advocate.
  Decision:  
 
  1. Hydro shall provide a response to the following Requests for Information in accordance with the findings of the Board: CA-NLH-007, CA-NLH-019, CA-NLH-031, CA-NLH-032 and CA-NLH-090.
  2. Hydro shall pay all expenses of the Board arising from this Application.
  Date Issued:  
  November 3, 2017  
     
     
Newfoundland Power Inc.
  Application:  
  Application by Newfoundland Power Inc. for an Order pursuant to Sections 41 and 78 of the Act: (a) approving a 2018 Capital Budget of $83,876,000; (b) approving certain capital expenditures related to multi-year projects commencing in 2018; and (c) fixing and determining a 2016 rate base of $1,061,044,000.
  Decision:  
 
  1. Newfoundland Power’s proposed construction and purchase of improvements or additions to its property to be completed in 2018, as set out in Schedule A to this Order, are approved.
  2. Newfoundland Power’s proposed multi-year construction and purchase of improvements or additions to its property to begin in 2018, as set out in Schedule B to this Order, are approved.
  3. Newfoundland Power’s 2018 Capital Budget for improvements or additions to its property in an amount of $83,876,000, as set out in Schedule C to this Order, is approved.
  4. Newfoundland Power’s average rate base for the year ending December 31, 2016 is hereby fixed and determined at $1,061,044,000.
  5. Unless otherwise directed by the Board, Newfoundland Power shall file an annual report to the Board on its 2018 capital expenditures by March 1, 2019.
  6. Unless otherwise directed by the Board, Newfoundland Power shall provide, in conjunction with the 2019 Capital Budget Application, a status report on the 2018 capital budget expenditures showing for each project:
    1. the approved budget for 2018;
    2. the expenditures prior to 2018;
    3. the 2018 expenditures to the date of the application;
    4. the remaining projected expenditures for 2018;
    5. the variance between the projected total expenditures and the approved budget; and
    6. an explanation of the variance.
  7. Newfoundland Power shall pay all costs and expenses of the Board incurred in connection with the Application.
  Date Issued:  
  November 6, 2017  
     
     
Newfoundland Power Inc.
  Application:  
  Application by Newfoundland Power Inc. for approval of a Contribution in Aid of Construction to provide three-phase service to a lift station on Indian Pond Drive in the Town of Conception Bay South, pursuant to section 41 of the Act.
  Decision:  
 
  1. The Contribution in Aid of Construction of one hundred and fourteen thousand five hundred and eighty two dollars and sixty one cents ($114,582.61), excluding HST, to provide three-phase service to a lift station on Indian Pond Drive in the Town of Conception Bay South is approved.
  2. Newfoundland Power shall pay all expenses of the Board arising from this Application.
  Date Issued:  
  November 24, 2017  
     
     
Newfoundland and Labrador Hydro
  Application:  
  Application by Newfoundland and Labrador Hydro for the recovery of 2015 and 2016 balances in the Isolated Systems Supply Cost Variance Deferral Account, the Energy Supply Cost Variance Deferral Account, and the Holyrood Conversion Rate Deferral Account, pursuant to sections 70(1) and 80 of the Act.
  Decision:  
 
  1. The Application is dismissed.
  2. Hydro shall pay all costs and expenses of the Board arising from this Application.
  Date Issued:  
  November 29, 2017  
     
     
Newfoundland Power Inc.
  Application:  
  A filing by Newfoundland Power Inc. in accordance with Order No. P.U. 4(1997-98) to update the cost factors used in its Contribution in Aid of Construction Policy.
  Decision:  
 
  1. The revised cost factors as set out in Schedules A, B, C and D to this Order are approved to be used in the calculation of all CIACs with effect from January 1, 2018, and, where advantageous to the customer, on all CIACs quoted but unpaid as of January 1, 2018.
  2. Newfoundland Power shall submit a revised CIAC Policy incorporating the revisions approved herein.
  3. Newfoundland Power shall pay the expenses of the Board arising from this Application.
  Date Issued:  
  December 7, 2017  
     
     
Newfoundland Power Inc.
  Application:  
  A filing by Newfoundland Power Inc. by Newfoundland Power Inc. for approval of its 2018 forecast average rate base and rate of return on rate base in accordance with Order No. P.U. 18(2016).
  Decision:  
 
  1. Newfoundland Power’s forecast average rate base for 2018 of $1,115,997,000 is approved.
  2. Newfoundland Power’s rate of return on rate base for 2018 of 7.04% in a range of 6.86% to 7.22% is approved.
  3. Newfoundland Power shall pay the expenses of the Board in connection with this Application.
  Date Issued:  
  December 8, 2017  
     
     
Newfoundland and Labrador Hydro
  Application:  
  Application by Newfoundland and Labrador Hydro for approval to issue debt pursuant to section 91 of the Act.
  Decision:  
 
  1. The proposal by Hydro proposal to borrow from the Province of Newfoundland and Labrador in an amount of up to $700,000,000 to retire outstanding short-term debt, including an outstanding short-term promissory note in favour of Nalcor, and to finance items such as debt service, fuel, ongoing capital, operating and maintenance costs, the refinancing of Series X debentures, and Hydro’s approved capital program, is approved subject to the following conditions:
    1. The debt shall be issued on or before March 31, 2018.
    2. Hydro shall file with the Board an affidavit specifying the terms and conditions of the debt issue within five (5) days after terms and conditions have been successfully negotiated, setting out the following where applicable:
      1. date of issue;
      2. term;
      3. maturity date;
      4. principal amount;
      5. interest rate;
      6. price to the public and to the underwriters;
      7. yield to the public;
      8. underwriting fee;
      9. actual cost (i.e. yield) to Hydro; and
      10. any other material terms or conditions.
    3. Hydro shall file with the Board a copy of the Loan Agreement relating to the debt issue within five (5) days after the conditions have been accepted by Hydro.
    4. Hydro shall file with the Board a report on the disposition of the proceeds no later than six months from the date of the closing.
  2. Hydro shall pay all expenses of the Board arising from this Application.
  Date Issued:  
  December 11, 2017  
     
     
Newfoundland and Labrador Hydro
  Application:  
  Application by Newfoundland and Labrador Hydro for an Order approving, pursuant to Section 41 of the Act: (a) its 2018 capital purchases and construction; projects in excess of $50,000; (b) its 2018 Capital Budget; and (c) its estimated contributions in aid of construction for 2018.
  Decision:  
 
  1. Hydro’s proposed construction and purchase of improvements or additions to its property in excess of $50,000 to be completed in 2018, as set out in Schedule A to this Order, are approved.
  2. Hydro’s proposed multi-year construction and purchase of improvements or additions to its property in excess of $50,000 to begin in 2018, as set out in Schedule B to this Order, are approved.
  3. Hydro’s proposed contributions in aid of construction for 2018 are approved.
  4. Hydro’s 2018 Capital Budget for improvements or additions to its property in an amount of $170,868,300, as set out in Schedule C to this Order, is approved.
  5. Unless otherwise directed by the Board Hydro shall file with its 2019 Capital Budget Application:
        a. an updated overview in relation to capital expenditures for the Holyrood Thermal Generating Station; and
        b. a report setting out near-term and long-term plans for the Hardwoods and Stephenville gas turbines.
  6. Unless otherwise directed by the Board Hydro shall file an annual report on its 2018 capital expenditures by March 1, 2019.
  7. Unless otherwise directed by the Board Hydro shall provide, in conjunction with the 2019 Capital Budget Application, a status report on the 2018 capital budget expenditures showing for each project:
        (i) the approved budget for 2018;
        (ii) the expenditures prior to 2018;
        (iii) the 2018 expenditures to the date of the application; \
        (iv) the remaining projected expenditures for 2018;
        (v) the variance between the projected total expenditures and the approved budget; and
        (vi) an explanation of the variance.
  8. The Industrial Customer Group may file a claim for costs within 30 days of this Order.
  9. Hydro shall pay all costs and expenses of the Board incurred in connection with the Application.
  Date Issued:  
  December 22, 2017  
     
     
Newfoundland and Labrador Hydro
  Application:  
  Application by Newfoundland and Labrador Hydro for approval to continue the current Island Industrial customer rates pursuant to Sections 70(1) and 71 of the Act.
  Decision:  
 
  1. The January 1, 2018 adjustment to the Island Industrial customer Rate Stabilization Plan rates is suspended until a further Order of the Board.
  2. The current Island Industrial customer rates are continued on an interim basis, effective January 1, 2018, and Hydro shall within 30 days of this Order file a revised Schedule of Rates, Tolls and Charges setting out that the rates for the Island Industrial customers are interim.
  3. Hydro shall pay all expenses of the Board arising from this Application.
  Date Issued:  
  December 28, 2017  

Newfoundland and Labrador Hydro
  Application:  
  Application for approval of costs by Vale Newfoundland and Labrador Limited pursuant to Order No. P.U. 17(2015).
  Decision:  
  1. The costs of Vale are fixed at $5,232.00, exclusive of HST
  2. Hydro shall, within thirty days, pay costs to Vale in the amount of $5,232.00.
  Date Issued:  
  January 28, 2016  
     
     
Newfoundland and Labrador Hydro
  Application:  
  Application for approval of a cost submission by Vale Newfoundland & Labrador Limited pursuant to Order No. P.U. 36(2015).
  Decision:  
  1. The costs of Vale are fixed at $4,167.00, exclusive of HST.
  2. Hydro shall, within thirty days, pay costs to Vale in the amount of $4,167.00.
  Date Issued:  
  January 28, 2016  
     
     
Newfoundland Power
  Application:  
  Application by Newfoundland Power Inc. for approval of:
(i) revised distribution line costs per metre for Contributions in Aid of Construction (CIACs);
(ii) revised distribution plant upgrade cost for CIACs; and
(iii) CIAC cost factors.
  Decision:  
  1. The revised cost factors in Schedules A, B, C and D attached to this Order are approved to be used in the calculation of all CIACs with effect from February 10, 2016, and, where advantageous to customers of Newfoundland Power, on all CIACs quoted but unpaid as of February 10, 2016.
  2. Newfoundland Power shall submit a revised CIAC Policy in its entirety incorporating the revisions approved herein.
  3. Newfoundland Power shall pay the expenses of the Board arising from this Application.
  Date Issued:  
  January 28, 2016  
     
     
Newfoundland Power
  Application:  
  Application for approval of a of a contribution in aid of construction for single-phase service for the Seventh Day Adventist Church, pursuant to section 41 of the Act.
  Decision:  
  1. The Contribution in Aid of Construction of sixty-nine thousand one hundred ninety-seven dollars and five cents ($69,197.05), excluding HST, to provide single-phase service to Seventh Day Adventist Church is approved.
  2. Newfoundland Power shall pay all expenses of the Board arising from this Application.
  Date Issued:  
  February 10, 2016  
     
     
Newfoundland and Labrador Hydro
  Application:  
  Application for approval of costs by Industrial Customer Group pursuant to Order No. P.U. 17(2015).
  Decision:  
  1. The costs of the Industrial Customer Group are fixed at $17,587.74, exclusive of HST.
  2. Hydro shall, within thirty days, pay costs to the Industrial Customer Group in the amount of $17,587.74.
  Date Issued:  
  February 10, 2016  
     
     
Newfoundland and Labrador Hydro
  Application:  
  Application for approval of costs by Vale Newfoundland and Labrador Limited pursuant to Order No. P.U. 35(2015).
  Decision:  
  1. The costs of Vale are fixed at $3,026.00, exclusive of HST.
  2. Hydro shall, within thirty days, pay costs to Vale in the amount of $3.026.00
  Date Issued:  
  February 15, 2016  
     
     
Newfoundland and Labrador Hydro
  Application:  
  Application for approval of costs by Industrial Customer Group pursuant to Order No. P.U. 35(2015).
  Decision:  
  1. The costs of the Industrial Customer Group are fixed at $6,827.75, exclusive of HST. .
  2. Hydro shall, within thirty days, pay costs to the Industrial Customer Group in the amount of $6,827.75
  Date Issued:  
  February 15, 2016  
     
     
Newfoundland and Labrador Hydro
  Application:  
  Application for approval of a capital expenditure to supplement the 2016 Allowance for Unforeseen Items for the construction and purchase of certain improvements and additions to its property pursuant to section 41 of the Act.
  Decision:  
  1. The addition of a supplementary amount of $1,000,000 to the 2016 Allowance for Unforeseen Items is approved.
  2. Hydro will establish a separate account to record the variance above the $1,000,000 Allowance for Unforeseen items approved in Order No. P.U. 33(2015) associated with the expenditures related to:
i) the Western Avalon Terminal Station (WAV) – T5 Tap Changer failure;
ii) boiler tube replacement on Holyrood Thermal Generating Station Unit 2;
iii) boiler tube replacement on Holyrood Thermal Generating Station Unit 1; and
iv) transmission line TL 259 rerouting at Sally’s Cove;
with the recovery of this variance to be addressed in a subsequent order of the Board following a further application by Hydro.
  3. Hydro shall pay all expenses of the Board arising from this Application.
  Date Issued:  
  March 22, 2016  
     
     
Newfoundland and Labrador Hydro
  Application:  
  Application by Newfoundland and Labrador Hydro for approval of continued use, on an interim basis, of previously approved revisions to the utility rate charged to Newfoundland Power Inc. pursuant to sections 70 and 71 of the Act.
  Decision:  
 
  1. The proposed Utility rate is approved, on an interim basis, effective December 1, 2015.
  2. Hydro shall pay all costs and expenses of the Board in connection with this Application.
  Date Issued:  
  March 31, 2016  
     
     
Newfoundland Power Inc.
  Application:  
  Application by Newfoundland Power Inc. for an Order of the Board providing for disposition of the balance in the Optional Seasonal Rate Revenue and Cost Recovery Account pursuant to Sections 58 and 80 of the Act.
  Decision:  
 
  1. The disposition of the balance in the Optional Seasonal Rate Revenue and Cost Recovery Account as of December 31, 2015 by charging the balance of $69,298 to the Rate Stabilization Account as of March 31, 2016 is approved.
  2. Newfoundland Power shall pay all costs and expenses of the Board in connection with this Application.
  Date Issued:  
  April 11, 2016  
     
     
Newfoundland Power Inc.
  Application:  
  Application by Newfoundland Power Inc. for an Order of the Board approving the balance in the Weather Normalization Reserve as of December 31, 2015 pursuant to sections 69(3) and 78 of the Act.
  Decision:  
 
  1. Newfoundland Power’s Weather Normalization Reserve of a negative balance of $4,410,537 as of December 31, 2015 is approved.
  2. Newfoundland Power shall pay all costs and expenses of the Board in connection with this Application.
  Date Issued:  
  April 11, 2016  
     
     
The Board’s Investigation and Hearing into Supply Issues and Power Outages on the Island Interconnected System Matter
  Motion by Newfoundland and Labrador Hydro for a determination that certain Requests for Information filed by Grand Riverkeeper Labrador, Inc. are outside the scope of the proceeding; and Motion by Grand Riverkeeper Labrador, Inc. for an order directing Newfoundland and Labrador Hydro to provide full and complete responses to certain Requests for Information.
  Decision:  
 
  1. The motion of Hydro for an Order determining that GRK-NLH-087-090 are outside the scope of the proceeding is hereby accepted.
  2. The motion of Hydro for an Order determining that GRK-NLH-092 is outside the scope of the proceeding is hereby denied.
  3. The motion of Grand Riverkeeper Labrador, Inc. for an Order requiring Hydro to provide full and complete responses to GRK-NLH-093, GRK-NLH-100, GRK-NLH-104, GRK-NLH-105, GRK-NLH-107 and GRK-NLH-115 through to GRK-NLH-121 is hereby denied.
  Date Issued:  
  April 22, 2016  
     
     
Newfoundland and Labrador Hydro
  Prudence Review  
  A review undertaken as part of the Board’s consideration of an amended general rate application, filed by Newfoundland and Labrador Hydro (“Hydro”) on November 10, 2014, and examines the prudence of Hydro’s actions and decisions related to 11 projects and expenditures for which Hydro is seeking cost recovery from customers.
  Decision:  
 
  1. Hydro will not recover capital or operating expenses in the 2014 revenue requirement and/or the 2015 test year costs associated with:
    1. overhauls of the Sunnyside B1L03 and Holyrood B1L17 breakers associated with imprudence
    2. the portion of the Sunnyside Terminal Station equipment repairs and replacement associated with imprudence
    3. the Western Avalon T5 tap changer replacement and transformer repairs associated with imprudence
    4. extraordinary transformer and breaker repairs in 2014 and 2015 associated with imprudence
    5. additional supply costs associated with the 2014 failure of Holyrood breaker B1L17 and the resulting outage of Holyrood Unit 1 associated with imprudence
    6. certain expenses related to professional services-consulting fees, salary transfers, and overtime associated with imprudence and the Board’s investigation into the January 2014 outages
    7. Holyrood Unit 1 turbine failure in 2013.
  2. Hydro will not recover in the 2014 revenue requirement $500,000 associated with its imprudence in managing black start capability at Holyrood.
  3. Hydro will create a separate account into which will be transferred professional services-consulting fees, salary transfers and overtime costs for 2014, 2015 and subsequent years relating to Phase Two of the Board’s investigation into the January 2014 outages, with the recovery of the costs to be addressed in a subsequent order of the Board following a further application by Hydro.
  4. Hydro will file in accordance with the subsequent direction of the Board a revised 2014 revenue requirement and revenue deficiency calculation, a revised 2015 test year revenue requirement and revenue deficiency calculation, and supporting documentation reflecting the findings of the Board in this Decision and Order.
  Date Issued:  
  April 28, 2016  
     
     
Newfoundland and Labrador Hydro
  Application  
  Application by Newfoundland and Labrador Hydro to abandon the Long Harbour Terminal Station, pursuant to section 38 of the Act.
  Decision:  
 
  1. Pursuant to Section 38 of the Act, the abandonment by Hydro of the Long Harbour Terminal Station is approved.
  2. Hydro shall pay all costs and expenses of the Board incurred in connection with this Application.
  Date Issued:  
  April 29, 2016  
     
     
Newfoundland and Labrador Hydro
  Application  
  Application filed by Newfoundland and Labrador Hydro on November 10, 2014; and proposed changes to the interim transmission demand rate for Labrador industrial customers.
  Decision:  
 
  1. The Labrador Industrial-Transmission Rate as set out in Schedule A is approved on an interim basis.
  2. Hydro shall pay all expenses of the Board arising from this Application.
  Date Issued:  
  May 3, 2016  
     
     
Newfoundland and Labrador Hydro
  Application  
  Application filed by Newfoundland and Labrador Hydro for approval of: (1) a Contribution in Aid of Construction for a line extension to serve Domestic Customers in the cottage area known as Duley Lake, near Labrador City pursuant to section 41 of the Act; and (2) a deviation from the Contribution in Aid of Construction applicable to Domestic Customers in relation to the calculation based on estimated construction costs in addition to line extension costs as provided for in clause 6(a)(iii) of the policy.
  Decision:  
 
  1. The Non-Refundable Contribution in Aid of Construction of thirteen thousand eight hundred fifty-eight dollars and seventy cents ($13,858.70), excluding HST, to apply to Domestic Customers located in the cottage area known as Duley Lake is approved.
  2. A deviation from the Policy requirement respecting the calculation of the Contribution in Aid of Construction is approved.
  3. Hydro shall pay all expenses of the Board arising from this Application.
  Date Issued:  
  May 17, 2016  
     
     
Newfoundland and Labrador Hydro
  Application  
  Application filed by Newfoundland and Labrador Hydro for approval of of a capital expenditure to procure 12 MW of diesel generation at the Holyrood Thermal Generating Station, pursuant to section 41 of the Act.
  Decision:  
 
  1. The proposed capital expenditure in the amount of $6,300,000 to purchase 12 MW of diesel generation presently installed at the Holyrood Thermal Generating Station is approved.
  2. The proposed deferral and amortization of $1,300,000 over a period of five years with unamortized balances to be included in rate base is approved.
  3. The Industrial Customer Group is entitled to an award of costs in an amount to be fixed by the Board upon the filing of a detailed cost submission within 30 days of this Order.
  4. Hydro shall pay all expenses of the Board arising from this Application.
  Date Issued:  
  May 24, 2016  
     
     
Newfoundland Power Inc.
  Application  
  Application for approval of a general rate application by Newfoundland Power Inc. for approval of, inter alia, rates to be charged its customers.
  Decision:  
 

Rate Base, Return on Rate Base and Range of Return

  1. Newfoundland Power shall file an application for approval of a revised forecast average rate base and rate of return on rate base for 2016 and 2017, based on the proposals in the Application and incorporating the determinations of the Board in this Order, including: 
    1. a common equity component in the capital structure not to exceed 45% for ratemaking purposes; and
    2. a ratemaking rate of return on common equity of 8.5%.
  2. Newfoundland Power shall file an application on or before November 15, 2017 for approval of the 2018 forecast average rate base and rate of return on rate base maintaining the ratemaking common equity ratio and return on common equity established in this Order.
  3. Newfoundland Power shall, unless otherwise directed by the Board, file its next general rate application, with a 2019 test year, no later than June 1, 2018.
  4. The use of an automatic adjustment formula shall be suspended pending a further Order of the Board.

Revenue Requirement

  1. Newfoundland Power shall calculate and file a revised forecast revenue requirement for the 2016 and 2017 test years, based on the proposals contained in the Application and incorporating the determinations of the Board in this Order, including a reduction of 50% in the Short-Term Incentive amounts related to earnings and regulatory performance.

Depreciation

  1. Newfoundland Power’s proposal to use the depreciation rates recommended in the 2014 Depreciation Study filed for the calculation of depreciation expense with effect from January 1, 2016 is approved.

Other Regulatory Matters

  1. The amortization from July 1, 2016 to December 31, 2018 of hearing costs in an amount of up to $1.0 million is approved, and any costs over this amount billed to Newfoundland Power may be collected through the Rate Stabilization Account.
  2. The amortization from July 1, 2016 to December 31, 2018 of the amount of the revenue shortfall for 2016 resulting from the July 1, 2016 implementation of new rates arising from this Order is approved.
  3. Newfoundland Power’s proposal to change its evaluation of customer conservation programs by use of the total resource cost test and program administrator cost test is approved.

Rates, Rules and Regulations

  1. Newfoundland Power’s proposed changes to the rules and regulations covering service, and proposed changes to rate design and structure, as set out in the Application, are approved.
  2. Newfoundland Power’s proposed changes to the General Service Contribution in Aid of Construction Policy to be effective on and after July 1, 2016 are approved.
  3. Newfoundland Power shall file an application for approval of a revised Schedule of Rates, Tolls and Charges effective for service provided on and after July 1, 2016, based on the proposals in the Application, incorporating the determinations of the Board in this Order, and the annual Rate Stabilization Account adjustment.
  4. Newfoundland Power shall file a revised Rules and Regulations to be effective July 1, 2016.

Costs

  1. Newfoundland Power shall pay the costs and expenses of the Board arising from the Application, including the expenses of the Consumer Advocate incurred by the Board.
  Date Issued:  
  June 8, 2016  
     
     
Newfoundland and Labrador Hydro
  Application  
  Application filed by Newfoundland and Labrador Hydro for approval to replace boiler tubes on Units 1 and 2 and to complete additional reliability improvements at the Holyrood Thermal Generating Station pursuant to Section 41 of the Act.
  Decision:  
 
  1. The proposed capital expenditure of $11,800,000 to replace lower reheater tubes that service the Unit 1 and 2 boilers and to complete additional reliability improvements to replace critical equipment and conduct level 2 condition assessments at the Holyrood Thermal Generating Station is approved.

  2. Hydro shall report on the contingency expenditures associated with additional component replacements arising from this project, setting out in detail the work which was done, the associated costs and the justification, as a part of its year-end capital expenditures variance report.
  3. Hydro shall pay all expenses of the Board arising from this Application.

  Date Issued:  
  June 10, 2016  
     
     
Newfoundland and Labrador Hydro
  Application  
  Application filed by Newfoundland and Labrador Hydro for approval to reroute transmission line TL 227 and distribution line Sally’s Cove L1 pursuant to Section 41 of the Act.
  Decision:  
 
  1. The proposed capital expenditures in the amount of $717,000 in 2016 and $1,533,000 in 2017 to reroute transmission line TL 227 and distribution line Sally’s Cove L1 are approved.
  2. Hydro shall pay all expenses of the Board arising from this Application.

  Date Issued:  
  June 10, 2016  
     
     
Newfoundland and Labrador Hydro
  Application  
  Application filed by Newfoundland and Labrador Hydro for approval pursuant to Section 70 of the Act, of the Rate Stabilization Plan Adjustment in the rates to be charged to Newfoundland Power Inc.
  Decision:  
 
  1. The rates to be charged by Hydro to Newfoundland Power, as set out in Schedule “A” to this Order, to be effective for electrical consumption on or after July 1, 2016, are approved on an interim basis.
  2. Hydro shall pay the expenses of the Board incurred in connection with this matter.
  Date Issued:  
  June 13, 2016  
     
     
Newfoundland and Labrador Hydro
  Application  
  Application filed by Newfoundland and Labrador Hydro for approval to refurbish gas generator engines at the Hardwoods Gas Turbine Plant and the Stephenville Gas Turbine Plant pursuant to Section 41 of the Act
  Decision:  
 
  1. The proposed capital expenditure in the amount of $3,047,100 for the refurbishment of gas generator End A engine, serial number 202205, at the Hardwoods Gas Turbine Plant and gas generator End A engine, serial number 202204, at the Stephenville Gas Turbine Plant, is approved.

  2. Hydro shall file a report by November 30, 2016 in relation to the refurbishment of the gas generator engines addressing the causes of the failures and impacts and considerations in relation to the reliability of Hardwoods and Stephenville.
  3. Hydro shall pay all expenses of the Board arising from this Application.

  Date Issued:  
  June 15, 2016  
     
     
Newfoundland and Labrador Hydro
  Application  
  Application filed by Newfoundland and Labrador Hydro to vary the amounts approved in Order No. P.U. 17(2016) related to 12 MW of diesel generation at the Holyrood Thermal Generating Station.
  Decision:  
 
  1. The deferral and amortization of the additional lease costs of $300,000 associated with the 12 MW of diesel generation installed at Holyrood Thermal Generating Station over a period of five years with unamortized balances to be included in rate base is approved.
  2. Hydro shall pay all expenses of the Board arising from this Application.
  Date Issued:  
  June 22, 2016  
     
     
Newfoundland and Labrador Hydro
  Application  
  Application filed by Newfoundland and Labrador Hydro to approval of a deferral account for diesel fuel consumed in 2016 to provide capacity and energy to the Island Interconnected system pursuant to section 70 of the Act.
  Decision:  
 
  1. The Application is denied.
  2. The Industrial Customer Group and Vale are entitled to an award of costs in an amount to be determined by the Board upon the filing of a detailed cost submission within 30 days of the date of this Order.
  3. Hydro shall pay the expenses of the Board arising from this Application.
  Date Issued:  
  June 22, 2016  
     
     
Newfoundland Power Inc
  Application  
  Application filed by Newfoundland Power Inc. for approval of inter alia, rates to be charged its customers; and an application filed by Newfoundland Power Inc. for approval of: (i) customer rates, tolls and charges reflecting the determinations set out in Order No. P.U. 18(2016); and (ii) a revised rate stabilization adjustment and municipal tax adjustment to apply to the rates of Newfoundland Power Inc. for the period of July 1, 2016 to June 30, 2017.
  Decision:  
 
  1. The forecast average rate base for 2016 of $1,060,334,000 and the forecast average rate base for 2017 of $1,104,702,000 are approved.
  2. The rate of return on average rate base for 2016 of 7.21% in a range of 7.03% to 7.39% and the rate of return on average rate base for 2017 of 7.19% in a range of 7.01% to 7.37% are approved.
  3. The Rate Stabilization Adjustment of (1.110) cents/kWh and the Municipal Tax Adjustment Factor of 1.02526 for the period of July 1, 2016 to June 30, 2017 are approved.
  4. The Schedule of Rates, Tolls and Charges of Newfoundland Power as set out in Schedule A, to be effective for all electrical consumption on and after July 1, 2016, is approved.
  5. The Rules and Regulations of Newfoundland Power as set out in Schedule B to be effective on and after July 1, 2016 are approved.
  6. Newfoundland Power shall pay the expenses of the Board arising from this Application.
  Date Issued:  
  June 29, 2016  
     
     
Newfoundland and Labrador Hydro
  Application  
  Application filed by Newfoundland and Labrador Hydro for approval of a change in rates to be charged to its Island Interconnected and Isolated Rural customers.
  Decision:  
 
  1. The rates proposed by Hydro to be effective for all electrical consumption on or after July 1, 2016 for its Island Interconnected customers (rate Classes 1.1, 1.1S, 2.1, 2.3, 2.4 and 4.1), excluding Burgeo School & Library, and Isolated Rural customers (rate Classes 1.2D, 1.2DS, 2.1D, 2.2D and 4.1D), as set out in Schedule A to this Order, are approved on an interim basis.
  2. Hydro shall pay all expenses of the Board arising from this Application.
  Date Issued:  
  June 29, 2016  
   

 

 

The Board’s Investigation and Hearing into Supply Issues and Power Outages on the Island Interconnected System Matter
  Application  
  An application by Grand Riverkeeper Labrador, Inc. for an interim award of costs
  Decision:  
 
  1. The Application is denied
  Date Issued:  
  July 7, 2016  
     
     
Newfoundland and Labrador Hydro
  Application  
 

Application filed by Newfoundland and Labrador Hydro for approval to refurbish Unit 4 at Bay d’Espoir pursuant to section 41 of the Act.

  Decision:  
 
  1. The proposed capital expenditure in the amount of $1,977,300 for the refurbishment and overhaul of Unit 4 at Bay d’Espoir is approved.
  2. Hydro shall pay all expenses of the Board arising from this Application
  Date Issued:  
  July 8, 2016  
     
     
Newfoundland Power Inc.
  Application  
  Application filed by Newfoundland Power Inc. for approval of a Contribution in Aid of Construction for a line extension to serve a seasonal residential development in the cottage area known as Ocean Pond, near Whitbourne
  Decision:  
 
  1. The Contribution in Aid of Construction of one hundred thirty six thousand seven hundred twenty five dollars ($136,725.00), excluding HST, to apply to a seasonal residential development located in the cottage area known as Ocean Pond, near the Town of Whitbourne, is approved.
  2. A deviation from the Policy requirement respecting the calculation of the Contribution in Aid of Construction is approved.
  3. Newfoundland Power shall pay all expenses of the Board arising from this Application.
  Date Issued:  
  July 13, 2016  
     
     
Newfoundland Power Inc.
  Application  
  Application filed by Newfoundland Power Inc. for approval of a Contribution in Aid of Construction for approval of a Contribution in Aid of Construction for three-phase service for Bell Aliant Regional Communications LP.
  Decision:  
 
  1. The Contribution in Aid of Construction of five hundred seventy-four thousand one hundred seventy-nine dollars and twelve cents ($574,179.12), excluding HST, to provide three-phase service to Bell Aliant Regional Communications LP is approved.
  2. Newfoundland Power shall pay all expenses of the Board arising from this Application.
  Date Issued:  
  July 14, 2016  
     
     
Newfoundland Power Inc.
  Application  
  Application filed by Newfoundland Power Inc. for approval of a Contribution in Aid of Construction approval of: (1) a Contribution in Aid of Construction for a line extension to serve Domestic Customers in the cottage area known as Stagg Pond, near Glovertown, pursuant to section 41 of the Act; and (2) a deviation from the Contribution in Aid of Construction applicable to Domestic Customers in relation to the calculation of the participation percentage as provided for in clause 6(A)(II) of the policy.
  Decision:  
 
  1. The Non-Refundable Contribution in Aid of Construction of nine thousand six hundred forty-six dollars and four cents ($9,646.04), excluding HST, to apply to Domestic Customers located in the cottage area known as Stagg Pond, near Glovertown, is approved.
  2. A deviation from the Policy requirement respecting down payments to allow Newfoundland Power to commence construction of the Extension is approved.
  3. Newfoundland Power shall pay all expenses of the Board arising from this Application.
  Date Issued:  
  July 14, 2016  
     
     
Newfoundland Power Inc.
  Application  
  Application filed by Newfoundland Power Inc. for approval of a Contribution in Aid of Construction for three-phase service for 10718 Nfld. Inc.
  Decision:  
 
  1. The Contribution in Aid of Construction of sixty-two thousand five hundred sixty-one dollars ($62,561.00), excluding HST, to provide three-phase service to 10718 Nfld. Inc. is approved.
  2. Newfoundland Power shall pay all expenses of the Board arising from this Application.
  Date Issued:  
  July 14, 2016  
     
     
Newfoundland and Labrador Hydro
  Application  
  Application for approval of a capital expenditure to procure 12 MW of diesel generation at the Holyrood Thermal Generating Station; and an application for costs by the Industrial Customer Group pursuant to Order No. P.U. 17(2016).
  Decision:  
 
  1. The costs of the Industrial Customer Group are fixed at $5,665.94, exclusive of HST.
  2. Hydro shall, within thirty days, pay costs to the Industrial Customer Group in the amount of $5,665.94.
  Date Issued:  
  July 19, 2016  
     
     
Newfoundland Power Inc.
  Application  
  Application for approval of a general rate application by Newfoundland Power Inc. for approval of, inter alia, rates to be charged its customers; and a request for costs.
  Decision:  
 
  1. The request for costs is denied.
  Date Issued:  
  July 21, 2016  
     
     
Newfoundland Power Inc.
  Application  
  Application for approval for the refund to its customers of a surplus balance in Newfoundland and Labrador Hydro’s Rate Stabilization Plan.
  Decision:  
 
  1. The Newfoundland Power Customer Refund Plan as set out in Schedule A to this Order is approved.
  2. Newfoundland Power shall file with the Board:
    1. a. copies of correspondence with Canadian Revenue Agency with respect to the applicability of the Harmonized Sales Tax (HST) to the refunds;
      b. copies of correspondence with the Government of Newfoundland and Labrador with respect to the applicability of the residential energy rebate in determining the refunds;
      c. a report on the status of the refunds in its quarterly reporting to the Board throughout the refund process; and
      d. a final report once all refunds have been issued in accordance with the Newfoundland Power Customer Refund Plan.
  3. Newfoundland Power shall pay the expenses of the Board incurred in connection with this Application.
  Date Issued:  
  September 2, 2016  
     
     
Newfoundland and Labrador Hydro
  Application  
  Application for a proposal by Newfoundland and Labrador Hydro for the refund to its customers of a surplus balance in Newfoundland and Labrador Hydro’s Rate Stabilization Plan.
  Decision:  
 
  1. The Hydro Customer Refund Plan as set out in Schedule A to this Order is approved.
  2. Hydro shall file with the Board:
    1. copies of correspondence with Government as to formal confirmation of the applicability of recovery of the residential energy rebate in determining customer refunds;
    2. a report on the status of customer refunds in its quarterly reporting to the Board throughout the refund process; and
    3. a final report once all refunds have been issued in accordance with the Hydro Customer Refund Plan.
  3. Hydro shall pay the expenses of the Board incurred in connection with the Application.
  Date Issued:  
  September 7, 2016  
     
     
Newfoundland and Labrador Hydro
  Application  
  Application for approval to acquire the Wabush Terminal Station pursuant to section 41 of the Act.
  Decision:  
 
  1. The proposed capital expenditure in the amount of $490,000 for the purchase of :
    1. the Wabush Terminal Station including installed equipment;
    2. a segment of the two 230 kV transmission lines that run between the Churchill Falls Switchyard and the Wabush Terminal Station;
    3. lands adjacent to the Wabush Terminal Station; and
    4. a parcel of land near the Wabush Terminal Substation,
is approved.
  1. Hydro shall pay all expenses of the Board arising from this Application.
  Date Issued:  
  September 8, 2016  
     
     
Newfoundland and Labrador Hydro
  Application  
  Application for approval to issue debentures pursuant to section 91 of the Act.
  Decision:  
 
  1. Hydro’s proposal to issue debentures in an amount of up to $350,000,000 to refinance Series AE debentures totaling $225,000,000 and to retire outstanding short-term debt is approved subject to the following conditions:
    1. The debentures shall be issued on or before October 31, 2016.
    2. Hydro shall file with the Board a report specifying the terms and conditions of the bond issue within five
      1. (5) days after closing, setting out the following:
        1. date of issue;
        2. term;
        3. maturity date;
        4. principal amount;
        5. interest rate;
        6. particulars of sinking fund, if any;
        7. price to public and to the underwriters;
        8. yield to the public;
        9. underwriting fee;
        10. actual cost (i.e. yield) to Hydro; and
        11. any other material terms or conditions.
    3. Hydro shall file with the Board a copy of the Underwriting Agreement relating to the debentures within five (5) days after closing.
    4. Hydro shall file with the Board a copy of the Order in Council providing approval to issue the debentures within five (5) days of receipt of the Order in Council.
    5. Hydro shall file with the Board a report on the disposition of the proceeds no later than six months from the date of the closing.
  2. Hydro shall pay all expenses of the Board arising from this Application.
  Date Issued:  
  September 9, 2016  
     
     
Newfoundland Power Inc.
  Application  
  Application by Newfoundland Power Inc. for an Order pursuant to Sections 41 and 78 of the Act:
     (a) approving a 2017 Capital Budget of $89,411,000;
     (b) approving certain capital expenditures related to multi-year projects commencing in 2017; and
     (c) fixing and determining a 2015 rate base of $1,019,082,000.
  Decision:  
 
  1. Newfoundland Power’s proposed construction and purchase of improvements or additions to its property to be completed in 2017, as set out in Schedule A to this Order, are approved.
  2. Newfoundland Power’s proposed multi-year construction and purchase of improvements or additions to its property to begin in 2017, as set out in Schedule B to this Order, are approved.
  3. Newfoundland Power’s 2017 Capital Budget for improvements or additions to its property in an amount of $89,411,000, as set out in Schedule C to this Order, is approved.
  4. Newfoundland Power’s average rate base for the year ending December 31, 2015 is hereby fixed and determined at $1,019,082,000.
  5. Unless otherwise directed by the Board, Newfoundland Power shall file an annual report to the Board on its 2017 capital expenditures by March 1, 2018.
  6. Unless otherwise directed by the Board, Newfoundland Power shall provide, in conjunction with the 2018 Capital Budget Application, a status report on the 2017 capital budget expenditures showing for each project:
    1. the approved budget for 2017;
    2. the expenditures prior to 2017;
    3. the 2017 expenditures to the date of the application;
    4. the remaining projected expenditures for 2017;
    5. the variance between the projected total expenditures and the approved budget; and
    6. an explanation of the variance.
  7. Newfoundland Power shall pay all costs and expenses of the Board incurred in connection with the Application.
  Date Issued:  
  September 12, 2016  
     
     
Newfoundland and Labrador Hydro
  Application  
  Application for approval of the combustor inspection and overhaul of the combustion turbine located in Holyrood pursuant to section 41 of the Act.
  Decision:  
 
  1. The proposed capital expenditure in the amount of $4,738,300 to perform a combustor inspection and overhaul on the combustion turbine located in Holyrood is approved.
  2. Hydro shall pay all expenses of the Board arising from this Application.
  Date Issued:  
  September 23, 2016
     
     
Newfoundland and Labrador Hydro
  Application  
  Application for approval to abandon the 15 MW gas turbine at Holyrood, pursuant to section 38 of the Act.
  Decision:  
 
  1. Pursuant to Section 38 of the Act, the abandonment by Hydro of the 15 MW gas turbine in Holyrood is approved.
  2. Hydro shall pay all costs and expenses of the Board incurred in connection with this Application.
  Date Issued:  
  September 30, 2016
     
     
The Board’s Investigation and Hearing into Supply Issues and Power Outages on the Island Interconnected System
  Matter  
  A claim for an award of costs by Danny Dumaresque.
  Decision:  
 
  1. Mr. Dumaresque is entitled to an award of costs in the amount of $5,000, exclusive of HST.
  2. Hydro shall within 30 days of this Order pay costs in the amount of $5,000, exclusive of HST, to Mr. Dumaresque with recovery of these costs to be addressed in a subsequent Order of the Board.
  Date Issued:  
  October 4, 2016
     
     
Newfoundland and Labrador Hydro Prudence Review
  Matter  
  A claim for an award of costs by Danny Dumaresque.
  Prudence Review:  
 
  1. The request for award of costs is denied.
  Date Issued:  
  October 12, 2016
     
     
Newfoundland Power Inc.
  Application  
  Application filed by Newfoundland Power Inc. for approval of a Contribution in Aid of Construction for a line extension to serve seasonal residential building lots in the Dildo Pond Cottage area, pursuant to section 41 of the Act.
  Decision:  
 
  1. The Contribution in Aid of Construction of fifty four thousand four hundred thirty dollars ($54,430.00), excluding HST, to apply to a seasonal residential development located in the Dildo Pond cottage area, near the community of South Dildo, is approved.
  2. A deviation from the Policy requirement respecting the calculation of the Contribution in Aid of Construction is approved.
  3. Newfoundland Power shall pay all expenses of the Board arising from this Application.
  Date Issued:  
  October 13, 2016
     
     
Newfoundland and Labrador Hydro
  Application  
  Application filed by Newfoundland and Labrador Hydro for an Order pursuant to Section 41 of the Act:
  1. its 2017 capital purchases and construction projects in excess of $50,000;
  2. its 2017 Capital Budget; and
  3. its estimated contributions in aid of construction for 2017.
  Decision:  
 
  1. Hydro’s proposed construction and purchase of improvements or additions to its property in excess of $50,000 to be completed in 2017, as set out in Schedule A to this Order, are approved.
  2. Hydro’s proposed multi-year construction and purchase of improvements or additions to its property in excess of $50,000 to begin in 2017, as set out in Schedule B to this Order, are approved.
  3. Hydro’s proposed contributions in aid of construction for 2017 are approved.
  4. Hydro’s 2017 Capital Budget for improvements or additions to its property in an amount of $271,265,600, as set out in Schedule C to this Order, is approved.
  5. Unless otherwise directed by the Board Hydro shall file, with the 2018 Capital Budget Application, an updated overview in relation to the proposed capital expenditures for the Holyrood Thermal Generating Station.
  6. Unless otherwise directed by the Board Hydro shall file an annual report to the Board on its 2017 capital expenditures by March 1, 2018.
  7. Unless otherwise directed by the Board, Hydro shall provide, in conjunction with the 2018 Capital Budget Application, a status report on the 2017 capital budget expenditures showing for each project:
    1. the approved budget for 2017;
    2. the expenditures prior to 2017;
    3. the 2017 expenditures to the date of the application;
    4. the remaining projected expenditures for 2017;
    5. the variance between the projected total expenditures and the approved budget; and
    6. an explanation of the variance.
  8. Hydro shall pay all costs and expenses of the Board incurred in connection with the Application.
  Date Issued:  
  November 8, 2016
     
     
Newfoundland and Labrador Hydro Prudence Review
  Application  
  Application for approval of costs by the Industrial Customer Group pursuant to Order No. P.U. 24(2016).
  Decision:  
 
  1. The costs of the Industrial Customer Group are fixed at $18,887.75, exclusive of HST.
  2. Hydro shall, within thirty days, pay costs to the Industrial Customer Group in the amount of $18,887.75.
  Date Issued:  
  November 10, 2016
     
     
Newfoundland Power Inc.
  Application  
  Application filed by Newfoundland Power Inc. for approval of a Contribution in Aid of Construction for single-phase service to the Town of Glovertown, pursuant to section 41 of the Act.
  Decision:  
 
  1. The Contribution in Aid of Construction of fifty four thousand four hundred eighty five dollars ($54,485.00), excluding HST, to provide single-phase supply to a water intake facility in the Town of Glovertown is approved.
  2. Newfoundland Power shall pay all expenses of the Board arising from this Application.
  Date Issued:  
  November 24, 2016
     
     
Newfoundland and Labrador Hydro
  Application  
  Application for approval of a capital expenditure to supplement the 2016 Allowance for Unforeseen Items for the construction and purchase of certain improvements and additions to its property pursuant to section 41 of the Act.
  Decision:  
 
  1. The addition of a supplementary amount of $1,000,000 to the 2016 Allowance for Unforeseen Items is approved.
  2. Hydro will establish a separate account to record the variance above the $1,000,000 Allowance for Unforeseen items approved in Order No. P.U. 8(2016) associated with the expenditures related to:
    1. the Bay d’Espoir Access Roads Refurbishment; and
    1. Bay d’Espoir Penstock 1 Refurbishment
      with the recovery of this variance to be addressed in a subsequent order of the Board following a further application by Hydro.
  3. Hydro shall pay all expenses of the Board arising from this Application.
  Date Issued:  
  November 24, 2016
     
     
Newfoundland and Labrador Hydro
  Application  
  Application for a general rate application filed by Newfoundland and Labrador Hydro on July 30, 2013; and an amended general rate application filed by Newfoundland and Labrador Hydro on November 10, 2014.
  Decision:  
 

PRUDENCE REVIEW
1. Hydro’s prudence compliance filing arising from Order No. P.U. 13(2016) is accepted and shall be incorporated in the revised proposals to be filed as a result of this Decision and Order.

SETTLEMENT AGREEMENTS
2. The Settlement Agreement and the Supplemental Settlement Agreement are accepted and shall be incorporated in the revised proposals to be filed as a result of this Decision and Order.

COST OF CAPITAL AND RETURN ON EQUITY
3. The return on equity to be used in calculating the allowed rate of return on rate base for 2014 and 2015 for the purpose of calculating the 2014 and 2015 revenue deficiencies shall be 8.8%.
4. The return on equity to be used in calculating the allowed rate of return on rate base for rate setting purposes, beginning in 2016, shall be 8.5%.
5. Hydro shall, with its next general rate application and no later than June 30, 2017, file a proposal in relation to an adjustment mechanism for its target return on equity, in accordance with the findings of the Board in this Decision and Order.

REVENUE REQUIREMENT
6. Hydro shall file, for approval of the Board, a revised revenue requirement for the 2015 test year for rate setting purposes, incorporating the findings of the Board in this Decision and Order.

RATE BASE AND RETURN ON RATE BASE
7. Hydro shall file, for approval of the Board, a revised 2013 rate base, incorporating the findings of the Board in this Decision and Order.
8. Hydro shall file, for approval of the Board, a revised forecast average rate base for 2014, incorporating the findings of the Board in this Decision and Order.
9. Hydro shall file, for approval of the Board, a revised forecast average rate base and rate of return on rate base for the 2015 test year for rate setting purposes, incorporating the findings of the Board in this Decision and Order.
10. Hydro shall file a revised excess earnings account definition to reflect a range of rate of return on rate base of + 20 basis points.
RECOVERY OF 2014 AND 2015 REVENUE DEFICIENCIES
11. Hydro shall file a revised calculation of the 2014 and 2015 deficiencies setting out revised calculations of the revenue requirement, rate base and rate of return on rate base for each year, and incorporating the findings of the Board in this Decision and Order.
12. Hydro shall file a proposal for the recovery of the 2014 and 2015 revenue deficiencies, and the 2014 additional supply costs deferral, by customer class, incorporating the findings of the Board in this Decision and Order.

COST OF SERVICE
13. Hydro shall file updated test year cost of service studies, incorporating the findings of the Board in this Decision and Order, for 2014 and 2015.

DEFERRAL AND RECOVERY MECHANISMS
14. Hydro shall file revised definitions for the Isolated Systems Supply Cost Variance Deferral Account, the Energy Supply Cost Variance Deferral Account and the Holyrood Conversion Rate Deferral Account, in accordance with the findings of the Board in this Decision and Order.
15. Hydro’s proposal to defer and recover annual customer energy conservation program costs beginning in 2016 is approved, in accordance with the findings of the Board in this Decision and Order.
16. Hydro’s proposal to amortize, over a five-year period beginning in 2015, the costs associated with: a. the Holyrood Black Start diesels, in the amount of $5.2 million; and b. extraordinary transformer and breaker repairs not associated with imprudence is approved.
17. Hydro will be allowed to amortize, over a three-year period beginning in 2015, general rate application costs for 2015 in the amount of $750,000.

RATES, RULES AND REGULATIONS
18. Hydro shall file, for the approval of the Board, a revised Schedule of Rates, Rules and Regulations, and revised RSP Rules, incorporating the findings of the Board in this Decision and Order.
19. Hydro shall file a proposal for the finalization of Industrial customer rates, incorporating the findings of the Board in this Decision and Order.

OTHER MATTERS
20. Hydro shall file on or before March 31, 2017 a proposal in relation to annual reporting of intercompany activity, starting in 2017, in accordance with the findings of the Board in this Decision and Order.
21. Hydro shall file a report by January 13, 2017 in relation to its Account Management Framework, in accordance with the findings of the Board in this Decision and Order.
22. Hydro shall file with its next general rate application a report in relation to its Customer Service Strategic Roadmap, in accordance with the findings of the Board in this Decision and Order.
23. Hydro shall file a report with its next general rate application in relation to the identification of the rural subsidy on customers’ bills, in accordance with the findings of the Board in this Decision and Order.
24. Hydro shall file its next general rate application no later than March 31, 2017 for rates based on a 2018 test year.

HEARING COSTS
25. Hydro shall pay the expenses of the Board associated with this matter, including the expenses of the Consumer Advocate incurred by the Board pursuant to section 117 of the Act.
26. Leave is granted to the intervenors to apply for an award of costs within 30 days of the Order of the Board establishing final rates in this matter.

  Date Issued:  
  December 1, 2016
     
     
Newfoundland Power Inc
  Application  
  Application filed by Newfoundland Power Inc. for approval of a Contribution in Aid of Construction for three-phase service to the Western Regional Service Board, pursuant to section 41 of the Act.
  Decision:  
 
  1. The Contribution in Aid of Construction of seventy nine thousand two hundred eighteen dollars ($79,218.00), excluding HST, to provide three-phase service to the Western Regional Service Board’s waste management facility near the Town of St. George’s is approved.
  2. Newfoundland Power shall pay all expenses of the Board arising from this Application.
  Date Issued:  
  December 14, 2016
     
     
Newfoundland Power Inc
  Application  
 

Application by
Newfoundland Power Inc. for approval of:
(i)            revised distribution line costs per metre for Contributions in Aid of Construction (CIACs);
(ii)           revised distribution plant upgrade cost for CIACs; and
(iii)          CIAC cost factors.

  Decision:  
 
  1. The revised cost factors in Schedules A, B, C and D attached to this Order are approved to be used in the calculation of all CIACs with effect from January 1, 2017, and, where advantageous to the customer, on all CIACs quoted but unpaid as of January 1, 2017.
  2. Newfoundland Power shall submit a revised CIAC Policy incorporating the revisions approved herein.
  3. Newfoundland Power shall pay the expenses of the Board arising from this Application.
  Date Issued:  
  December 15, 2016
     
     
Newfoundland and Labrador Hydro
  Application  
 

Application filed by Newfoundland and Labrador Hydro for approval of Rules and Regulations to reflect changes to Newfoundland Power’s Contribution in Aid of Construction policy pursuant to section 71.

  Decision:  
 
  1. The Rules and Regulations as set out in Appendix A are approved effective July 1, 2016.
  2. Hydro shall pay all expenses of the Board arising from this Application.
  Date Issued:  
  December 16, 2016
     
     
Newfoundland and Labrador Hydro
  Application  
  Application filed by Newfoundland and Labrador Hydro for approval for approval to issue debentures pursuant to section 91 of the Act.
  Decision:  
 
  1. Hydro’s proposal to issue debentures in an amount of up to $550,000,000 to refinance a short term promissory note totaling $225,000,000, to retire outstanding short-term debt and to issue the rate stabilization plan refund is approved subject to the following conditions:
    1. The debentures shall be issued on or before February 28, 2017.
    2. Hydro shall file with the Board a report specifying the terms and conditions of the bond issue within five (5) days after closing, setting out the following:
      1. date of issue;
      2. term;
      3. maturity date;
      4. principal amount;
      5. interest rate;
      6. particulars of sinking fund, if any;
      7. price to public and to the underwriters;
      8. yield to the public;
      9. underwriting fee;
      10. actual cost (i.e. yield) to Hydro; and
      11. any other material terms or conditions.
      12. Hydro shall file with the Board a copy of the Underwriting Agreement relating to the debentures within five (5) days after closing.
      13. Hydro shall file with the Board a copy of the Order in Council providing approval to issue the debentures within five (5) days of receipt of the Order in Council.
      14. Hydro shall file with the Board a report on the disposition of the proceeds no later than six months from the date of the closing.
  2. Hydro shall pay all expenses of the Board arising from this Application.
  Date Issued:  
  December 20, 2016
     
     
Newfoundland and Labrador Hydro
  Application  
  Application filed by Newfoundland and Labrador Hydro for approval of revisions to the Rate Stabilization Plan rules.
  Decision:  
 
  1. The proposed revisions to the Rate Stabilization Plan rules are accepted to be effective with the implementation of new rates arising from Hydro’s general rate application.
  2. Hydro shall include the proposed revisions in the revised Rate Stabilization Plan rules to be filed in accordance with Order No. P.U. 49(2016).
  3. Hydro shall pay all expenses of the Board arising from this Application.
  Date Issued:  
  December 21, 2016
     
     
Newfoundland and Labrador Hydro
  Application  
  Application filed by Newfoundland and Labrador Hydro for approval of a Capacity Assistance Agreement with Praxair Canada Inc. pursuant to sections 70, 71 and 80 of the Act.
  Decision:  
 
  1. The proposed Capacity Assistance Agreement with Praxair Canada Inc., effective December 1, 2016, is approved.
  2. Hydro shall file with the Board, no later than April 15 of the year following each winter period December 1 - March 31 while the agreement is in place, a report setting out the dates, times, duration and system conditions, including generation available and calculation of system reserve, under which capacity assistance was requested, the capacity assistance requested and provided, and the capacity and variable payments made.
  3. Hydro shall pay all expenses of the Board arising from this Application.
  Date Issued:  
  December 21, 2016
     
     
     
     
Newfoundland and Labrador Hydro
  Application  
  An amended general rate application filed by Newfoundland and Labrador Hydro on November 10, 2014 and Board Order No. P.U. 49(2016); and an application filed by Newfoundland and Labrador Hydro for approval of a cost deferral account for 2016.
  Decision:  
 
  1. Hydro’s proposed 2016 cost deferral account, as set out in Schedule A, in the amount of $38.8 million is approved.
  2. Hydro shall pay the expenses of the Board arising from this Application.
  Date Issued:  
  December 22, 2016
     
     
     
     
     

Newfoundland and Labrador Hydro                                                                     P.U. 1 (2015)

Application:

Application for approval of a general rate application filed by Newfoundland and Labrador Hydro on July 30, 2013; and an amended general rate application filed by Newfoundland and Labrador Hydro on November 10, 2014; and an application filed by Innu Nation for interim costs in the Newfoundland and Labrador Hydro general rate proceeding.

Decision:

1.          Innu Nation is entitled to an award of costs for costs incurred up to June 30, 2014.

2.          Hydro shall within thirty days pay costs in the amount of $132,525.64 to Innu Nation.

Date Issued:

January 9, 2015

 

 

 

Newfoundland and Labrador Hydro                                                                     P.U. 2 (2015)

Application:

Application for approval of a general rate application filed by Newfoundland and Labrador Hydro on July 30, 2013; and an amended general rate application filed by Newfoundland and Labrador Hydro on November 10, 2014; and an intervenor submission filed by the Nunatsiavut Government on January 9, 2015.

Decision:

1.          The Nunatsiavut Government is hereby granted intervenor status in this proceeding.

Date Issued:

January 16, 2015

 

 

 

Newfoundland and Labrador Hydro                                                                     P.U. 3 (2015)

Application:

Application by Newfoundland and Labrador Hydro for approval of revisions, on an interim basis, to the utility rate charged to Newfoundland Power Inc. pursuant to sections 70 and 71 of the Act for an award of costs to the Industrial Customer Group pursuant to Order No. P.U. 47(2014).

Decision:

1.          The costs of the Industrial Customer Group are fixed at $9,708.80, exclusive of HST.

2.          Hydro shall, within thirty days, pay costs to the Industrial Customer Group in the amount of $9,708.80.

Date Issued:

February 5, 2015

 

 

 

Newfoundland and Labrador Hydro                                                                     P.U. 4 (2015)

Application:

  An application by Newfoundland and Labrador Hydro for an order approving: a) its capital purchases and construction projects in excess of $50,000 beginning in 2015; b) its 2015 Capital Budget; and c) its estimated contributions in aid of construction for 2015 in the amount of $300,000; and for an award of costs by the Industrial Customer Group pursuant to Order No. P.U. 50(2014).

Decision:

1.          The costs of the Industrial Customer Group are fixed at $10,970.80, exclusive of HST.

2.          Hydro shall, within thirty days, pay costs to the Industrial Customer Group in the amount of $10,970.80.

Date Issued:

February 6, 2015

 

 

 

The Board’s Investigation and Hearing into Supply Issues
and Power Outages on the Island Interconnected System                                    
P.U. 5 (2015)

Application:

                    Motion by Grand Riverkeeper Labrador, Inc. for an Order directing Newfoundland and Labrador Hydro to provide full and complete responses to certain Requests for Information.

Decision:

1.          The motion of Grand Riverkeeper Labrador, Inc. for an Order requiring Hydro to provide full and complete responses to GRK-NLH-21, 24 and 63 is hereby denied.

2.          The motion of Grand Riverkeeper Labrador, Inc. for an Order requiring Hydro to provide full and complete responses to GRK-NLH-45, 46, 57, 60, 66, 69, and 74 is hereby approved.

Date Issued:

February 17, 2015

 

 

 

Newfoundland and Labrador Hydro                                                                     P.U. 6 (2015)

Application:

  Application by Newfoundland and Labrador Hydro for approval of revisions, on an interim basis, to the utility rate charged to Newfoundland Power Inc. pursuant to sections 70 and 71 of the Act for an award of costs to Vale Newfoundland & Labrador Limited pursuant to Order No. P.U.47(2014).

Decision:

1.          The costs of Vale are fixed at $7,480.67, exclusive of HST.

2.          Hydro shall, within thirty days, pay costs to Vale in the amount of $7,480.67.

Date Issued:

March 3, 2015

 

 

 

Newfoundland and Labrador Hydro                                                                     P.U. 7 (2015)

Application:

      Application by Newfoundland and Labrador Hydro for approval, among other things, to establish a deferral account and transfer $45.9 million to this account, with recovery in 2014 from the Rate Stabilization Plan for an award of costs to Vale Newfoundland & Labrador Limited pursuant to Order No. P.U. 58(2014).

Decision:

1.          The costs of Vale are fixed at $5,905.50, exclusive of HST.

2.          Hydro shall, within thirty days, pay costs to Vale in the amount of $5,905.50.

Date Issued:

March 4, 2015

 

 

 

Newfoundland Power Inc.                                                                                      P.U. 8 (2015)

Application:

     Application by Newfoundland Power Inc. for an Order of the Board providing for disposition of the balance in the Demand Management Incentive Account pursuant to Sections 58 and 80 of the Act.

Decision:

1.          The disposition of the 2014 balance in the Demand Management Incentive Account and related income tax effects by means of a credit in the amount of $627,503 to the Rate Stabilization Account as of March 31, 2015 is approved.

2.          Newfoundland Power shall pay all costs and expenses of the Board arising from this Application.

Date Issued:

March 6, 2015

 

 

 

Newfoundland Power Inc.                                                                                      P.U. 9 (2015)

Application:

Application by Newfoundland Power Inc. for approval of:

(i)                 revised distribution line costs per metre for Contributions in Aid of Construction (CIACs);

(ii)         revised distribution plant upgrade cost for CIACs; and

(ii)               CIAC cost factors.

Decision:

1.          The revised cost factors in Schedules A, B, C and D attached to this Order are approved to be used in the calculation of all CIACs with effect from March 25, 2015, and, where advantageous to customers of Newfoundland Power, on all CIACs quoted but unpaid as of March 25, 2015.

2.          Newfoundland Power shall submit a revised CIAC Policy in its entirety incorporating the revisions approved herein.

3.     Newfoundland Power shall pay the expenses of the Board arising from this Application.

Date Issued:

March 18, 2015

 

 

 

Newfoundland Power Inc.                                                                                    P.U. 10 (2015)

Application:

An application by Newfoundland Power Inc. for an Order of the Board providing for disposition of the balance in the Optional Seasonal Rate Revenue and Cost Recovery Account pursuant to Sections 58 and 80 of the Act.

Decision:

1.          The disposition of the balance in the Optional Seasonal Rate Revenue and Cost Recovery Account as of December 31, 2014 by charging the balance of $96,270 to the Rate Stabilization Account as of March 31, 2015 is approved.

2.          Newfoundland Power shall pay all costs and expenses of the Board in connection with this Application.

Date Issued:

April 2, 2015

 

 

 

Newfoundland Power Inc.                                                                                    P.U. 11 (2015)

Application:

An application by Newfoundland Power Inc. for an Order of the Board approving the balance in the Weather Normalization Reserve as of December 31, 2014 pursuant to sections 69(3) and 78 of the Act.

Decision:

1.          Newfoundland Power’s Weather Normalization Reserve of a positive balance of $1,640,357 as of December 31, 2014 is approved.

2.          Newfoundland Power shall pay all costs and expenses of the Board in connection with this Application.

Date Issued:

April 2, 2015

 

 

 

Newfoundland Power Inc.                                                                                    P.U. 12 (2015)

Application:

An application by Newfoundland Power Inc. for approval to issue Series AO First Mortgage Bonds pursuant to section 91 of the Act.

Decision:

1.          Newfoundland Power’s proposal to issue Series AO First Mortgage Bonds in an amount of up to $100,000,000 is approved subject to the following conditions:

 

(A)  The bonds shall be issued on or before December 31, 2015.

 

(B)   Newfoundland Power shall file with the Board a report specifying the terms and conditions of the bond issue within five (5) days after closing, setting out the following:

 

(i)        date of issue;

(ii)      term;

(iii)    maturity date;

(iv)     principal amount;

(v)       coupon rate;

(vi)     particulars of sinking fund, if any;

(vii)   price to public and to the underwriters;

(viii) yield to the public;

(ix)     underwriting fee;

(x)       actual cost (i.e. yield) to Newfoundland Power; and

(xi)     any other material terms or conditions not contemplated at the date of the Application but forming part of the negotiated terms and conditions.

 

(C)   Newfoundland Power shall file with the Board a copy of the Underwriting Agreement relating to the bond issue within five (5) days after closing.

 

(D)  Newfoundland Power shall file with the Board a report on the disposition of the proceeds no later than six months from the date of the bond issue.

 

2.          Newfoundland Power shall pay all expenses of the Board arising from this Application.

Date Issued:

April 16, 2015

 

 

 

Newfoundland Power Inc.                                                                                    P.U. 13 (2015)

Application:

An application by Newfoundland Power Inc. for an order directing Newfoundland and Labrador Hydro to provide full and adequate responses to three requests for information, including the disclosure and production of documents, report and records in the matter of an investigation and hearing into supply issues and power outages on the Island Interconnected system.

Decision:

1.          The application of Newfoundland Power Inc. for a further response to NP-NLH-004 is hereby denied.

2.          Hydro shall provide responses to NP-NLH-005 and NP-NLH-018 in accordance with the findings of the Board in this decision and Order.

Date Issued:

May 8, 2015

 

 

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 14 (2015)

Application:

Application by Newfoundland and Labrador Hydro for approval of customer electricity rates for 2015 on an interim basis.

Decision:

1.          The Interim Rate Application is denied.

2.          Newfoundland and Labrador Hydro shall file a revised Schedule of Rates, Tolls and Charges and RSP Rules, effective July 1, 2015, with evidence showing the impacts on consumers and Hydro, incorporating the findings of the Board in this Order, including:

i)           an interim base rate increase of 8.0% for Newfoundland Power Inc.;

ii)         an interim base rate increase for Government Diesel customers of 50% of the proposed increases; and

iii)       in relation to Island Industrial customers:

a)             an interim base rate increase of 10.0%;

b)            an interim RSP rate adjustment which will result in an effective 2.7% rate increase for all Island Industrial customers;

c)             a transfer from the IC RSP Surplus to fund the difference between the approved 10.0% base rate increase and the effective 2.7% increase; and

d)            a transfer from the IC RSP Surplus to fund the full amount of the 2014 year-end IC RSP current balance.

3.          The Industrial Customer Group and Vale Newfoundland and Labrador Limited are entitled to an award of costs in an amount to be fixed by the Board upon the filing of a detailed cost submission within 30 days of this Order.

4.          Leave is granted to the remaining Intervenors to apply for an award of costs setting out a detailed claim within 30 days of this Order.

5.          Newfoundland and Labrador Hydro shall pay all the expenses of the Board arising from the Interim Rate Application.

Date Issued:

May 8, 2015

 

 

 

Newfoundland Power Inc.                                                                                    P.U. 15 (2015)

Application:

An application by Newfoundland Power Inc. for deferred cost recovery for 2016, Board Order No. P.U. 13(2013) and Newfoundland Power Inc’s next general rate application.

Decision:

1.          Newfoundland Power shall, unless otherwise directed by the Board, file its next general rate application with a 2016 test year on or before October 16, 2015.

2.          Newfoundland Power shall pay all expenses of the Board arising from this Order.

Date Issued:

May 26, 2015

 

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 16 (2015)

Application:

Application for approval of a general rate application filed by Newfoundland and Labrador Hydro on July 30, 2013; and an amended general rate application filed by Newfoundland and Labrador Hydro on November 10, 2014; and an application by Newfoundland and Labrador Hydro for the approval of, among other things, customer electricity rates for 2015 on an interim basis; and an application for costs by Vale Newfoundland & Labrador Limited pursuant to Order No. P.U. 14(2015).

Decision:

1.          The costs of Vale are fixed at $14,396.50, exclusive of HST.

2.          Hydro shall, within thirty days, pay costs to Vale in the amount of $14,396.50.

Date Issued:

June 17, 2015

 

 

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 17 (2015)

Application:

Application for approval of a general rate application filed by Newfoundland and Labrador Hydro on July 30, 2013; and an amended general rate application filed by Newfoundland and Labrador Hydro on November 10, 2014; and an application by Newfoundland and Labrador Hydro for approval of (i) customer rates, tolls and charges reflecting the determinations set out in Order No. P.U. 14(2015) and (ii) a revised Rate Stabilization Plan adjustment to apply to the Utility Rate for the period July 1, 2015 to June 30, 2016.

Decision:

1.          The rates to be charged by Hydro to Newfoundland Power as set out in Schedule “A” to this Order, to be effective for electrical consumption on or after July 1, 2015, are approved on an interim basis.

2.          The rates to be charged by Hydro to Government Diesel customers, as set out in Schedule “B” to this Order, to be effective for electrical consumption on or after July 1, 2015, are approved on an interim basis.

3.                Hydro shall file a revised Schedule of Rates, Tolls and Charges and RSP Rules, effective July 1, 2015, to reflect for Island Industrial customers:

i)     an interim base rate increase of 10.0%;

ii)    interim RSP rate adjustments which will result in an effective 2.7% base rate increase for each Island Industrial customer, including Teck Resources Limited;

iii)   a transfer from the IC RSP Surplus to fund the difference between the approved 10.0% base rate increase and the effective 2.7% base rate increase; and

iv)    a transfer from the IC RSP Surplus to fund the full amount of the 2014 year-end IC RSP current balance.

4.          The Industrial Customer Group is entitled to an award of costs in an amount to be fixed by the Board upon the filing of a detailed cost submission within 30 days of this Order.

5.          Leave is granted to the other intervenors to apply within 30 days of this Order including a detailed cost submission for an award of costs.

6.          Newfoundland and Labrador Hydro shall pay all the expenses of the Board arising from the Application.

Date Issued:

June 23, 2015

 

 

 

Newfoundland Power Inc.                                                                                    P.U. 18 (2015)

Application:

Application pursuant to Sections 70 and 75 of the Act for: i) approval of revised rate stabilization and municipal tax adjustments for the period July 1, 2015 to June 30, 2016; (ii) approval of a revised Schedule of Rates, Tolls and Charges to reflect the revised rate stabilization and municipal tax adjustments and to permit recovery of additional purchase power costs associated with an interim increase in the base rate charged by Newfoundland and Labrador Hydro to Newfoundland Power Inc. approved in Order No. P.U. 17(2015); and (iii) approval of a revised Rate Stabilization Clause to provide for a true-up for any over or under recovery of purchase power costs associated with the base rate increase.

Decision:

1.          The Rate Stabilization Adjustment of (0.105) cents per kWh for the period July 1, 2015 to June 30, 2016 is approved.

2.          The Municipal Tax Adjustment Factor of 1.02487 for the period July 1, 2015 to June 30, 2016 is approved.

3.          The Schedule of Rates, Tolls and Charges, as set out in Schedule A to this Order, to be effective on all electrical consumption on and after July 1, 2015, is approved.

4.          The Rate Stabilization Clause, as set out in Schedule B to this Order, to be effective July 1, 2015, is approved.

5.          Newfoundland Power shall pay the expenses of the Board arising from this Application.

Date Issued:

June 25, 2015

 

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 19 (2015)

Application:

Application for approval of a change in rates to be charged to its Island Interconnected and Isolated Rural customers.

Decision:

1.          The rates proposed by Hydro to be effective for all electrical consumption on or after July 1, 2015 for its Island Interconnected customers (rate Classes 1.1, 1.1S, 2.1, 2.3, 2.4 and 4.1), excluding Burgeo School & Library, and Isolated Rural customers (rate Classes 1.2D, 1.2DS, 2.1D, 2.2D and 4.1D), as set out in Schedule A to this Order, are approved on an interim basis.

2.          Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

June 25, 2015

 

 

 

Teck Resources Limited                                                                                       P.U. 20 (2015)

Application:

Application for approval of an amendment to the rules and regulations relating to service provided by Newfoundland and Labrador Hydro.

Decision:

3.          The Application to amend the Service Agreement between Teck Resources Limited and Newfoundland and Labrador Hydro is denied.

Date Issued:

June 30, 2015

 

 

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 21 (2015) - Amended Schedule

Application:

Application for approval of a general rate application filed by Newfoundland and Labrador Hydro on July 30, 2013; and an amended general rate application filed by Newfoundland and Labrador Hydro on November 10, 2014; and an application by Newfoundland and Labrador Hydro for approval of industrial customer rates, tolls and charges and RSP rules reflecting the determinations set out in Order No. P.U. 17(2015).

Decision:

1.          The Schedule of Rates, Tolls and Charges to be effective on all electrical consumption for Island Industrial customers on and after July 1, 2015, as set out in Schedule A to this Order, are approved on an interim basis.

2.          The Rate Stabilization Plan Rules, as set out in Schedule B to this Order, are approved on an interim basis.

3.          Hydro shall file, for approval, revisions to the Rate Stabilization Plan Rules to clearly provide for the transfer from the Industrial Customer RSP Surplus to fund the difference between the approved 10.0 % base rate increase and the effective 2.7% base rate increase for Island Industrial customers.

4.          Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

July 8, 2015

 

 

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 22 (2015)

Application:

Application for approval of a general rate application filed by Newfoundland and Labrador Hydro on July 30, 2013; and an amended general rate application filed by Newfoundland and Labrador Hydro on November 10, 2014;and

an application by Newfoundland and Labrador Hydro for the approval of, among other things, customer electricity rates for 2015 on an interim basis; and an application for costs by the Industrial Customer Group pursuant to Order No. P.U. 14(2015).

Decision:

1.          The costs of the Industrial Customer Group are fixed at $13,520.70, exclusive of HST.

2.          Hydro shall, within thirty days, pay costs to the Industrial Customer Group in the amount of $13,520.70.

Date Issued:

July 9, 2015

 

 

 

 

Newfoundland Power Inc.                                                                                    P.U. 23 (2015)

Application:

Application for approval to delay the filing of its next general rate application and for deferred cost recovery of $3,991,000 for 2016.

Decision:

1.          The Application is denied.

2.          Newfoundland Power shall pay all expenses of the Board arising from this Application.

Date Issued:

July 15, 2015

 

 

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 24 (2015)

Application:

Application for approval of capital expenditures to proceed with the purchase of critical spares, pursuant to section 41 of the Act.

Decision:

1.          The capital expenditure in the amount of $1,536,300 to purchase critical spares for the Hydro’s Generating Stations is approved.

2.          Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

July 29, 2015

 

 

 

 

Newfoundland Power Inc.                                                                                    P.U. 25 (2015)

Application:

Application for approval of a Contribution in Aid of Construction for three-phase service for the Town of Grand Falls-Windsor, pursuant to section 41of the Act.

Decision:

1.          The Contribution in Aid of Construction of sixty two thousand nine hundred and twenty-three dollars ($62,923.00), excluding HST, to construct a three-phase line extension for the Town of Grand Falls-Windsor is approved.

2.          Newfoundland Power shall pay all expenses of the Board arising from this Application.

Date Issued:

July 29, 2015

 

 

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 26 (2015)

Application:

Application for approval of a contribution in aid of construction for a three-phase line extension to serve RJS Management Services Ltd. in the community of St. Lewis, pursuant to section 41 of the Act.

Decision:

1.          The Contribution in Aid of Construction of forty-eight thousand, eight hundred and seventeen dollars and sixty-five cents ($48,817.65), excluding HST, for the supply of three-phase electrical service to RJS Management Services Ltd. in the community of St. Lewis is approved.

2.          Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

July 29, 2015




Newfoundland and Labrador Hydro                                                                   P.U. 27 (2015)

Application:

Application for approval to replace the Rectifier Transformers on Units 1 and 2 at the Holyrood Thermal Generating Station pursuant to Section 41 of the Act.

Decision:

1.          proposed capital expenditure of $756,200 to replace the rectifier transformers on Units 1 and 2 at the Holyrood Thermal Generating Station is approved.

2.          Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

September 8, 2015




Newfoundland Power                                                                                          P.U. 28 (2015)

Application:

Application for an Order pursuant to Sections 41 and 78 of the Act: (a) approving its 2016 Capital Budget of $107,028,000; (b) approving purchase and construction of improvements or additions to its property in 2016 and 2017; and (c) fixing and determining its average rate base for 2014 in the amount of $964,930,000.

Decision:

1.          Newfoundland Power’s proposed construction and purchase of improvements or additions to its property to be completed in 2016, as set out in Schedule A to this Order, are approved.

2.          Newfoundland Power’s 2016 Capital Budget for improvements or additions to its property in an amount of $107,028,000, as set out in Schedule C to this Order, is approved.

3.          Newfoundland Power’s proposed multi-year construction and purchase of improvements or additions to its property to begin in 2016, as set out in Schedule B to this Order, are approved.

4.          Newfoundland Power’s average rate base for the year ending December 31, 2014 is hereby fixed and determined at $964,930,000.

5.          Unless otherwise directed by the Board, Newfoundland Power shall file an annual report to the Board on its 2016 capital expenditures by March 1, 2017.

6.          Unless otherwise directed by the Board, Newfoundland Power shall provide, in conjunction with the 2017 Capital Budget Application, a status report on the 2016 capital budget expenditures showing for each project:
(i) the approved budget for 2016;
(ii) the expenditures prior to 2016;
(iii) the 2016 expenditures to the date of the application;
(iv) the remaining projected expenditures for 2016;
(v) the variance between the projected total expenditures and the approved budget;
(vi) an explanation of the variance.

7.          Newfoundland Power shall pay all costs and expenses of the Board incurred in connection with the Application.

Date Issued:

September 8, 2015




Newfoundland and Labrador Hydro                                                                   P.U. 29 (2015)

Application:

Application for approval to refurbish the Hardwoods gas turbine engine serial number 202224 pursuant to Section 41 of the Act.

Decision:

1.          The proposed capital expenditure of $1,249,300 to refurbish the Hardwoods gas turbine engine serial number 202224 is approved.

2.          Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

October 1, 2015




Newfoundland Power                                                                                            P.U. 30 (2015)

Application:

an application by Newfoundland Power Inc. for approval of a Contribution in Aid of Construction for a line extension to serve Domestic Customers in the cottage area known as Butts Pond West, near Gambo, pursuant to section 41 of the Act.

Decision:

1.          The Refundable Contribution in Aid of Construction of seven thousand five hundred fifty four dollars and sixty six cents ($7,554.66), excluding HST, to apply to Domestic Customers located in Butts Pond West Cottage Area is approved.

2.          Newfoundland Power shall pay all expenses of the Board arising from this Application.

Date Issued:

October 27, 2015




Newfoundland and Labrador Hydro                                                                   P.U. 31 (2015)

Application:

an application by Newfoundland and Labrador Hydro for approval to complete an internal assessment and repairs of transformer VBN T1 at the Voisey's Bay Nickel Terminal Station, pursuant to Section 41 of the Act.

Decision:

1.          The proposed capital expenditure of $500,100 for the internal assessment and repair of transformer VBN TI at the Voisey's Bay Nickel Terminal Station is approved.

2.          Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

November 17, 2015




Newfoundland Power                                                                                          P.U. 32 (2015)

Application:

Application for a general rate application to establish customer electricity rates effective July 1, 2016.

Decision:

1.          The Intervenors in the Application are as set out in Schedule “A” to this Order.

2.          The Schedule of Dates for the Application is approved as set out in Schedule “B” to this Order.

3.          The Rules of Procedure for the Application are approved as set out in Schedule “C” to this Order.

Date Issued:

November 30, 2015




Newfoundland and Labrador Hydro                                                                   P.U. 33 (2015)

Application:

Application for an Order pursuant to Section 41 of the Act approving:
   (a) its 2016 capital purchases and construction projects in excess of $50,000;
   (b) its 2016 Capital Budget; and
   (c) its estimated contributions in aid of construction for 2016

Decision:

1.          Hydro’s proposed construction and purchase of improvements or additions to its property in excess of $50,000 to be completed in 2016, as set out in Schedule A to this Order, are approved.

2.          Hydro’s proposed multi-year construction and purchase of improvements or additions to its property in excess of $50,000 to begin in 2016, as set out in Schedule B to this Order, are approved

3.          Hydro’s proposed contributions in aid of construction for 2016 are approved.

4.          Hydro’s proposed 2016 Capital Budget for improvements or additions to its property in an amount of $183,082,800, as set out in Schedule C to this Order, is approved.

5.          Unless otherwise directed by the Board Hydro shall file, with the 2017 Capital Budget Application, an updated overview in relation to the proposed capital expenditures for the Holyrood Thermal Generating Station

6.          Unless otherwise directed by the Board Hydro shall file, in conjunction with the 2017 Capital Budget Application, a status report on the 2016 capital expenditures.

7.          Unless otherwise directed by the Board Hydro shall file an annual report with the Board in relation to its 2016 capital expenditures by March 1, 2017.

8.          Unless otherwise directed by the Board Hydro shall file, with the 2017 Capital Budget Application, a report on the construction of the TL 267 Project, addressing the work progress, the expenditure and budget status, and an explanation for any deviation from the project scope and budget.

9.          Hydro shall pay all costs and expenses of the Board incurred in connection with the Application.

Date Issued:

December 2, 2015




Newfoundland and Labrador Hydro                                                                   P.U. 34 (2015)

Application:

Application for approval of a capital expenditure to supplement the Allowance for Unforeseen Items for the construction and purchase of certain improvements and additions to its property pursuant to section 41 of the Act.

Decision:

1.          The addition of a supplementary amount of $250,000 to the 2015 Allowance for Unforeseen Items is approved.

2.          Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

December 2, 2015




Newfoundland and Labrador Hydro                                                                   P.U. 35 (2015)

Application:

Application for approval of a general rate application filed by Newfoundland and Labrador Hydro on July 30, 2013; and an amended general rate application filed by Newfoundland and Labrador Hydro on November 10, 2014; and an application filed by Newfoundland and Labrador Hydro for approval of interim Island Industrial customer rates, tolls and charges and Rate Stabilization Plan rules, effective January 1, 2016.

Decision:

1.          The Schedule of Rates, Tolls and Charges to be effective on all electrical consumption for Island Industrial customers on and after January 1, 2016, as set out in Schedule A to this Order, is approved on an interim basis.

2.          The Rate Stabilization Plan Rules, as set out in Schedule B to this Order, are approved on an interim basis.

3.          Vale Newfoundland and Labrador Limited is entitled to an award of costs in an amount to be fixed by the Board upon the filing of a detailed cost submission within 30 days of this Order.

4.          Leave is granted to the other intervenors to apply for an award of costs setting out a detailed cost submission within 30 days of this Order.

5.          Hydro shall pay all the expenses of the Board arising from the Application.

Date Issued:

December 8, 2015




Newfoundland and Labrador Hydro                                                                   P.U. 36 (2015)

Application:

Application for approval amended general rate application filed by Newfoundland and Labrador Hydro on November 10, 2014, and an amended application by Newfoundland and Labrador Hydro for approval, among other things, to establish a deferral account to reduce Hydro’s forecast net income deficiency for 2015.

Decision:

1.          The Board accepts the Settlement Agreement proposals in relation to the 2015 accounting treatment for: i) actuarial gains and losses in Employee Future Benefits; ii) depreciation and accretion expenses associated with Asset Retirement Obligations; and, iii) annual customer energy conservation program costs.

2.          The creation of a deferral account in relation to Newfoundland and Labrador Hydro’s proposed 2015 revenue requirement, as set out in Schedule A, is approved.

3.          3. That segregation of $30.2 million, as of December 31, 2015, in the deferral account is approved with a final determination on recovery of this amount to be determined by the Board in a future order.

4.          Vale is entitled to an award of costs in an amount to be determined by the Board upon the filing of a detailed cost submission within 30 days of the date of this Order.

5.          Leave is granted to the other intervenors to apply for an award of costs, setting out a detailed cost submission, within 30 days of this Order.

6.          Newfoundland and Labrador Hydro shall pay the expenses of the Board arising from this Application.

Date Issued:

December 22, 2015


Newfoundland and Labrador Hydro                                                                     P.U. 1 (2014)

Application:

Application for approval of the Rate Stabilization Plan rules and components of the rates to be charged to Island Industrial customers pursuant to section 71 of the Act for an award of costs to Vale Newfoundland Limited pursuant to Order No. P.U. 29(2013).

Decision:

1.          The costs of Vale Newfoundland and Labrador Limited are fixed at $60,451.63.

2.          Hydro shall, within thirty days, pay costs to Vale Newfoundland and Labrador Limited in the amount of $60,451.63.

Date Issued:

January 21, 2014

 

 

 

 

Newfoundland and Labrador Hydro                                                                     P.U. 2 (2014)

Application:

Application for approval of an amendment to the terms and conditions under which Newfoundland and Labrador Hydro supplies electricity to North Atlantic Refining Limited pursuant to Section 71 of the Act.

Decision:

1.         Revisions to Newfoundland and Labrador Hydro’s service agreement with North Atlantic Refining Limited to add a provision to limit Hydro’s liability, as set out in the attached Schedule A, are approved.

2.       Newfoundland and Labrador Hydro shall pay all expenses of the Board arising from this Application

Date Issued:

February 3, 2014

 

 

 

 

An Investigation and Hearing into supply issues and
power outages on the Island Interconnected system                                            
P.U. 3 (2014)

Decision:

1.         The issues to be addressed in the proceeding are established as set out in Schedule “A” to this Order, which may be amended by letter of the Board.

2.         The process is established as set out in Schedule “B” to this Order, which may be amended by letter of the Board.

3.         The intervenors in this proceeding are as set out in Schedule “C” to this Order.

4.         The Rules of Procedure for the proceeding are as set out in Schedule “D” to this Order.

Date Issued:

February 19, 2014

 

 

 

 

Newfoundland and Labrador Hydro                                                                     P.U. 4 (2014)

Application:

Application for approval to treat costs associated with repairs to the fuel oil system at the Holyrood Thermal Generating Station as an extraordinary expense pursuant to sections 69, 78 and 80 of the Act.

Decision:

1.         Hydro’s proposal to treat the 2013 costs of repairs to the fuel oil system at the Holyrood Thermal Generating Station as a major extraordinary repair such that the costs are amortized over a five-year period with the unamortized balance to be included in rate base is not approved.

2.         Hydro shall expense the 2013 costs of the repairs to the fuel oil system at the Holyrood Thermal Generating Station in 2013.

3.         Hydro shall file a report with the Board no later than May 30, 2014 setting out the actions taken and future plans in relation to the quality of fuel supplied to the Holyrood Thermal Generating Station.

4.         Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

February 26, 2014

 

 

 

 

Newfoundland and Labrador Hydro                                                                     P.U. 5 (2014)

Application:

  An application by Newfoundland and Labrador Hydro for an order: a) approving its 2014 capital budget; b) approving its 2014 capital purchases and construction projects in excess of $50,000; c) approving the estimated contributions in aid of construction for 2014; and d) fixing and determining its average rate base for 2012 for an award of costs to Vale Newfoundland and Labrador Limited pursuant to Order No. P.U. 42(2013).

Decision:

1.         The costs of Vale Newfoundland and Labrador Limited are fixed at $27,402.93.

2.         Hydro shall, within thirty days, pay costs to Vale Newfoundland and Labrador Limited in the amount of $27,402.93.

Date Issued:

March 13, 2014

 

 

 

Newfoundland and Labrador Hydro                                                                     P.U. 6 (2014)

Application:

An application by Newfoundland and Labrador Hydro for an order: a) approving its 2014 capital budget; b) approving its 2014 capital purchases and construction projects in excess of $50,000; c) approving the estimated contributions in aid of construction for 2014; and d) fixing and determining its average rate base for 2012 for an award of costs to Island Industrial Customer Group to Order No. P.U. 42(2013).

Decision:

1.       The costs of the Island Industrial Customer Group are fixed at $16,938.51.

2.       Hydro shall, within thirty days, pay costs to the Island Industrial Customer Group in the amount of $16,938.51.

Date Issued:

March 13, 2014

 

 

Newfoundland Power Inc.                                                                                      P.U. 7 (2014)

Application:

Application by Newfoundland Power Inc. for an Order of the Board providing for disposition of the balance in the Demand Management Incentive Account pursuant to Sections 58 and 80 of the Act.

Decision:

1.       The Board approves, pursuant to Sections 58 and 80 of the Act, the recovery of the 2013 balance in the Demand Management Incentive Account and related income tax effects by means of a debit in the amount of $383,085 to the Rate Stabilization Account as of March 31, 2014.

2.       Newfoundland Power shall pay all costs and expenses of the Board arising from this Application.

Date Issued:

March 20, 2014

 

 

Newfoundland Power Inc.                                                                                      P.U. 8 (2014)

Application:

Application by Newfoundland Power Inc. for approval of:

(i)                 revised distribution line costs per metre for Contributions in Aid of Construction (CIACs);

(ii)               revised distribution plant upgrade cost for CIACs; and

(iii)             CIAC cost factors.

Decision:

1.                   The revised cost factors contained in Schedules A, B, C and D attached to this Order are approved to be used in the calculation of all CIACs with effect from April 2, 2014, and, where advantageous to customers of Newfoundland Power, on all CIACs quoted but unpaid as of April 2, 2014.

2.                   Newfoundland Power shall submit a revised CIAC Policy in its entirety incorporating the revisions approved herein.

3.                   Newfoundland Power shall pay the expenses of the Board arising from this Application.

Date Issued:

March 26, 2014

 

 

Newfoundland and Labrador Hydro                                                                     P.U. 9 (2014)

Application:

An application by Newfoundland and Labrador Hydro for approval of amendments to the Rate Stabilization Plan rules and a refund to Newfoundland Power Inc. customers and certain Hydro Rural customers.

Decision:

1.              The Newfoundland Power Rate Stabilization Plan Surplus shall be refunded to all ratepayers, with the exception of the Island Industrial customers, in the form of direct payment or rebate and in a manner to be approved by the Board.

2.              Hydro shall pay the expenses of the Board incurred with this matter.

Date Issued:

April 9, 2014

 

 

 

Newfoundland Power Inc.                                                                                    P.U. 10 (2014)

Application:

Application by Newfoundland Power Inc. for an Order of the Board providing for disposition of the balance in the Optional Seasonal Rate Revenue and Cost Recovery Account pursuant to Sections 58 and 80 of the Act.

Decision:

1.              The Board approves the disposition of the balance in the Optional Seasonal Rate Revenue and Cost Recovery Account as of December 31, 2013 by charging the balance of $137,344 to the Rate Stabilization Account as of March 31, 2014.

2.              Newfoundland Power shall pay all costs and expenses of the Board in connection with this Application.

Date Issued:

April 9, 2014

 

 

 

 

Newfoundland Power Inc.                                                                                    P.U. 11 (2014)

Application:

Application by Newfoundland Power Inc. for approval of: an Order of the Board for approval of the balance in the Weather Normalization Reserve as of December 31, 2013 pursuant to sections 69(3) and 78 of the Act.

Decision:

1.              Newfoundland Power’s Weather Normalization Reserve of a positive balance of $5,058,185 as of December 31, 2013 is approved.

2.                   Newfoundland Power shall pay all costs and expenses of the Board in connection with this Application.

Date Issued:

April 9, 2014

 

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 12 (2014)

Application:

Application for approval of the Rate Stabilization Plan rules and components of the rates to be charged to Island Industrial customers pursuant to section 71 of the Act for an award of costs to Island Industrial Customer Group pursuant to Order No. P.U. 29(2013).

Decision:

1.              The costs of the Island Industrial Customer Group are fixed at $92,586.81.

2.              Hydro shall, within thirty days, pay costs to the Island Industrial Customer Group in the amount of $92,856.81.

Date Issued:

April 16, 2014

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 13 (2014)

Application:

Application by Newfoundland and Labrador Hydro for approval on an interim basis, effective January 1, 2014 of, among other things, rate changes for certain customers and a deferral account for others, and amendments to the Rate Stabilization Plan.

Decision:

1.              The Amended Interim Rate Application is hereby dismissed.

2.              Vale Newfoundland and Labrador Limited are entitled to an award of costs in an amount to be fixed by the Board, with cost submissions to be filed within 30 days of this Order.

3.              Leave is granted to the remaining Intervenors to apply within 30 days of this Order for an award of costs.

4.              Newfoundland and Labrador Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

April 25, 2014

 

 

 

Newfoundland Power Inc.                                                                                    P.U. 14 (2014)

Application:

Application by Newfoundland Power Inc. for approval of a capital expenditure to proceed with the construction and purchase of improvements and additions to its property pursuant to section 41(3) of the Act.

Decision:

1.              The capital expenditure of $2,892,000 for the proposed distribution feeder improvements and substation refurbishment is approved.

2.              Newfoundland Power shall pay all expenses of the Board arising from this Application.

Date Issued:

April 28, 2014

 

 

The Board’s Investigation and Hearing into Supply Issues
and Power Outages on the Island Interconnected System                                   P.U. 15 (2014)

Application:

Request by Grand Riverkeeper Labrador, Inc. for intervenor status in the matter of an Investigation and Hearing into supply issues and power outages on the Island Interconnected system.

Decision:

1.              Grand Riverkeeper Labrador, Inc. is hereby granted intervenor status in this proceeding.

Date Issued:

April 30, 2014

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 16 (2014)

Application:

Application by Newfoundland and Labrador Hydro for approval of a capital project to supply and install 100 MW of combustion turbine generation, pursuant to section 41 of the Act.

Decision:

1.              Hydro’s proposal to proceed with the purchase and installation of 100 MW of combustion turbine generation at the Holyrood Thermal Generating Station is approved, with the issues of costs and cost recovery to be determined by the Board in a future Order.

2.              Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

May 7, 2014

 

 

Newfoundland Power Inc.                                                                                    P.U. 17 (2014)

Application:

Application by Newfoundland Power Inc. for approval of a Contribution in Aid of Construction for a line extension to serve Domestic Customers in the cottage area known as Holiday Hills, near the community of Blaketown pursuant to section 41 of the Act.

Decision:

1.                   The Refundable Contribution in Aid of Construction of six thousand eight hundred ninety six dollars and seventy five cents ($6,896.75), excluding HST, to apply to Domestic Customers located in the cottage area known as Holiday Hills is approved.

2.             Newfoundland Power shall pay all expenses of the Board arising from this Application.

Date Issued:

June 6, 2014

 

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 18 (2014)

Application:

Application by Newfoundland and Labrador Hydro for approval of  an amendment to the Rate Stabilization Plan Rules.

Decision:

1.                  The Rate Stabilization Plan rules attached hereto as Schedule “A” are approved on an interim basis.

2.             Hydro shall pay the expenses of the Board incurred in connection with this matter.

                          Date Issued:

June 11, 2014

 

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 19 (2014)

Application:

Application by Newfoundland and Labrador Hydro for approval, pursuant to Section 70 of the Act, of the Rate Stabilization Plan Adjustment in the rates to be charged to Newfoundland Power Inc.

Decision:

1.             The rates to be charged by Hydro to Newfoundland Power, as set out in Schedule “A” to this Order, to be effective for electrical consumption on or after July 1, 2014, are approved on an interim basis.

2.             Hydro shall pay the expenses of the Board incurred in connection with this matter.

                          Date Issued:

June 11, 2014

 

 

 

Newfoundland Power Inc.                                                                                    P.U. 20 (2014)

Application:

Application by Newfoundland Power Inc. for approval of: (1) a Contribution in Aid of Construction for a line extension to serve Domestic Customers in the cottage area known as Baie de L’Eau Road, near the town of Bay L’Argent pursuant to section 41 of the Act; and (2) a deviation from the Contribution in Aid of Construction applicable to Domestic Customers in relation to the calculation of the participation percentage as provided for in clause 6 (A)(II) of the policy.

Decision:

1.                         The Non-Refundable Contribution in Aid of Construction of six thousand nine hundred thirty-one dollars and sixty-four cents ($6,931.64), excluding HST, to apply to Domestic Customers located in the Cottage Area known as Baie De L’Eau Road is approved.

2.                A deviation from the Policy requirement respecting down payments to allow Newfoundland Power to commence construction of the Extension is approved.

3.                Newfoundland Power shall pay all expenses of the Board arising from this Application.

                          Date Issued:

June 19, 2014

 

 

 

 

Newfoundland Power Inc.                                                                                    P.U. 21 (2014)

Application:

Application by Newfoundland Power Inc. pursuant to Section 70 of the Act for approval of rate stabilization and municipal tax adjustments for the period July 1, 2014 to June 30, 2015 and a schedule of rates, tolls and charges incorporating the rate stabilization and municipal tax adjustments.

Decision:

1.             The Rate Stabilization Adjustment of 1.064 cents/kWh for the period July 1, 2014 to June 30, 2015, is approved.

2.             The Municipal Tax Adjustment Factor of 1.02370 for the period July 1, 2014 to June 30, 2015, is approved.

3.             Newfoundland Power’s Schedule of Rates, Tolls and Charges, as set out in Schedule A to this Order, to be effective on all electrical consumption on and after July 1, 2014, is approved.

4.             Newfoundland Power shall pay the expenses of the Board in connection with this Application.

                          Date Issued:

June 19, 2014

 

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 22 (2014)

Application:

Application by Newfoundland and Labrador Hydro for approval of a change in rates to be charged to Island Interconnected and Isolated Rural customers.

Decision:

1.             The rates proposed by Hydro to be effective for all electrical consumption on or after July 1, 2014 for its Island Interconnected customers, excluding Burgeo School & Library (rate Classes 1.1, 2.1, 2.3, 2.4 and 4.1) and Isolated Rural customers (rate Classes 1.2D, 2.1D and 2.2D and 4.1D), as set out in Schedule A to this Order, are approved.

2.             Hydro shall pay all expenses of the Board arising from this Application.

                          Date Issued:

June 26, 2014

 

 

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 23 (2014)

Application:

Application by Newfoundland and Labrador Hydro for approval of a capital expenditure to supplement the Allowance for Unforeseen Items for the construction and purchase of certain improvements and additions to its property pursuant to section 41 of the Act.

Decision:

1.             The addition of a supplementary amount of $580,000 to the 2014 Allowance for Unforeseen Items is approved.

2.             Hydro will establish a separate account to record the expenditures associated with the Unit 3 east forced draft fan motor refurbishment at the Holyrood Thermal Generating Station, the overhaul of the Sunnyside B1L03 230 kV breaker and the overhaul of the Holyrood B1L17 230 kV breaker, with the recovery of these expenditures to be addressed in a subsequent order of the Board following a further application by Hydro.

3.             Hydro shall pay all expenses of the Board arising from this Application.

                          Date Issued:

June 27, 2014

 

 

 

 

Newfoundland Power Inc.                                                                                    P.U. 24 (2014)

Application:

Application by Newfoundland Power Inc. for approval of a capital expenditure to proceed with refurbishment of thermal generation assets, pursuant to section 41 of the Act.

Decision:

1.             The capital expenditure of $1,698,000 for the refurbishment of the Wesleyville and Greenhill gas turbine systems is approved.

2.             Newfoundland Power shall pay all expenses of the Board arising from this Application.

                          Date Issued:

July 11, 2014

 

 

 

Newfoundland Power Inc.                                                                                    P.U. 25 (2014)

Application:

Application by Newfoundland Power Inc. for approval of a Contribution in Aid of Construction for a line extension to serve domestic customers residing in the cottage area known as Witless Bay Line West near the Town of Holyrood pursuant to section 41 of the Act.

Decision:

1.             The Refundable Contribution in Aid of Construction of twenty-six thousand three hundred thirty-seven dollars and fifty cents ($26,337.50), excluding HST, to apply to Domestic Customers located in the Cottage Area known as Witless Bay Line West is approved.

2.             Newfoundland Power shall pay all expenses of the Board arising from this Application.

                          Date Issued:

July 11, 2014

 

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 26 (2014)

Application:                                          

Application by Newfoundland and Labrador Hydro for approval of a Contribution in Aid of Construction from Cooke Aquaculture Inc. for the upgrade of a distribution line from single-phase to three-phase service in Daniel’s Harbour pursuant to section 41 of the Act.

Decision:

1.             The Contribution in Aid of Construction of three hundred and twenty-nine thousand, eight hundred six dollars and seventy-two cents ($329,806.72), excluding HST, to provide three-phase service to the Cooke Aquaculture Inc. Kelly Cove Salmon Fish Hatchery in Daniel’s Harbour is approved.

2.             Hydro shall pay all expenses of the Board arising from this Application.

                          Date Issued:

July 11, 2014

 

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 27 (2014)

Application:                                          

Application by Newfoundland and Labrador Hydro’s applications for an order of the Board fixing and determining its:

(a)    2011 average rate base; and

(b)    2012 average rate base.

Decision:

1.             Pursuant to Section 78 of the Act Newfoundland and Labrador Hydro’s rate base for the year ending December 31, 2011 is hereby fixed and determined at $1,492,777,250.

2.             Pursuant to Section 78 of the Act Newfoundland and Labrador Hydro’s rate base for the year ending December 31, 2012 is hereby fixed and determined at $1,524,482,500.

                          Date Issued:

July 18, 2014

 

 

 

Newfoundland Power Inc.                                                                                    P.U. 28 (2014)

Application:                                          

Application by Newfoundland Power Inc. for approval of a Contribution in Aid of Construction for a line extension to serve domestic customers residing in the cottage area near the community of Winterbrook pursuant to section 41 of the Act.

Decision:

1.             The Refundable Contribution in Aid of Construction of twenty-five thousand five hundred twenty-three dollars and thirteen cents ($25,523.13), excluding HST, to apply to Domestic Customers located in the cottage area near the community of Winterbrook is approved.

2.             Newfoundland Power shall pay all expenses of the Board.

                          Date Issued:

July 23, 2014

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 29 (2014)

Application:                                          

Application by Newfoundland and Labrador Hydro’s applications for approval, pursuant to section 41 of the Act, of capital expenditures at the Sunnyside Terminal Station in 2014 and 2015 for the purchase and installation of the Sunnyside T1 transformer and associated equipment, modifications to the protection relay system, and the addition of a 230 kV breaker.

Decision:

1.             The proposed capital expenditures at the Sunnyside Terminal Station in the amount of $7,197,800 in 2014 and $1,266,400 in 2015 for the purchase and installation of the Sunnyside T1 transformer and associated equipment, modification to the protection relay system and addition of a 230 kV breaker are approved.

2.             Hydro will establish a separate account to record the capital expenditures for the purchase and installation of the Sunnyside T1 transformer and associated equipment, modification to the protection relay system and addition of a 230 kV breaker, with the recovery of these expenditures to be addressed in a subsequent order of the Board following a further application by Hydro.

3.             Hydro shall pay all expenses of the Board arising from this Application.

                          Date Issued:

July 30, 2014

 

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 30 (2014)

Application:                                          

Application by Newfoundland and Labrador Hydro for approval on an interim basis, effective January 1, 2014 of, among other things, rate changes for certain customers and a deferral account for others, and amendments to the Rate Stabilization Plan for an award of costs to Vale Newfoundland and Labrador Limited pursuant to Order No. P.U. 13(2014).

Decision:

1.             The costs of Vale are fixed at $51,461.32, exclusive of HST.

2.             Hydro shall, within thirty days, pay costs to Vale in the amount of $51,461.32.

                          Date Issued:

July 31, 2014

 

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 31 (2014)

Application:                                          

Application by Newfoundland and Labrador Hydro for approval on an interim basis,

effective January 1, 2014 of, among other things, rate changes for certain customers and a deferral account for others, and amendments to the Rate Stabilization Plan for an award of costs by the Industrial Customers Group pursuant to Order No. P.U. 13(2014).

Decision:

1.             The costs of the Industrial Customers Group are fixed at $37,450.95, exclusive of HST.

2.             Hydro shall, within thirty days, pay costs to the Industrial Customers Group in the amount of $37,450.95.

                          Date Issued:

July 31, 2014

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 32 (2014)

Application:                                          

Application by Newfoundland and Labrador Hydro for approval of capital expenditures for the replacement of the tap changer on transformer T5 at the Western Avalon Terminal Station pursuant to section 41of the Act.

Decision:

1.             The proposed capital expenditure in the amount of $1,452,500 to replace the T5 transformer on load tap changer at the Western Avalon Terminal Station is approved.

2.             Hydro will establish a separate account to record the capital expenditure to replace the T5 transformer on load tap changer at the Western Avalon Terminal Station, with the recovery of the expenditure to be addressed in a subsequent order of the Board following a further application by Hydro.

3.             Hydro shall pay all expenses of the Board arising from this Application.

                          Date Issued:

August 1, 2014

 

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 33 (2014)

Application:                                          

Application by Newfoundland and Labrador Hydro for approval of capital expenditures for the replacement of insulators on transmission lines TL-201 and TL-203 pursuant to section 41of the Act.

Decision:

1.             The proposed capital expenditure of $3,632,200 for the replacement of all insulators on transmission line TL-201 and 30 insulators on transmission line TL-203 is approved.

2.             Hydro shall pay all expenses of the Board arising from this Application.

                          Date Issued:

August 1, 2014

 

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 34 (2014)

Application:                                          

Application by Newfoundland and Labrador Hydro for approval of capital expenditures for the replacement of the excitation transformers at Bay d’Espoir pursuant to section 41of the Act.

Decision:

1.             The capital expenditures in the amount of $636,700 for 2014 and $360,000 for 2015 for the replacement of the excitation transformers at the Bay d’Espoir generating station are approved.

2.             Hydro shall pay all expenses of the Board arising from this Application.

                          Date Issued:

August 1, 2014

 

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 35 (2014)

Application:                                          

Application by Newfoundland and Labrador Hydro for approval to issue debentures pursuant to section 91 of the Act.

Decision:

1.             Hydro’s proposal to issue debentures in an amount of up to $200,000,000 to finance 2014 capital expenditures is approved subject to the following conditions:

(a)          The debentures shall be issued on or before October 31, 2014.

(b)          Hydro  shall file with the Board a report specifying the terms and conditions of the bond issue within five (5) days after closing, setting out the following:

(i)                    date of issue;

(ii)                  term;

(iii)                maturity date;

(iv)                 principal amount;

(v)                   interest rate;

(vi)                 particulars of sinking fund, if any;

(vii)               price to public and to the underwriters;

(viii)             yield to the public;

(ix)                 underwriting fee;

(x)                   actual cost (i.e. yield) to Hydro; and

(xi)                 any other material terms or conditions.

(C)         Hydro shall file with the Board a copy of the Underwriting Agreement relating to the debentures within five (5) days after closing.

(D)        Hydro shall file with the Board a copy of the Order in Council providing approval to issue the debentures within five (5) days of receipt of the Order in Council.

(E)         Hydro shall file with the Board a report on the disposition of the proceeds no later than six months from the date of the closing.

2.             Hydro shall pay all expenses of the Board arising from this Application.

                          Date Issued:

August 8, 2014

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 36 (2014)

Application:                                          

Application by Newfoundland and Labrador Hydro for approval of 2014 capital expenditures for the installation of additional transformer capacity at the Wabush Substation pursuant to section 41of the Act.

Decision:

1.             The proposed 2014 capital expenditure of $958,800 to install additional transformer capacity at the Wabush Substation by relocating the transformer from the Quartzite Substation and to make associated modifications to the Wabush Substation is approved.

2.             Hydro shall file its long-term plan for the Wabush system no later than August 31, 2015.

3.             Hydro shall pay all expenses of the Board arising from this Application.

                          Date Issued:

August 12, 2014

 

 

Newfoundland Power Inc.                                                                                    P.U. 37 (2014)

Application:                                          

Application by Newfoundland Power Inc. for approval of a Contribution in Aid of Construction for a line extension to serve domestic customers residing in the cottage area known as Joe’s Lake, near the town of Badger pursuant to section 41 of the Act.

Decision:

1.             The Non-Refundable Contribution in Aid of Construction of four thousand one hundred fifty-nine dollars and sixty-three cents ($4,159.63), excluding HST, to apply to Domestic Customers located in the cottage area known as Joe’s Lake, near the Town of Badger is approved.

2.             Newfoundland Power shall pay all expenses of the Board arising from this Application.

                          Date Issued:

August 22, 2014

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 38 (2014)

Application:                                          

Application by Newfoundland and Labrador Hydro for approval of capital expenditures for replacement of an air compressor at the Holyrood Thermal Generation

Station pursuant to section 41of the Act.

Decision:

1.             The proposed 2014 capital expenditure of $320,600 for the approval to replace an Air Compressor at the Holyrood Thermal Generating Station is approved.

2.             Hydro shall pay all expenses of the Board arising from this Application.

                          Date Issued:

September 9, 2014

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 39 (2014)

Application:                                          

An application by Newfoundland and Labrador Hydro, dated May 12, 2014, for approval of, on an interim basis: i) the transfer of $29.4 million to be recognized as revenue; and, ii) changes to Island Industrial customer rates and rules.

Decision:

1.             The Application is denied.

2.             Newfoundland and Labrador Hydro shall pay all expenses of the Board arising from this Application.

                          Date Issued:

September 17, 2014

 

 

Newfoundland Power Inc.                                                                                    P.U. 40 (2014)

Application:                                          

Application by Newfoundland Power Inc. for for an Order pursuant to Sections 41 and 78 of the Act:

(a)    approving its 2015 Capital Budget of $94,211,000;

(b)    multi-year projects involving future capital expenditures of $19,804,000; and

(c)    fixing and determining its average rate base for 2013 in the amount of $915,820,000.

Decision:

1.             Newfoundland Power’s proposed construction and purchase of improvements or additions to its property to be completed in 2015, as set out in Schedule A to this Order, are approved.

2.             Newfoundland Power’s proposed multi-year construction and purchase of improvements or additions to its property to begin in 2015, as set out in Schedule B to this Order, are approved.

3.             Newfoundland Power’s 2015 Capital Budget for improvements or additions to its property in an amount of $94,211,000, as set out in Schedule C to this Order, is approved.

4.             Newfoundland Power’s average rate base for the year ending December 31, 2013 is hereby fixed and determined at $915,820,000.

5.             Unless otherwise directed by the Board, Newfoundland Power shall file an annual report to the Board on its 2015 capital expenditures by March 1, 2016.

6.             Unless otherwise directed by the Board, Newfoundland Power shall provide, in conjunction with the 2016 Capital Budget Application, a status report on the 2015 capital budget expenditures showing for each project:

(i)           the approved budget for 2015;

(ii)         the expenditures prior to 2015;

(iii)       the 2015 expenditures to the date of the application;

(iv)        the remaining projected expenditures for 2015;

(v)          the variance between the projected total expenditures and the approved budget; and

(vi)        an explanation of the variance.

7.             Newfoundland Power shall pay all costs and expenses of the Board incurred in connection with the Application.

                          Date Issued:

October 9, 2014

 

 

The Board’s Investigation and Hearing into Supply Issues

and Power Outages on the Island Interconnected System                                   P.U. 41 (2014)

Application:                                          

A Notice of Motion by Newfoundland and Labrador Hydro for a determination that certain Requests for Information filed by Mr. Danny Dumaresque and Grand RiverKeeper Labrador, Inc. are not relevant. in the matter of an investigation and hearing into supply issues and power outages on the Island Interconnected system

Decision:

1.             Hydro’s motion with respect to the following Requests for Information is accepted:


DD-NLH-1 to 9, DD-NLH-12 to 15, DD-NLH-17 to 23, DD-NLH-28, DD-NLH-42, DD-NLH-44, DD-NLH-45, DD-NLH-48, DD-NLH-49, DD-NLH-50, DD-NLH-54, DD-NLH-57, DD-NLH-59, DD-NLH-61 to 64, DD-NLH-69, DD-NLH-71, DD-NLH-72, DD-NLH-74 to 84, DD-NLH-86 to 90

 

GRK-NLH-8, GRK-NLH-10 to 20, GRK-NLH-23, GRK-NLH-28, GRK-NLH-29, GRK-NLH-42, GRK-NLH-47 to 50, GRK-NLH-53, GRK-NLH-54, GRK-NLH-56

 

2.             Hydro motion with respect to the following Requests for Information is denied:

 

DD-NLH-10, DD-NLH-11, DD-NLH-16, DD-NLH-52, DD-NLH-56, DD-NLH-58, DD-NLH-70, DD-NLH-73

 

GRK-NLH-21, GRK-NLH-22, GRK-NLH-24 to 26, GRK-NLH-43 to 46, GRK-NLH-55, GRK-NLH-57

 

3.             Hydro shall pay the expenses of the Board associated with this matter.

                          Date Issued:

October 16, 2014

 

 

 

Newfoundland Power Inc.                                                                                    P.U. 42 (2014)

Application:                                          

Application by Newfoundland Power Inc. for approval of a Contribution in Aid of Construction for single phase service for Bell Mobility Inc. pursuant to section 41 of the Act.

Decision:

1.             The Contribution in Aid of Construction of sixty-seven thousand two hundred seven dollars ($67,207.00), excluding HST, to provide single-phase service to a cell phone tower for Bell Mobility Inc. is approved.

2.             Newfoundland Power shall pay all expenses of the Board arising from this Application.

                          Date Issued:

October 20, 2014

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 43 (2014)

Application:                                          

An application by Newfoundland and Labrador Hydro for the deferred recovery of 2014 costs associated with its energy conservation plan.

Decision:

1.             The deferred recovery of the 2014 costs related to Hydro’s energy conservation plan, estimated to be $2.52 million, is approved.

2.             Hydro shall pay all expenses of the Board arising from this Application.

                          Date Issued:

October 31, 2014

 

 

Newfoundland Power Inc.                                                                                    P.U. 44 (2014)

Application:                                          

Application by Newfoundland Power Inc. for approval of a Contribution in Aid of Construction for a line extension to serve Domestic Customers in the cottage area known as Tom Penney’s Pond, near Salmonier Line, pursuant to section 41 of the Act.

Decision:

1.             The Refundable Contribution in Aid of Construction of four thousand and twenty two dollars ($4,022.00), excluding HST, to apply to Domestic Customers located in the cottage area known as Tom Penney’s Pond, near Salmonier Line is approved.

2.             Newfoundland Power shall pay all expenses of the Board arising from this Application.

                          Date Issued:

November 18, 2014

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 45 (2014)

Application:                                          

An application by Newfoundland and Labrador Hydro for approval of additional capital expenditures to complete the Labrador City Voltage Upgrade pursuant to section 41 of the Act.

Decision:

1.             The additional capital expenditures in the amount of $608,900 for 2014 and $1,238,200 for 2015 to complete the Labrador City Voltage Conversion are approved.

2.             Hydro shall pay all expenses of the Board arising from this Application.

                          Date Issued:

November 20, 2014

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 46 (2014)

Application:                                          

An application by Newfoundland and Labrador Hydro for approval to purchase critical spares for the Holyrood Thermal Generating Station pursuant to section 41 of the Act.

Decision:

1.             The proposed 2014 capital expenditure in the amount of $491,753 to purchase critical spares for the Holyrood Thermal Generating Station is approved.

2.             Hydro shall pay all expenses of the Board arising from this Application.

                          Date Issued:

November 27, 2014

 

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 47 (2014)

Application:                                          

An application by Newfoundland and Labrador Hydro for approval of revisions, on an interim basis, to the Utility rate charged to Newfoundland Power Inc. pursuant to sections 70 and 71 of the Act.

Decision:

1.             Hydro’s proposal to revise its Utility rate, on an interim basis, to include a revised calculation of billing demand to reflect a curtailable credit is approved for the period December 1, 2014 to March 31, 2015.

2.             Hydro shall within 7 days file revised Utility rate sheets in accordance with the findings of the Board.

3.             Vale Newfoundland and Labrador Limited is entitled to an award of costs in an amount to be fixed by the Board, with cost submissions to be filed within 30 days of this Order.

4.             Leave is granted to the Industrial Customer Group to apply within 30 days of this Order for an award of costs.

5.             Hydro shall pay all expenses of the Board arising from this Application.

                          Date Issued:

November 27, 2014

 

 

 

Newfoundland Power Inc.                                                                                    P.U. 48 (2014)

Application:                                          

Application by Newfoundland Power Inc. for approval of a Contribution in Aid of Construction. for a line extension to serve domestic customers in the cottage area known as Square Pond East, near the Town of Gambo  pursuant to section 41 of the Act.

Decision:

1.             The Non-Refundable Contribution in Aid of Construction of four thousand three hundred and fifty dollars and seventy-five cents ($4,350.75), excluding HST, to apply to Domestic Customers located in the cottage area known as Square Pond East, near the Town of Gambo, is approved.

2.             Newfoundland Power shall pay all expenses of the Board arising from this Application.

                          Date Issued:

November 28, 2014

 

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 49 (2014)

Application:                                          

An application by Newfoundland and Labrador Hydro for approval of a Capacity Assistance Agreement with Corner Brook Pulp and Paper Limited pursuant to sections 70, 71 and 80 of the Act.

Decision:

1.                The proposed Capacity Assistance Agreement with Corner Brook Pulp and Paper Limited, effective December 1, 2014, is approved.

2.                Hydro will establish a separate account to record the purchased power expenses, with the recovery of the expenditure to be addressed in Hydro’s General Rate Application.

3.                Hydro shall file with the Board, no later than April 15 of the year following each winter period December 1-March 31 while the agreement is in place, a report setting out the dates, times, duration and system conditions, including generation available and calculation of system reserve, under which capacity assistance was requested, the capacity assistance requested and provided, and the capacity and variable payments made.

4.                Hydro shall pay all expenses of the Board arising from this Application.

                          Date Issued:

November 28, 2014

 

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 50 (2014)

Application:                                          

An application by Newfoundland and Labrador Hydro for an Order pursuant to Section 41 of the Act approving:

(a)    its capital purchases and construction projects in excess of $50,000 beginning in 2015;

(b)    its 2015 Capital Budget; and

(c)    its estimated contributions in aid of construction for 2015 in the amount of $300,000.

Decision:

1.             Hydro’s proposed construction and purchase of improvements or additions to its property in excess of $50,000 to be completed in 2015, as set out in Schedule A to this Order, are approved.

2.             Hydro’s proposed multi-year construction and purchase of improvements or additions to its property in excess of $50,000 to begin in 2015, as set out in Schedule B to this Order, are approved.

3.             Hydro’s proposed contributions in aid of construction for 2015 are approved.

4.             Hydro’s proposed 2015 Capital Budget for improvements or additions to its property in an amount of $76,832,900, as set out in Schedule C to this Order, is approved.

5.             Unless otherwise directed by the Board Hydro shall file, in conjunction with the 2016 Capital Budget Application, an updated overview in relation to the proposed capital expenditures for the Holyrood Thermal Generating Station.

6.             Unless otherwise directed Hydro shall file, in conjunction with the 2016 Capital Budget Application, a status report on the 2015 capital expenditures.

7.             Unless otherwise directed by the Board Hydro shall file an annual report with the Board in relation to its 2015 capital expenditures by March 1, 2016.

8.             The Industrial Customer Group is entitled to an award of costs in an amount to be fixed by the Board, with a cost submission to be filed by the Industrial Customer Group within 30 days of this Order.

9.             Hydro shall pay all costs and expenses of the Board incurred in connection with the Application.

                          Date Issued:

December 2, 2014

 

 

 

Newfoundland Power Inc.                                                                                    P.U. 51 (2014)

Application:                                          

Application by Newfoundland Power Inc. for approval of its 2015 forecast average rate base and rate of return on rate base in accordance with Order No. P.U. 13(2013).

Decision:

1.             Newfoundland Power’s forecast average rate base for 2015 of $1,009,527,000 is approved.

2.             Newfoundland Power’s rate of return on rate base for 2015 of 7.50% in a range of 7.32% to 7.68% is approved.

3.             Newfoundland Power shall pay the expenses of the Board in connection with this Application.

                          Date Issued:

December 2, 2014

 

 

 

Newfoundland Power Inc.                                                                                    P.U. 52 (2014)

Application:                                          

Application by Newfoundland Power Inc. for approval of a Contribution in Aid of Construction for approval of a contribution in aid of construction for single phase service for the Town of Wabana pursuant to section 41 of the Act.

Decision:

1.             The Contribution in Aid of Construction of fifty-three thousand forty-eight dollars and twenty-five cents ($53,048.25), excluding HST, to provide single-phase service to water pumps for the Town of Wabana is approved

2.             Newfoundland Power shall pay all expenses of the Board arising from this Application.

                          Date Issued:

December 8, 2014

 

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 53 (2014)

Application:                                          

An application by Newfoundland and Labrador Hydro for for approval to proceed with the construction of a 230kV transmission line between the Bay d’Espoir and Western Avalon Terminal Station pursuant  to section 41 of the Act.

Decision:

1.             The capital expenditures of $2,412,600 in 2014, $18,964,700 in 2015, $77,225,600 in 2016, $110,064,100 in 2017 and $82,991,000 in 2018 for the construction of the 230 kV transmission line between the Bay d’Espoir and Western Avalon terminal stations are approved.

2.             Hydro will file, with each capital budget application filed until the completion of the project, a report on the construction of the 230 kV transmission line addressing the work progress, the expenditure and budget status, and an explanation for any deviations from the project scope and budget.

3.             Hydro shall pay all expenses of the Board arising from this Application.

                          Date Issued:

December 12, 2014

 

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 54 (2014)

Application:                                          

An application by Newfoundland and Labrador Hydro for an application by Newfoundland for approval of, on an interim basis: i) the transfer of $29.4 million to be recognized as revenue; and, ii) changes to Island Industrial customer rates and rules for an award of costs to Vale Newfoundland and Labrador Limited.

Decision:

1.             Vale Newfoundland and Labrador Limited is entitled to an award of costs in the amount of $29,809.45.

2.             Hydro shall, within thirty days, pay costs to Vale Newfoundland and Labrador Limited in the amount of $29,809.45.

                          Date Issued:

December 16, 2014

 

 

 

 

Newfoundland Power Inc.                                                                                    P.U. 55 (2014)

Application:                                          

Application by Newfoundland Power Inc. for approval of a Contribution in Aid of Construction for a line extension to serve Domestic Customers in the cottage area known as Blue Jay Lane, near Brigus Junction, pursuant to section 41 of the Act.

Decision:

1.             The Refundable Contribution in Aid of Construction of two thousand eight hundred and sixty-seven dollars and fifty-two cents ($2,867.52), excluding HST, to apply to Domestic Customers located in the cottage area known as Blue Jay Lane, near Brigus Junction is approved.

2.             Newfoundland Power shall pay all expenses of the Board arising from this Application.

                          Date Issued:

December 19, 2014

 

 

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 56 (2014)

Application:                                          

An application by Newfoundland and Labrador Hydro for approval of the deferral and recovery of expenses associated with increased capacity-related supply costs on the Island Interconnected system in 2014 pursuant to sections 78 and 80 of the Act.

Decision:

1.             The creation of a deferral account for the additional capacity-related supply costs of $9,650,000 incurred in the first quarter 2014 as set out in Schedule A is approved, with the recovery of these expenditures to be addressed in a subsequent Order of the Board following a further application by Hydro.

2.             Hydro shall pay all expenses of the Board arising from this Application.

                          Date Issued:

December 24, 2014

 

 

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 57 (2014)

Application:                                          

An application by Newfoundland and Labrador Hydro approval of a proposed interim transmission demand rate for Labrador industrial customers.

Decision:

1.             The rates to be charged by Newfoundland and Labrador Hydro to Labrador industrial customers as set out in Schedule A to be effective for electrical consumption on or after January 1, 2015, are approved on an interim basis.

2.             Hydro shall pay all expenses of the Board arising from this Application.

                          Date Issued:

December 24, 2014

 

 

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 58 (2014)

Application:                                          

An application by Newfoundland and Labrador Hydro for approval of, among other things, to establish a deferral account and transfer $45.9 million to this account, with recovery in 2014 from the Rate Stabilization Plan.

Decision:

1.             The creation of a deferral account in relation to Newfoundland and Labrador Hydro’s proposed 2014 revenue requirement, as set out in Schedule A, is approved.

2.             The segregation of $45.9 million as of December 31, 2014 in the deferral account is approved, but recovery by Hydro of this amount, partial or full, is not approved.

3.             The proposed 2014 Test Year cost of service study is not approved.

4.             The proposed use of the credit balance in the RSP Hydraulic Variation Account balance to provide recovery is not approved.

5.             The proposed transfer from the RSP Hydraulic Variation Account to the deferral account is not approved.

6.             The Industrial Customer Group and Vale are entitled to an award of costs in an amount to be determined by the Board with costs submissions to be filed within 30 days of this Order.

7.             Hydro shall pay all expenses of the Board arising from this Application.

                          Date Issued:

December 24, 2014


Newfoundland and Labrador Hydro                                                                     P.U. 1 (2013)

Application:

Application for approval of the capital expenditure of $284,100 to refurbish stop logs at Burnt Dam Spillway.

Decision:

1.          The proposed capital expenditure of $284,100 for the refurbishment of the stop logs at the Burnt Dam Spillway is approved.

2.          Hydro shall pay all expenses of the Board arising from this application.

Date Issued:

January 21, 2013

 

 

Newfoundland and Labrador Hydro                                                                     P.U. 2 (2013)

Application – Phase I:

Application for by Newfoundland and Labrador Hydro for an order: (a) approving its 2013 capital budget; (b) approving its 2013 capital purchases and construction projects in excess of $50,000; (c) approving the estimated contributions in aid of construction for 2013; and (d) fixing and determining its average rate base for 2011.

Decision:

1.          Hydro’s proposed construction and purchase of improvements or additions to its property in excess of $50,000 to be completed in 2013 are approved as set out in Schedule A to this Order.

2.          Hydro’s proposed multi-year construction and purchase of improvements or additions to its property in excess of $50,000 to begin in 2013 are approved as set out in Schedule B to this Order.

3.          Hydro shall pay all costs and expenses of the Board incurred in connection with the Application.

Date Issued:

January 23, 2013

 

 

Newfoundland Power Inc.                                                                                      P.U. 3 (2013)

Application:

Application for the approval of a Contribution in Aid of Construction for a line extension to serve Domestic Customers in the cottage area known as Grouse-Famine located on the Burin Peninsula.

Decision:

1.          The Non-Refundable Contribution in Aid of Construction of four thousand three hundred four dollars and fifty cents ($4,304.50), excluding HST, to apply to Domestic Customers located in the cottage area known as Grouse-Famine is approved.

2.          Newfoundland Power shall pay all expenses of the Board arising from this Application.

Date Issued:

February 1, 2013

 

 

Newfoundland and Labrador Hydro                                                                     P.U. 4 (2013)

Application – Phase II:

Application for by Newfoundland and Labrador Hydro for an order: (a) approving its 2013 capital budget; (b) approving its 2013 capital purchases and construction projects in excess of $50,000; (c) approving the estimated contributions in aid of construction for 2013; and (d) fixing and determining its average rate base for 2011.

Decision:

1.          Hydro’s proposed construction and purchase of improvements or additions to its property in excess of $50,000 to be completed in 2013, as set out in Schedule A to this Order, are approved, except:

a)       Front End Engineering Design ($472,100) is not approved; and

b)      Automated Fuel Monitoring System, Upper Salmon ($192,700) is approved but costs for this project will not be recovered unless otherwise ordered by the Board.

2.          Hydro’s proposed multi-year construction and purchase of improvements or additions to its property in excess of $50,000 to begin in 2013, as set out in Schedule B to this Order, are approved.

3.          Hydro’s proposed contributions in aid of construction for 2013 are approved.

4.          Hydro’s 2013 Capital Budget for improvements or additions to its property in the amount of $62,272,500, as set out in Schedule C to this Order, is approved.

5.          Unless otherwise directed by the Board Hydro shall file, in conjunction with the 2014 Capital Budget Application, an overview in relation to the proposed capital expenditures for the Holyrood Thermal Generating Station.

6.          Unless otherwise directed by the Board Hydro shall file an annual report with the Board in relation to its 2013 capital expenditures by March 1, 2014.

7.          Unless otherwise directed by the Board Hydro shall file, in conjunction with the 2014 Capital Budget Application, a status report on the 2013 capital expenditures.

8.          The Industrial Customers are entitled to an award of costs in an amount to be fixed by the Board.

9.          Hydro shall pay all costs and expenses of the Board incurred in connection with this Application.

Date Issued:

February 26, 2013

 

 

Newfoundland Power Inc.                                                     P.U. 5 (2013) Amended Schedules

Application:

Application for approval of: (i) distribution line costs per metre for Contributions in Aid of Construction (CIACs); (ii) distribution plant upgrade cost for CIACs; and (iii) CIAC cost factors.

Decision:

1.          The cost factors submitted with the Application and contained in Schedules A, B, C and D attached to this Order are approved to be used in the calculation of all CIACs with effect from February 28, 2013 and, where advantageous to customers of Newfoundland Power, on all CIACs quoted but unpaid as of February 28, 2013.

2.          Newfoundland Power submit a revised CIAC Policy in its entirety incorporating the revisions approved herein.

3.          Newfoundland Power shall pay the expenses of the Board arising from this Application.

Date Issued:

February 28, 2013

 

 

Newfoundland and Labrador Hydro                                                                     P.U. 6 (2013)

Application:

Application by Newfoundland and Labrador Hydro for approval of a contribution in aid of construction of an upgrade of a distribution line from single-phase to three-phase for the Red Ochre Regional Economic Development Board. (Three-phase service to the Cooke Aquaculture Fish Hatchery in Daniel’s Harbour).

Decision:

1.          The Contribution in Aid of Construction of Two hundred and eighty-seven thousand four hundred seventy-two dollars and forty-nine cents ($287,472.49), excluding HST, as calculated under the policy to provide three-phase service to the Cooke Aquaculture Fish Hatchery in Daniels’s Harbour, for the Red Ochre Regional Economic Development Board is approved.

2.          Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

March 1, 2013

 

 

Newfoundland and Labrador Hydro                                                                     P.U. 7 (2013)

Application:

Application by Newfoundland and Labrador Hydro for approval of a contribution in aid of construction of an upgrade of a distribution line from single-phase to three-phase for the Red Ochre Regional Economic Development Board. (Three-phase service to the Brophy’s Dairy’s Farm in Daniel’s Harbour).

Decision:

1.          The Contribution in Aid of Construction of Two hundred and sixty-two thousand eight hundred seventy-one dollars and nine cents ($262,871.09), excluding HST, as calculated under the policy to provide three-phase service to Brophy’s Dairy Farm in Daniel's Harbour for the Red Ochre Regional Economic Development Board is approved.

2.          Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

March 15, 2013

 

 

Newfoundland Power Inc.                                                                                      P.U. 8 (2013)

Application:

Application for approval for disposition of the balance in the Demand Management Incentive Account pursuant to Sections 58 and 80 of the Act.

Decision:

1.          The Board approves, pursuant to Sections 58 and 80 of the Act, the disposition of the 2012 balance in the Demand Management Incentive Account and related income tax effects by means of a credit in the amount of $785,446 to the Rate Stabilization Account as of March 31, 2013.

2.          Newfoundland Power shall pay all costs and expenses of the Board arising from this Application.

Date Issued:

March 15, 2013

 

 

Newfoundland and Labrador Hydro                                                                     P.U. 9 (2013)

Application:

Newfoundland and Labrador Hydro filed an application on March 6, 2013 seeking approval of a service agreement and rates to be charged to a new Industrial Customer, Praxair Canada Inc. on an interim basis, pursuant to Sections 71 and 75 of the Act.

Decision:

1.          The Service Agreement for Praxair Canada Inc. is approved, as filed.

2.          The rates that apply as of this date to Teck Resources Limited and Vale Newfoundland and Labrador, pending a final Order to be made by the Board varying or confirming that rates determination, shall apply to electrical service provided by Hydro to Praxair Canada Inc., effective from the date that Praxair Canada Inc. first begins receiving power under the approved Service Agreement.

3.          Hydro shall file an executed Service Agreement and an interim rate schedule reflecting the rates approved in this Order and indicating the effective date.

4.          Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

April 3, 2013

 

 

Newfoundland Power Inc.                                                                                    P.U. 10 (2013)

Application:

Application for approval for disposition of the balance in the Optional Seasonal Rate Revenue and Cost Recovery Account.

Decision:

1.          The Board approves the disposition of the balance in the Optional Seasonal Rate Revenue and Cost Recovery Account as of December 31, 2012 by charging the balance of $129,795 to the Rate Stabilization Account as of March 31, 2013.

2.          Newfoundland Power shall pay all costs and expenses of the Board in connection with this Application.

Date Issued:

April 8, 2013

 

 

Newfoundland Power Inc.                                                                                    P.U. 11 (2013)

Application:

Application for approval of the balance in the Weather Normalization Reserve as of December 31, 2012.

Decision:

1.          Newfoundland Power’s Weather Normalization Reserve of a positive balance of $4,803,404 as of December 31, 2012 is approved.

2.          Newfoundland Power shall pay all costs and expenses of the Board in connection with this Application.

Date Issued:1

April 8, 2013

 

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 12 (2013)

Application:

Application for approval of $5,198,000 in supplemental capital expenditures in 2013 to refurbish the marine terminal at the Holyrood Thermal Generating Station.

Decision:

1.          The proposed 2013 capital expenditure of $5,198,000 for the refurbishment of the marine terminal at the Holyrood Thermal Generating Station is approved.

2.          Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

April 11, 2013

 

 

Newfoundland Power Inc.                                                                                    P.U. 13 (2013)

Application:

General Rate Application by Newfoundland Power Inc. to establish customer electricity rates.

Decision:

RATE BASE, RETURN ON RATE BASE AND RANGE OF RETURN

1.         Newfoundland Power shall file an application for approval of a revised forecast average rate base and rate of return on rate base for 2013 and 2014 based on the proposals in the Application, incorporating the determinations of the Board in this Order, including:

i)          a common equity component in the capital structure not to exceed 45% for ratemaking purposes; and

ii)        a ratemaking rate of return on common equity of 8.8%.

2.         The allowed range of rate of return on rate base shall be 36 basis points for 2013, 2014 and 2015.

3.         Newfoundland Power shall file an application for approval of a revised definition of the Excess Earnings Account.

4.         Newfoundland Power shall file an application on or before November 17, 2014 for approval of the 2015 forecast average rate base and rate of return on rate base maintaining the ratemaking common equity ratio and return on common equity established in this Order.

5.         Newfoundland Power shall, unless otherwise directed by the Board, file its next general rate application with a 2016 test year on or before June 1, 2015.

REVENUE REQUIREMENT

6.          Newfoundland Power shall calculate and file a revised forecast revenue requirement for the 2013 and 2014 test years based on the proposals in the Application, incorporating the determinations of the Board in this Order.

DEPRECIATION

7.          Newfoundland Power’s proposal to adjust the depreciation expense to amortize the accumulated reserve variance of approximately $2.6 million over the account’s composite remaining life is approved.

8.          Newfoundland Power’s proposal to use the depreciation rates recommended in the 2010 Depreciation Study is approved.

9.          Newfoundland Power shall file its next depreciation study relating to plant in service as of December 31, 2014 with its next general rate application.

OTHER REGULATORY MATTERS

10.      The proposed calculation of the defined benefit pension expense for regulatory purposes in accordance with United States Generally Accepted Accounting Principles is approved.

11.      The amortization over 15 years, commencing in 2013, of the forecast defined benefit pension expense regulatory asset approved in Order No. P.U. 11(2012) of approximately $12.4 million is approved.

12.      The amortization over seven years, commencing in 2013, of annual customer energy conservation program costs through the annual Rate Stabilization Account adjustment is approved.

13.      The proposed change in the definition of the Conservation and Demand Management Cost Deferral Account is approved as set out in Schedule A to this Order.

14.      The proposed disposition of the annual balance in the Weather Normalization Reserve Account through the annual Rate Stabilization Account adjustment is approved.

15.      The amortization over three years, commencing in 2013, of the 2011 year-end balance in the Weather Normalization Reserve Account of approximately $5.0 million is approved.

16.      The amortization over three years, commencing in 2013, of the amount of $4,726,000 relating to previously approved deferrals is approved.

17.      The amortization over three years, commencing in 2013, of the amount of the revenue shortfall for 2012 resulting from the determination of Newfoundland Power’s 2012 cost of capital in Order No. P.U. 17(2012) is approved.

18.      The amortization over three years, commencing in 2013, of costs billed to Newfoundland Power for Board and Consumer Advocate hearing costs relating to the Application, estimated to be $1.25 million, is approved.

19.      The proposed amortization over three years, commencing in 2013, of the 2013 revenue shortfall resulting from the implementation of new rates after January 1, 2013 is approved.

20.      Newfoundland Power shall file with the Board, no later than April 1, 2014, a report in relation to its conservation program and the process for the review of this program.

21.      Newfoundland Power shall file, as part of its next general rate application, a report on its capital structure.

RATES, RULES AND REGULATIONS

22.      The proposed changes to the rate design and structure are approved as follows:

(i)                 merge existing Rates 2.1 and 2.2 into a single General Service Rate for all customers with demands of less than 100kW;

(ii)               modify demand and energy charges to better reflect marginal costs;

(iii)             change energy block sizes in Rates 2.3 and 2.4;

(iv)              make changes to the basic customer charge;

(v)                apply the average rate increase to the Maximum Monthly Charge;

(vi)              maintain the Curtailable Service Option with the current credit;

(vii)            modify the Early Payment Discount;

(viii)          maintain the Optional Seasonal Rate Revenue and Cost Recovery Account until the next general rate application;

(ix)              increase the Optional Seasonal Rate consistent with the Rate 1.1 increase; and

(x)                increase the Time of Day Rates in accordance with the increase in the applicable rate class.

23.      The proposed changes to the Rate Stabilization Clause are approved as set out in Schedule B to this Order.

24.      Newfoundland Power shall file an application for approval of a revised Schedule of Rates, Tolls and Charges effective for service provided on and after July 1, 2013, based on the proposals in the Application, incorporating the determinations of the Board in this Order.

25.      Newfoundland Power shall file revised Rules and Regulations to be effective July 1, 2013.

HEARING COSTS

26.    Newfoundland Power shall pay the costs and expenses of the Board arising from the Application, including the expenses of the Consumer Advocate incurred by the Board.

Date Issued:

April 17, 2013

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 14 (2013)

Application:

Application for approval of the refurbishment of Unit 1 at the Holyrood Thermal Generating Station.

Decision:

1.          The proposed 2013 capital expenditure of $12,809,700 for the refurbishment and repairs to Unit 1 at the Holyrood Thermal Generating Station is approved.

2.          Hydro shall file a report in relation to the root cause of the failure of Unit 1 at the Holyrood Thermal Generating Station on or before June 30, 2013.

3.          Hydro shall not include the expenditure in relation to the refurbishment and repairs to Unit 1 at the Holyrood Thermal Generating Station in rate base until a further Order of the Board.

4.          Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

April 24, 2013

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 15 (2013)

Application:

Application for the approval to install additional 230 kV transformer capacity at the Oxen Pond Terminal Station.

Decision:

1.          The proposed multi-year capital expenditures for the installation of additional 230 kV transformer capacity at the Oxen Pond Terminal Station in the amount of $3,823,600 in 2013 and $15,310,400 in 2014 are approved.

2.          Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

April 29, 2013

 

 

Newfoundland Power Inc.                                                                                    P.U. 16 (2013)

Application:

Application for an Order of the Board providing for disposition of: (i) the balance in the Pension Expense Variance Deferral Account (the “PEVDA”) and (ii) the balance in the OPEBs Cost Variance Deferral Account (the “OPEVDA”).

Decision:

1.          Newfoundland Power’s proposal that the Pension Expense Variance for 2013 of $2,081,909 be charged to the PEVDA and the balance in the PEVDA for 2013 of $2,081,909 be charged to the Rate Stabilization Account as of March 31, 2013 is approved.

2.          Newfoundland Power’s proposal that the OPEBs Expense Variance for 2013 of $452,200 be charged to the OPEVDA and the balance in the OPEVDA for 2013 of $452,200 be charged to the Rate Stabilization Account as of March 31, 2013 is approved.

3.          Newfoundland Power shall pay all expenses of the Board arising from this Application.

Date Issued:

May 10, 2013

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 17 (2013)

Application:

Application for approval, pursuant to Section 70 of the Act, of the Rate Stabilization Plan Adjustment in the rates to be charged to Newfoundland Power Inc.

Decision:

1.          The rates to be charged by Hydro to Newfoundland Power, as set out in Schedule “A” to this Order, to be effective for electrical consumption on or after July 1, 2013, are approved on an interim basis.

2.          Hydro shall pay the expenses of the Board incurred in connection with this matter.

Date Issued:

May 13, 2013

 

 

Newfoundland Power Inc.                                                                                    P.U. 18 (2013)

Application:

Application for approval of a Contribution in Aid of Construction for a line extension to serve Domestic Customers in the cottage area known as Pitts Pond South, near the community of Terra Nova.

Decision:

1.          The Non-Refundable Contribution in Aid of Construction of seven thousand eight hundred forty-three dollars and seventy-five cents ($7,843.75), excluding HST, to apply to Domestic Customers located in the Cottage Area known as Pitts Pond South is approved.

2.          Newfoundland Power shall pay all expenses of the Board arising from this Application.

Date Issued:

May 16, 2013

 

 

Newfoundland and Labrador Hydro                                                   P.U. 19 (2013) Amended

Application:

Application for approval of a contribution in aid of construction to construct a three-phase distribution line extension for the Department of Municipal Affairs to serve the Trouser Lake Pumphouse near the community of Nain, pursuant to Section 41 of the Act.

Decision:

1.          The Contribution in Aid of Construction of seven hundred eight thousand eight hundred and thirty-eight dollars ($708,838.00), excluding HST, as calculated under the Policy to provide three-phase service to the Trouser Lake Pumphouse, as requested by the Department of Municipal Affairs on behalf of the Inuit Community Government of Nain, is approved.

2.          Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

May 16, 2013

 

 

Newfoundland and Labrador Hydro                                                   P.U. 20 (2013) Amended

Application:

Application for approval to proceed with replacement of the Hardwoods Gas Turbine Alternator.

Decision:

1.          The proposed capital expenditure of $8,015,800 for the replacement of the alternator on the Hardwoods Gas Turbine is approved.

2.          Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

May 16, 2013

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 21 (2013)

Application:

Application for the deferred recovery of 2013 costs associated with its 2013 energy conservation plan..

Decision:

1.       The deferred recovery of the 2013 costs related to the energy conservation plan, estimated to be $1,950,000, is not approved.

2.       Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

May 27, 2013

 

 

Newfoundland Power Inc.                                                                                    P.U. 22 (2013)

Application:

Application for approval of a contribution in aid of construction for three-phase electrical service for Pennecon Limited pursuant to Section 41of the Act.

Decision:

1.       The Contribution in Aid of Construction of one hundred fifty thousand one hundred ninety dollars and forty-eight cents ($150,190.48), excluding HST, as calculated under the Policy to provide three-phase electrical service to an industrial manufacturing facility in the town of Bay Bulls as requested by Pennecon Limited is approved.

2.       Newfoundland Power shall pay all expenses of the Board arising from this Application.

Date Issued:

June 6, 2013

 

 

Newfoundland Power Inc.                                                                                    P.U. 23 (2013)

Application:

An application by Newfoundland Power Inc. for approval of:

a)       customer rates, tolls and charges reflecting the determinations set out in Order No. P.U. 13(2013); and

b)      a revised rate stabilization adjustment and municipal tax adjustment to apply to the rates of Newfoundland Power Inc. for the period of July 1, 2013 to June 30, 2014.

Decision:

1.       The forecast average rate base for 2013 of $918,716,000 and the forecast average rate base for 2014 of $955,416,000 are approved.

2.       The rate of return on average rate base for 2013 of 7.92% in a range of 7.74% to 8.10% and the rate of return on average rate base for 2014 of 7.88% in a range of 7.70% to 8.06% are approved.

3.       The Rate Stabilization Adjustment of 0.839 cents/kWh and the Municipal Tax Adjustment Factor of 1.02377 for the period of July 1, 2013 to June 30, 2014 are approved.

4.       The Schedule of Rates, Tolls and Charges of Newfoundland Power as set out in Schedule A, to be effective for all electrical consumption on and after July 1, 2013, is approved.

5.       Newfoundland Power shall make an application to implement the amendments to the Maximum Monthly Charge in Rates 2.2, 2.3 and 2.4 approved in Order No. P.U. 13(2013) after Newfoundland and Labrador Hydro has applied for a change in its base rate to Newfoundland Power.

6.       Amendments to the Rate Stabilization Clause to clarify the language in relation to: i) the Weather Normalization Reserve balance in the Rate Stabilization Account; and ii) the energy charge in the “Maximum Monthly Charge”, are approved as set out in Schedule B.

7.       Newfoundland Power shall file revised Rules and Regulations to be effective July 1, 2013.

8.       The revised definition of the Excess Earnings Account as set out in Schedule C is approved.

9.       Newfoundland Power shall pay the expenses of the Board arising from this Application.

Date Issued:

June 14, 2013

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 24 (2013)

Application:

Application for approval of a change in rates to be charged to Island Interconnected and Isolated Rural customers.

Decision:

1.       The rates proposed by Hydro to be effective for all electrical consumption on or after July 1, 2013 for its Island Interconnected customers, excluding Burgeo School & Library (rate Classes 1.1, 1.1S, 2.1, 2.3, 2.4 and 4.1) and Isolated Rural customers (rate Classes 1.2D, 1.2DS, 2.1D and 2.2D and 4.1D), as set out in Schedule A to this Order, are approved.

2.       Newfoundland and Labrador Hydro shall file a revised Schedule of Rates, Tolls and Charges to be effective July 1, 2013.

3.       Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

June 14, 2013

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 25 (2013)

Application:

Application for approval, on an ex parte basis, to proceed with the lease of vehicles pursuant to Section 41 of the Act.

Decision:

1.       The two proposed three-year automobile leases in the amount of $5,888.76, plus HST, and $5,852.52, plus HST, are approved.

2.       Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

June 20, 2013

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 26 (2013)

Application:

Application for approval, of the Rate Stabilization Plan rules and components of the rates to be charged to Island Industrial customers.

Decision:

1.       Hydro shall on August 31, 2013:

i)        credit $49 million to the Island Industrial customers’ Rate Stabilization Plan; and

ii)      transfer the remaining balance in the January 1, 2007 to August 31, 2013 accumulated Load Variation component of the Rate Stabilization Plan to the credit of the Newfoundland Power Inc. Rate Stabilization Plan.                                                            

2.       The rates to be charged to all Island Industrial customers, as set out in Schedule “A” to this Order, to be effective for electrical consumption on and after September 1, 2013, are approved on an interim basis.

3.       Hydro shall pay the expenses of the Board incurred in connection with this matter.

Date Issued:

August 30, 2013

 

 

Newfoundland Power Inc.                                                                                    P.U. 27 (2013)

Application:

An application by Newfoundland Power Inc.:
        (a)     approving its 2014 Capital Budget of $84,462,000; and
        (b)     fixing and determining its average rate base for 2012 in the amount of $883,045,000.

Decision:

1.       Newfoundland Power’s 2014 capital purchases and construction projects in excess of $50,000, as set out in Schedule A to this Order, are approved.

2.       The 2014 Capital Budget for improvements and additions to Newfoundland Power’s property in an amount of $84,462,000 is approved, as set out in Schedule B.

3.       The average rate base for the year ending December 31, 2012 is hereby fixed and determined at $883,045,000.

4.       Unless otherwise directed by the Board, Newfoundland Power shall file an annual report to the Board on its 2014 capital expenditures by March 1, 2015.

5.       Unless otherwise directed by the Board, Newfoundland Power shall provide, in conjunction with the 2015 Capital Budget Application, a status report on the 2014 capital budget expenditures showing for each project:

(i)                 the approved budget for 2014;

(ii)               the expenditures prior to 2014;

(iii)             the 2014 expenditures to the date of the application;

(iv)              the remaining projected expenditures for 2014;

(v)                the variance between the projected total expenditures and the approved budget; and

(vi)              an explanation of the variance.

6.       Newfoundland Power shall pay all costs and expenses of the Board incurred in connection with the Application.

Date Issued:

September 13, 2013

 

 

Newfoundland and Labrador Hydro                                    P.U. 28 (2013) Amended Schedule

Application:

General Rate Application to establish customer electricity rates effective January 1, 2014.

Decision:

1.       The Intervenors in the Application are as set out in Schedule “A” to this Order.

2.       The Schedule of Dates for the Application is approved as set out in Schedule “B” to this Order.

3.       The Rules of Procedure for the Application are approved as set out in Schedule “C” to this Order.

Date Issued:

September 19, 2013

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 29 (2013)

Application:

Application for approval of the Rate Stabilization Plan rules and components of the rates to be charged to Island Industrial customers pursuant to section 71 of the Act.

Decision:

1.       Hydro’s Island Industrial customer rates charged for electrical consumption from January 1, 2008 to August 31, 2013 are approved on a final basis.

2.       Hydro’s Utility rate charged for electrical consumption from January 1, 2011 to August 31, 2013 is approved on a final basis.

3.       The rates to be charged to Island Industrial customers to be effective for electrical consumption on and after September 1, 2013, are approved on an interim basis, as set out in Schedule A to this Order.

4.       Hydro’s Utility rate to be charged to Newfoundland Power Inc. to be effective for electrical consumption on and after September 1, 2013, is approved on an interim basis, as set out in Schedule B to this Order.

5.       Hydro shall file revised Rate Stabilization Plan rules reflecting the findings of the Board in this Order to be effective September 1, 2013 on an interim basis.

6.       The Industrial Customers (Corner Brook Pulp and Paper Limited, North Atlantic Refining Limited and Teck Resources Limited) are entitled to an award of costs in an amount to be fixed by the Board.

7.       Vale Newfoundland and Labrador Limited is entitled to an award of costs in an amount to be fixed by the Board.

8.       Hydro shall pay all costs and expenses of the Board incurred in connection with the Application.

Date Issued:

September 30, 2013

 

 

Newfoundland Power                                                                                            P.U. 30 (2013)

Application:

An application by Newfoundland Power Inc.: for approval to issue Series AN First Mortgage Bonds pursuant to section 91 of the Act.

Decision:

1.       Newfoundland Power’s proposal to issue Series AN First Mortgage Bonds in an amount of up to $75,000,000 is approved subject to the following conditions:

(a)    The bonds shall be issued on or before March 31, 2014.

(b)    Newfoundland Power shall file with the Board a report specifying the terms and conditions of the bond issue within five (5) days after closing, setting out the following:

                                                                                                                          i.      date of issue;

                                                                                                                        ii.      term;

                                                                                                                      iii.      maturity date;

                                                                                                                       iv.      principal amount;

                                                                                                                         v.      coupon rate;

                                                                                                                       vi.      particulars of sinking fund, if any;

                                                                                                                     vii.      price to public and to the underwriters;

                                                                                                                   viii.      yield to the public;

                                                                                                                       ix.      underwriting fee;

                                                                                                                         x.      actual cost (i.e. yield) to Newfoundland Power, and

                                                                                                                       xi.      any other material terms or conditions.

(c)    Newfoundland Power shall file with the Board a copy of the Underwriting Agreement relating to the bond issue within five (5) days after closing.

(d)    Newfoundland Power shall file with the Board a report on the disposition of the proceeds no later than six months from the date of the bond issue.

2.       Newfoundland Power shall pay all expenses of the Board arising from this Application.

Date Issued:

October 23, 2013

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 31 (2013)

Application:

Approval of capital expenditures to supplement the Allowance for Unforeseen Items for the construction and purchase of certain improvements and additions to its property pursuant to section 41 of the Act.

Decision:

1.      The addition of a supplementary amount of $207,000 to the 2013 Allowance for Unforeseen Items is approved.

2.    Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

October 25, 2013

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 32 (2013)

Application:

Application for approval of the Rate Stabilization Plan rules pursuant to section 71 of the Act.

Decision:

1.    The Rate Stabilization Plan rules proposed by Hydro in its application and attached hereto as Schedule “A” are approved on an interim basis.

2.    Hydro shall pay the expenses of the Board incurred in connection with this matter.

Date Issued:

November 01, 2013

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 33 (2013)

Application:

Application for approval of the replacement of a generator main breaker at Hinds Lake pursuant to section 41 of the Act.

Decision:

1.       The proposed capital expenditure of $388,700 for the replacement of a breaker at Hinds Lake generating station is approved.

2.       Hydro shall pay the expenses of the Board arising from this Application.

Date Issued:

November 06, 2013

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 34 (2013)

Application:

Application for approval of changes to the Rate Stabilization Plan rules pursuant to section 71 of the Act.

Decision:

1.       The Rate Stabilization Plan rules attached hereto as Schedule “A” are approved on an interim basis.

2.       Hydro shall pay the expenses of the Board arising from this Application.

Date Issued:

November 25, 2013

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 35 (2013)

Application:

Application for approval for the deferred recovery of 2013 costs associated with its energy conservation plan.

Decision:

1.       The deferred recovery of the 2013 costs related to Hydro’s energy conservation plan, estimated to be $1,950,000, is approved.

2.       Hydro shall pay the expenses of the Board arising from this Application.

Date Issued:

November 27, 2013

 

 

Newfoundland Power                                                                                            P.U. 36 (2013)

Application:

Application for approval of a Contribution in Aid of Construction for a line extension to serve Domestic Customers in the cottage area known as Big Eel Lake, near the town of Norris Arm.

Decision:

1.       The Non-Refundable Contribution in Aid of Construction of five thousand two hundred four dollars and six cents ($5,204.06), excluding HST, to apply to Domestic Customers located in the Cottage Area known as Big Eel Lake is approved.

2.       Newfoundland Power shall pay all expenses of the Board arising from this Application.

Date Issued:

November 28, 2013

 

 

 

 

Newfoundland Power                                                                                            P.U. 37 (2013)

Application:

Application by Newfoundland Power Inc. for approval of a Contribution in Aid of Construction for three-phase electrical service for Labrador-Island Link Limited Partnership.

Decision:

1.       The Contribution in Aid of Construction of three hundred sixty-seven thousand seven hundred thirty-five dollars and sixty-five cents ($367,735.65), excluding HST, as calculated under the Policy to provide three-phase electrical service to the terminal station facility located near Soldiers Pond as requested by Labrador-Island Link Limited Partnership is approved.

2.       Newfoundland Power shall pay all expenses of the Board arising from this Application.

Date Issued:

November 28, 2013

 

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 38 (2013)

Application:

Application for approval of capital expenditures and for deferral of lease costs associated with the installation of diesel units at the Holyrood Thermal Generating Station for the purpose of black start, pursuant to sections 41, 49, 78 and 80 of the Act.

Decision:

1.       The proposed capital expenditure of $1,263,400 to install a 16 MW diesel plant and other necessary infrastructure to ensure black start capability at the Holyrood Thermal Generating Station is approved.

2.   The creation of a deferral account to allow for the deferred recovery, until a further Order of the Board, of lease costs associated with the 16 MW diesel plant and other necessary infrastructure to  ensure black start capability at the Holyrood Thermal Generating Station is approved.

3.   Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

November 29, 2013

 

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 39 (2013)

Application:

Application for approval of a capital expenditure to purchase equipotential bonding and grounding equipment pursuant to section 41 of the Act.

Decision:

1.       The proposed capital expenditure of $158,300 for the purchase of equipotential bonding and grounding equipment is approved.

2.       Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

December 02, 2013

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 40 (2013)

Application:

Application for approval of rate changes for certain customers on an interim basis, effective January 1, 2014, pursuant to section 75 of the Act.

Decision:

1.       The Rate Stabilization Plan rules attached hereto as Schedule "A" are approved on an interim basis.

2.       Hydro shall pay the expenses of the Board incurred in connection with this matter.

                           Date Issued:

                           December 13, 2013

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 41 (2013)

Application                                                                                                              

Application for approval for approval to treat costs associated with repairs to the fuel oil system at the Holyrood Thermal Generating Station as an extraordinary expense pursuant to sections 69, 78 and 80 of the Act

Decision

1.       The creation of a deferral account for Hydro’s 2013 costs relating to repairs to the fuel oil system at the Holyrood Thermal Generating Station is approved.

2.       Hydro’s proposals in relation to the recovery of the 2013 costs relating to the repairs to the fuel oil system at the Holyrood Thermal Generating Station and the inclusion in rate base of the unamortized balance are not approved at this time and will be addressed in a subsequent Order of the Board.

3.       Hydro shall pay all expenses of the Board arising from this Application.

                          Date Issued:
                          December 13, 2013

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 42 (2013)

Application:

An application by Newfoundland and Labrador Hydro for an order: a) approving its 2014 capital budget; b) approving its 2014 capital purchases and construction projects in excess of $50,000; c) approving the estimated contributions in aid of construction for 2014; and d) fixing and determining its average rate base for 2012.

Decision:

1.       Hydro’s proposed construction and purchase of improvements or additions to its property in excess of $50,000 to be completed in 2014, as set out in Schedule A to this Order, are approved.

2.       Hydro’s proposed multi-year construction and purchase of improvements or additions to its property in excess of $50,000 to begin in 2014, except:

a.        Replace diesel units – Port Hope Simpson and Mary’s Harbour;

b.    Upgrade Excitation Systems Units 1 and 2 – Holyrood; and

c.    Upgrade Shoreline Protection – Cat Arm (expenditures beyond 2014),

      as set out in Schedule B to this Order, are approved.

3.       Hydro shall not recover any costs over and above the approved capital expenditure of $12,650,000 associated with the project to construct two 25 kV Terminal Stations in Labrador City until further review and Order of the Board.

4.       Hydro’s proposed contributions in aid of construction for 2014 are approved.

5.       Hydro’s 2014 Capital Budget for improvements or additions to its property in the amount of $97,805,300, as set out in Schedule C to this Order, is approved.

6.       Unless otherwise directed by the Board Hydro shall file, in conjunction with the 2015 Capital Budget Application, an updated overview in relation to the proposed capital expenditures for the Holyrood Thermal Generating Station.

7.       Unless otherwise directed by the Board Hydro shall file an annual report with the Board in relation to its 2014 capital expenditures by March 1, 2015.

8.       Unless otherwise directed by the Board Hydro shall file, in conjunction with the 2015 Capital Budget Application, a status report on the 2014 capital expenditures.

9.       Vale and the Industrial Customer Group are entitled to an award of costs in an amount to be fixed by the Board, with cost submissions to be filed by both parties within 30 days of this Order.

10.   Hydro shall pay all costs and expenses of the Board incurred in connection with this Application.

Date Issued:

December 20, 2013

 

 

Newfoundland Power                                                                                            P.U. 43 (2013)

Application:

Application for approval of a capital expenditure to replace the Bell Island Submarine Cable pursuant to section 41 of the Act.

Decision:

1.       The proposed capital expenditure of $14,520,000 to replace the Bell Island submarine cable system is approved.

2.       Newfoundland Power shall pay all expenses of the Board arising from this Application.

Date Issued:

December 20, 2013


Newfoundland Power Inc                                                                                       P.U. 1 (2012)

Application:

Application for approval of:

(i)        revised distribution line costs per metre for Contributions in Aid of Construction (CIACs);

(ii)      revised distribution plant upgrade cost for CIACs; and

(iii)  revised CIAC cost factors.

Decision:

1.       The revised cost factors submitted with the Application and contained in Schedules A, B, C and D attached to this Order are approved to be used in the calculation of all CIACs with effect from January 19, 2012 and, where advantageous to customers of Newfoundland Power, on all CIACs quoted but unpaid as of January 19, 2012.

2.       Newfoundland Power submit a revised CIAC Policy in its entirety incorporating the revisions approved herein.

3.       Newfoundland Power shall pay the expenses of the Board arising from this Application.

Date Issued:

January 12, 2012

 

 

 

Newfoundland and Labrador Hydro                                                                     P.U. 2 (2012)

Application:

Application by for an order:

(i)     approving changes to its capital expenditure methodology;

(ii)   approving its 2012 capital budget;

(iii) approving its 2012 capital purchases and construction projects in excess of $50,000;

(iv)  approving the estimated contributions in aid of construction for 2012; and

(v)    fixing and determining its average rate base for 2010.

Decision:

Phase I

1.       Hydro’s proposed changes to its capital expenditure methodology to incorporate the requirements of International Financial Reporting Standards are approved.

2.       As set out in Schedule A, Hydro’s proposed construction and purchase of improvements or additions to its property in excess of $50,000 to be completed in 2012 are approved, except:

a.       Upgrade Burnt Dam Spillway, Bay d’Espoir – $1,702,800 is not approved but approval is given for expenditures in the amount of $523,840 to install a stop log system and to conduct the recommended condition assessment;

b.       Increase Generation Capacity, Mary’s Harbour - $1,489,400 is not approved; and

c.       Upgrade Transmission Line Access Trails, Stoney Brook to Springdale - $313,000 is not approved.

3.       As set out in Schedule B, Hydro’s proposed multi-year construction and purchase of improvements or additions to its property in excess of $50,000, which began in 2011 and which are proposed to begin in 2012, are approved, except:

a.          Rewind Stator Units 1 and 3, Bay d’Espoir - $5,054,200 (2013) and $3,634,600 (2014) is not approved but approval is given for expenditures in the amount of $4,953,800 for the 2012 capital project Rewind Stator Unit 4; and

b.          Install Additional 230kV Transformer, Oxen Pond - $3,535,200(2012), $3,354,100(2013), $3,650,200(2014) is not approved.

4.       Pursuant to Section 78 of the Act the rate base for the year ending December 31, 2010 is hereby fixed and determined at $1,484,659,000.

5.       The Industrial Customers are entitled to an award of costs in an amount to be fixed by the Board.

6.       Hydro shall pay all costs and expenses of the Board incurred in connection with the Application.

Date Issued:

January 24, 2012

 

 

Newfoundland and Labrador Hydro                                                                     P.U. 3 (2012)

Application:

Application by Newfoundland and Labrador Hydro for the deferred recovery of 2012 costs associated with an energy conservation program.

Decision:

1.       The deferred recovery of the 2012 costs related to the Conservation Plan, estimated to be $1,673,000 is approved.

2.       Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

February 8, 2012

 

 

 

Newfoundland and Labrador Hydro                                                                     P.U. 4 (2012)

Application:

Application for approval of certain rules and regulations pertaining to the supply of electrical power and energy to one of its industrial customers, Corner Brook Pulp and Paper Limited.

Decision:

1.       The Service Agreement for Corner Brook Pulp and Paper Limited, as set out in the attached Schedule “A”, is approved on a pilot basis until a further Order of the Board.

2.       Hydro shall file with its next general rate application a proposal for approval of a Service Agreement for Corner Brook Pulp and Paper Limited and shall attach a report which sets out the impacts of the Service Agreement initially approved in Order No. P.U. 17(2009) for Corner Brook Pulp and Paper Limited, including analysis in relation to potential and actual fuel savings at Holyrood, the efficiency factor at the Holyrood Thermal Generating Station, the Rate Stabilization Plan, and the allocation of costs in revenue requirement.

3.       Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

February 8, 2012

 

 

Newfoundland and Labrador Hydro                                                                     P.U. 5 (2012)

Application:

Application by for an order:

(i)     approving changes to its capital expenditure methodology;

(ii)   approving its 2012 capital budget;

(iii) approving its 2012 capital purchases and construction projects in excess of $50,000;

(iv)  approving the estimated contributions in aid of construction for 2012; and

(v)    fixing and determining its average rate base for 2010.

Decision:

Phase II

1.       As set out in Schedule A, Hydro’s proposed construction and purchase of improvements or additions to its property in excess of $50,000 to be completed in 2012 are approved, except:

a.       Upgrade Marine Terminal, Holyrood $5,859,600(2012) is not approved.

2.       As set out in Schedule B, Hydro’s proposed multi-year construction and purchase of improvements or additions to its property in excess of $50,000 are approved, except:

a.       Install Plant Operator Training Simulator, Holyrood $1,028,200(2012) $1,072,700 (2013) is not approved; and

b.       Replace Fuel Oil Heat Tracing, Holyrood $1,474,300, (2012) $1,413,900 (2013) is approved but, unless otherwise ordered by the Board, Hydro is not permitted to recover the costs of this project.

3.       As set out in Schedule C, Hydro’s 2012 Capital Budget for improvements or additions to its property in the amount of $76,992,300 is approved.

4.       Unless otherwise directed by the Board Hydro shall file, in conjunction with the 2013 Capital Budget Application, an overview in relation to the proposed capital expenditures  for the Holyrood Thermal Generating Station.

5.       Unless otherwise directed by the Board Hydro shall file an annual report with the Board in relation to its 2012 capital expenditures by March 1, 2013, including the report in relation to expenditures to Refurbish the Fuel Storage Facility at the Holyrood Thermal Generating Station.

6.       Unless otherwise directed by the Board Hydro shall file, in conjunction with its 2013 Capital Budget Application, a status report on the 2012 capital expenditures.

7.       The Industrial Customers are entitled to an award of costs in an amount to be fixed by the Board.

8.       Hydro shall pay all costs and expenses of the Board incurred in connection with the Application.

Date Issued:

February 10, 2012

 

 

Newfoundland and Labrador Hydro                                                                     P.U. 6 (2012)

Application:

Application for approval of certain rules and regulations pertaining to the supply of electrical power and energy to one of its industrial customers, Vale Newfoundland & Labrador Limited.

Decision:

1.       The Service Agreement for Vale Newfoundland & Labrador Limited as per Schedule “A” is approved.

2.       The rates, rules that apply as of this date to Teck Resources Limited, pending a final order to be made by the Board varying or confirming that rates determination, shall apply to electrical service provided by Hydro to Vale Newfoundland & Labrador Limited, effective from the date that Vale Newfoundland & Labrador Limited first begins receiving power under the approved Service Agreement.

3.       Hydro shall file an interim rate schedule reflecting the rates approved in this Order and indicating the effective date.

4.       Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

March 9, 2012

 

 

Newfoundland Power Inc                                                                                       P.U. 7 (2012)

Application:

Application for approval of capital expenditures for the construction and purchase of certain improvements and additions to its property at the Milton Substation, and approval of a contribution in aid of construction of an upgrade of a distribution line from two-phase to three-phase for the Random North Development Association.

Decision:

1.       The proposed capital expenditure of $1,027,000 associated with the improvements and additions to Newfoundland Power’s property at the Milton Substation is approved.

2.       The Contribution in Aid of Construction of six hundred twenty-two thousand dollars ($622,000) excluding HST, as calculated under the policy to provide a three-phase supply to the area between the communities of Elliott’s Cove and Hickman’s Harbour on Random Island for the Random North Development Association is approved.

3.       Newfoundland Power shall pay all expenses of the Board arising from this Application.

Date Issued:

March 9, 2012

 

 

Newfoundland Power Inc                                                                                       P.U. 8 (2012)

Application:

Application for the approval to proceed with the construction and purchase of certain improvements and additions to its property by replacing a section of submarine cable from Broad Cove to Bell Island.

Decision:

1.       The proposed capital expenditure of $510,000 to replace the damaged section of the Bell Island submarine cable system is approved.

2.       Newfoundland Power shall pay all expenses of the Board arising from this Application.

Date Issued:

March 22, 2012

 

 

Newfoundland Power Inc                                                                                       P.U. 9 (2012)

Application:

Application for disposition of the 2011 balance in the Demand Management Incentive Account.

Decision:

1.       The Board approves, pursuant to Sections 58 and 80 of the Act, the disposition of the 2011 balance in the Demand Management Account and related income tax effects by means of a credit in the amount of $1,800,628 to the Rate Stabilization Account as of March 31, 2012.

2.       Newfoundland Power shall pay all costs and expenses of the Board arising from this Application.

Date Issued:

April 5, 2012

 

 

Newfoundland Power Inc                                                                                     P.U. 10 (2012)

Application:

Application for disposition of the balance in the Optional Seasonal Rate Revenue and Cost Recovery Account.

Decision:

1.       The Board approves the disposition of the balance in the Optional Seasonal Rate Revenue and Cost Recovery Account as of December 31, 2011 by charging the balance of $328,006 to the Rate Stabilization Account of March 31, 2012.

2.       Newfoundland Power shall pay all costs and expenses of the Board arising from this Application.

Date Issued:

April 13, 2012

 

 

Newfoundland Power Inc                                                                                     P.U. 11 (2012)

Application:

Application to effect the adoption of United States generally accepted accounting principles for regulatory purposes pursuant to Section 58 of the Act.

Decision:

1.       Newfoundland Power’s opening balances for regulatory assets and liabilities associated with employee future benefits as at January 1, 2012 totaling approximately $131,200,000 are approved.

2.       Newfoundland Power’s proposed definition for the Employee Future Benefits Regulatory Assets and Liabilities Account as set out in Schedule A is approved.

3.       Newfoundland Power shall pay all expenses of the Board arising from this Application.

Date Issued:

May 10, 2012

 

 

Newfoundland Power Inc                                                                                     P.U. 12 (2012)

Application:

Application for the approval of a Contribution in Aid of Construction for a line extension to serve Domestic Customers in the cottage area known as Tobacco Road located on the Burin Peninsula.

Decision:

1.       The Non-Refundable Contribution in Aid of Construction of three thousand seven hundred and five dollars and ninety-four cents ($3,705.94), excluding HST, to apply to Domestic

Customers located in the cottage area known as Tobacco Road is approved.

2.       Newfoundland Power shall pay all expenses of the Board arising from this Application.

Date Issued:

May 11, 2012

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 13 (2012)

Application:

Application to adopt International Financial Reporting Standards for regulatory purposes effective January 1, 2012 pursuant to Subsection 58 of the Act.

Decision:

1.       The adoption and use of International Financial Reporting Standards accounting standards by Hydro for financial reporting for regulatory purposes, effective January 1, 2012, is approved with the following exceptions:

a)       Hydro shall continue to adhere to existing accounting guidelines with respect to reporting of Rate Stabilization Plan balances and activity;

b)      Hydro shall continue to adhere to existing accounting guidelines with respect to reporting of deferred costs;

c)       Hydro shall ensure that 2011 transitional differences associated with the adoption of International Financial Reporting Standards are adjusted in Hydro’s 2012 opening retained earnings;

d)      Hydro shall include unamortized deferred revenue as a reduction from rate base; and

e)       Hydro shall record net insurance proceeds associated with capital projects of $50,000 or more as an offset against the cost of capital assets and as a reduction of the rate base value of those assets.

2.       Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

May 15, 2012

 

 

Newfoundland Power Inc                                                                                     P.U. 14 (2012)

Application:

Application for the approval of a Contribution in Aid of Construction for a line extension to serve Domestic Customers in the cottage area known as Osmonton’s Arm located near the community of Leading Tickles.

Decision:

1.       The Non-Refundable Contribution in Aid of Construction of three thousand seven hundred and five dollars and thirty-one cents ($3,705.31), excluding HST, to apply to Domestic Customers located in the cottage area known as Osmonton’s Arm is approved.

2.       Newfoundland Power shall pay all expenses of the Board arising from this Application.

Date Issued:

May 24, 2012

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 15 (2012)

Application:

Application for the approval of the Rate Stabilization Plan Adjustment in the rates to be charged to Newfoundland Power Inc.

Decision:

1.       The rates to be charged by Hydro to Newfoundland Power, as set out in Schedule “A” to this Order, to be effective for electrical consumption on or after July 1, 2012, are approved on an interim basis.

2.       Hydro shall pay the expenses of the Board incurred in connection with this matter.

Date Issued:

May 24, 2012

 

 

Newfoundland Power Inc                                                                                     P.U. 16 (2012)

Application:

Application for the approval of a Contribution in Aid of Construction to provide three-phase electrical service to Karwood Contracting Ltd.

Decision:

1.    The Contribution in Aid of Construction of fifty-one thousand five hundred dollars ($51,500), excluding HST, to apply to Karwood Contracting Ltd., is approved.

2.    Newfoundland Power shall pay all expenses of the Board arising from this Application.

Date Issued:

June 7, 2012

 

 

Newfoundland Power Inc                                                                                     P.U. 17 (2012)

Application:

Application for the approval the just and reasonable return on rate base for 2012 for Newfoundland Power Inc. pursuant to Section 80 of the Act.

Decision:

1.    The proposed rate of return on average rate base for 2012 of 8.14% in a range of 7.96% to 8.32% is approved.

2.    The proposal that Newfoundland Power establish a 2012 Cost of Capital Cost Recovery Deferral Account to allow for the deferred recovery of the full amount of the

     difference in revenue between an 8.38% return on common equity and an 8.80% return on common equity for 2012, calculated on the basis of Newfoundland

     Power’s 2010 test year costs is approved, as set out in Schedule A.

3.    The proposed revised definition of the Excess Earnings Account is approved, as set out in Schedule B.

4.    Newfoundland Power’s current customer rates shall be considered final rates from January 1, 2012, as set out in Schedule C.

5.    Newfoundland Power shall pay the expenses of the Board arising from this application, including the expenses of the Consumer Advocate incurred by the Board.

Date Issued:

June 15, 2012

 

Newfoundland Power Inc                                                                                     P.U. 18 (2012)

Application:

Application for the approval of a Contribution in Aid of Construction to provide three-phase electrical service to the Department of Transportation and Works, Government of Newfoundland and Labrador

(Service a depot station in the Town of Renews-Cappahayden).

Decision:

1.    The Contribution in Aid of Construction of fifty thousand three hundred four dollars ($50,304), excluding HST, to provide a three-phase supply to the Department of Transportation and Works, Government of

Newfoundland and Labrador is approved.

2.    Newfoundland Power shall pay all expenses of the Board arising from this Application.

Date Issued:

June 22, 2012

 

 

Newfoundland Power Inc                                                                                     P.U. 19 (2012)

Application:

Application for the approval for approval of the balance in the Weather Normalization Reserve as of December 31, 2011.

Decision:

1.    Newfoundland Power’s Weather Normalization Reserve of a positive balance of $5,019,776 as of December 31, 2011 is approved,

2.    Newfoundland Power shall pay all costs and expenses of the Board in connection with this Application.

Date Issued:

June 22, 2012

 

 

Newfoundland Power Inc                                                                                     P.U. 20 (2012)

Application:

Application for the approval of rate stabilization and municipal tax adjustments for the period July 1, 2012 to June 30, 2013 and a schedule of rates, tolls and charges incorporating the rate stabilization and municipal tax adjustments and a schedule of rates for use in a time of day rate study.

Decision:

1.    The Rate Stabilization Adjustment of 1.770 cents/kWh for the period of July 1, 2012 to June 30, 2013, is approved.

2.    The Municipal Tax Adjustment Factor of 1.02337 for the period of July 1, 2012 to June 30, 2013, is approved.

3.    Newfoundland Power’s Schedule of Rates, Tolls and Charges, as set out in Schedule A to this Order, to be effective on all electrical consumption on and after July 1, 2012, is approved.

4.    Newfoundland Power’s Schedule of Rates, Tolls and Charges, for customers participating in the time of day rate study, as set out in Schedule B to this Order to be effective on all electrical consumption on and after July 1, 2012, is approved.

5.    Newfoundland Power shall pay the expenses of the Board in connection with this Application.

Date Issued:

June 22, 2012

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 21 (2012)

Application:

Application for the approval of a change in the rates to be charged for the supply of power and energy to certain customers on the Island Interconnected System, L’Anse au Loup System and the Isolated Rural Systems.

Decision:

1.    The interim rates approved in Order No. P.U. 29(2011) as set out in Schedule A to this Order, are approved on a final basis.

2.    The rates proposed by Hydro for Rate Classes 1.1, 1.1S, 2.1, 2.2, 2.3, 2.4 and 4.1 and Rate Classes 1.2D, 1.2DS,  2.1D, 2.2D and 4.1D, to be effective on all electrical consumption on and after July 1, 2012, as set out in Schedule B to this Order, are approved.

3.    Hydro shall pay the expenses of the Board incurred in connection with this Application.

Date Issued:

June 27, 2012

 

 

Newfoundland Power Inc                                                                     P.U. 22 (2012) Amended

Application:

Application for approval of a capital expenditure to supplement the Allowance for Unforeseen Items for the construction and purchase of certain improvements and additional to its property.

Decision:

1.    The addition of a supplementary amount of $315,000 to the Unforeseen Allowance approved in Order No. P. U. 26(2011) is approved.

2.    Newfoundland Power shall pay all expenses of the Board arising from this Application.

Date Issued:

July 19, 2012

 

 

Newfoundland Power Inc                                                                                     P.U. 23 (2012)

Application:

Application for approval of a Contribution in Aid of Construction to provide three-phase electrical service to Vista Enterprises Ltd.

Decision:

1.    The Contribution in Aid of Construction of seventy-two thousand one hundred thirty-eight dollars and thirty-three cents ($72,138.33), excluding HST, to apply to Vista Enterprises Ltd., is approved.

2.    Newfoundland Power shall pay all expenses of the Board arising from this Application.

Date Issued:

July 19, 2012

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 24 (2012)

Application:

Application for the approval of the construction of improvements and refurbishment of the Cat Arm Road.

Decision:

1.    The proposed capital expenditure of $492,100 for the refurbishment of the Cat Arm Road is approved.

2.    Hydro shall provide a status report on the application for a Crown Easement no later than its 2012 Capital Expenditure Report.

3.    Hydro shall not include the expenditure in its rate base until the Board has confirmed in writing that to do so would be consistent with generally accepted sound public utility practice.

4.    Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

August 3, 2012

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 25 (2012)

Application:

Application for the approval of the Stephenville Gas Turbine Alternator Rewind and Upgrade.

Decision:

1.    The proposed capital expenditure of $5,192,600 for the Stephenville Gas Turbine alternator stator rewind and associated work is approved.

2.    Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

August 16, 2012

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 26 (2012)

Application:

Application for the approval of the increase in generating capacity at Mary’s Harbour.

Decision:

1.    The proposed capital expenditure of $1,616,500 to increase the generating capacity at the Mary’s Harbour Generating Station is approved.

2.    Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

August 16, 2012

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 27 (2012)

Application:

Application for the approval of the refurbishment of the Cat Arm Dams.

Decision:

1.  The proposed capital expenditure of $3,155,000 for the refurbishment of the Cat Arm Dams is approved.

2.  Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

August 28, 2012

 

 

Newfoundland Power Inc                                                                                     P.U. 28 (2012)

Application:

Application for the approval to proceed with the construction and purchase of certain improvements and additions to its property.

Decision:

1.    The increase of $250,000 in Newfoundland Power’s 2012 Capital Budget is approved.

2.    The capital expenditure of $170,000 associated with the improvements and additions to Newfoundland Power’s property is approved.

3.    Newfoundland Power shall pay all expenses of the Board arising from this Application.

Date Issued:

September 4, 2012

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 29 (2012)

Application:

Application for the approval of the proposed regulatory treatment of asset retirement obligations.

Decision:

1.    Hydro shall appropriately recognize and record asset retirement obligations in accordance with IFRS.

2.   Approval of the regulatory treatment of the proposed asset retirement obligations is denied at this time.

3.    Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

October 2, 2012

 

 

Newfoundland Power Inc                                                                                     P.U. 30 (2012)

Application:

Application for the approval to proceed with the construction and purchase of certain improvements and additions to its property.

Decision:

1.    The proposed capital expenditure of $125,000 to replace the damaged underground municipal supply pipeline at Newfoundland Power’s Kenmount Road

Building is approved.

2.    Newfoundland Power shall pay all expenses of the Board arising from this Application.

Date Issued:

October 4, 2012

 

 

Newfoundland Power Inc                                                                                     P.U. 31 (2012)

Application:

Application for the approval of:

(a)          its 2013 Capital Budget of $80,788,000;

(b)          certain capital expenditures related to multi-year projects commencing in 2013; and

(c)          fixing and determining its average rate base for 2011 in the amount of $876,356,000.

Decision:

1.    Newfoundland Power’s 2013 capital purchases and construction projects in excess of $50,000, as set out in Schedule A to this Order, are approved.

2.    Newfoundland Power’s multi-year capital purchases and construction of additions to its property in the amount of $3,853,000 in 2014, as set out in Schedule B

to this Order, are approved.

3.    The 2013 Capital Budget for improvements and additions to Newfoundland Power’s property in an amount of $80,788,000 is approved, as set out in Schedule C.

4.    The average rate base for the year ending December 31, 2011 is hereby fixed and determined at $876,356,000.

5.    Unless otherwise directed by the Board, Newfoundland Power shall file an annual report to the Board on its 2013 capital expenditures by March 1, 2014.

6.    Unless otherwise directed by the Board, Newfoundland Power shall provide, in conjunction with the 2014 Capital Budget Application, a status report on the 2013

capital budget expenditures showing for each project:

(i)     the approved budget for 2013;

(ii)   the expenditures prior to 2013;

(iii) the 2013 expenditures to the date of the application;

(iv)  the remaining projected expenditures for 2013;

(v)    the variance between the projected total expenditures and the approved budget; and

(vi)  an explanation of the variance.

7.  Newfoundland Power shall pay all costs and expenses of the Board incurred in connection with the Application.

Date Issued:

October 10, 2012

 

 

Newfoundland Power Inc                                                                                     P.U. 32 (2012)

Application:

General Rate Application to establish customer electricity rates effective March 1, 2013.

Decision:

1.    The registered Intervenors, the Schedule of Dates, and the Rules of Procedure for the hearing of the Application are as set out in Appendix “A” to this Order.

Date Issued:

October 11, 2012

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 33 (2012)

Application:

Application for approval of a contribution in aid of construction for a line extension to serve a cottage area known as West Bottom North located near South Brook Junction

Decision:

1.    The contribution in aid of construction of four thousand eight hundred and eighteen dollars and eighty-five cents ($4,818.85), excluding HST, for the supply of single-phase electrical service to Domestic Customers located in a cottage area known as West Bottom North located near South Brook Junction, as calculated under the CIAC Policy is approved.

2.    A deviation from the CIAC Policy is approved such that the payment of refunds to the Customers is suspended until such time as the shortfall of nineteen thousand three hundred and nine dollars and twenty cents ($19,309.20) is recovered.

3.    Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

October 31, 2012

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 34 (2012)

Application:

Application for approval of a contribution in aid of construction for a three-phase line extension to serve a Waste Water Treatment Plant located in Happy Valley-Goose Bay.

Decision:

1.    The contribution in aid of construction of twenty thousand four hundred and twenty dollars ($20,420), excluding HST, to apply to the Town of Happy Valley-Goose Bay for a waste water treatment plant is approved.

2.    Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

November 8, 2012

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 35 (2012)

Application:

Application for approval to proceed with the construction and purchase of certain improvements to the roof at Hydro Place.

Decision:

1.    The proposed capital expenditure of $199,700 to replace the damaged mechanical penthouse section of the Hydro Place roof is approved.

2.    Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

November 15, 2012

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 36 (2012)

Application:

Application for approval, on an ex parte basis, to proceed with the lease of accommodations in Makkovik, Labrador pursuant to Section 41 of the Act.

Decision:

1.    The proposed one-year lease of residential accommodations in Makkovik in an amount not to exceed $9,000 per year, plus HST, is approved.

2.    Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

November 15, 2012

 

 

Newfoundland Power Inc.                                                                                    P.U. 37 (2012)

Application:

Application for the approval of a Contribution in Aid of Construction for a line extension to serve Domestic Customers in the cottage area known as Middle Three Island Pond located near the Town of Torbay.

Decision:

1.    The Non-Refundable Contribution in Aid of Construction of five thousand one hundred fifty dollars and ten cents ($5,150.10), excluding HST, to apply to Domestic Customers located in the cottage area known as Middle Three Island Pond is approved.

2.    Newfoundland Power shall pay all expenses of the Board arising from this Application.

Date Issued:

November 30, 2012

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 38 (2012)

Application:

Application for approval, on an ex parte basis, to proceed with the lease of accommodations in Postville, Labrador pursuant to Section 41 of the Act.

Decision:

1.    The proposed one-year lease of residential accommodations in Postville in an amount not to exceed $10,850 per year, plus HST, is approved.

2.    Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

December  20, 2012

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 39 (2012)

Application:

Application for approval of changes in the Utility Rates Schedule for the supply of power and energy to Newfoundland Power Inc.

Decision:

1.    The proposed changes in the Utility Rate Schedule, including the use of the updated peak demand weather adjustment model, as set out in Schedule A to this Order, are approved.

2.    Hydro shall pay the expenses of the Board incurred in connection with this Application.

Date Issued:

December  21, 2012

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 40 (2012)

Application:

Application for approval of changes in depreciation methodology and asset service lives pursuant to Section 68 of the Act.

Decision:

1.    Hydro shall adopt the straight line method of depreciation for all its assets, with group accounting methods using average service life procedure and applied on a remaining life basis, as outlined in the Gannett Fleming study filed with the Board on December 3, 2012 and December 17, 2012.

2.    Hydro shall provide, at the time of its next depreciation study, a report on group accounting for selected groups of property as outlined in Schedule 1.

3.    Hydro shall pay the costs of the Industrial Customers in the amount of $55,000.

4.    Hydro shall pay all costs and expenses of the Board incurred in connection with the Application.

Date Issued:

December  31, 2012


Newfoundland and Labrador Hydro                                                                     P.U. 1 (2011)

Application:

Application for approval of changes to the Rate Stabilization Plan rules and formulae.

Decision:

1.       The Board approves a modification to the Load Variation provision of the RSP rules to reduce the balance of the RSP attributable to the Industrial Customer load variation in the amount of $10,000,000, effective September 30, 2010.

2.       The Board approves Hydro’s application to reimburse the $10,000,000 to the Government of Newfoundland and Labrador.

3.       The Board approves on an interim basis the Rate Stabilization Plan rules as attached in Schedule “A”.

4.       Hydro shall pay the expenses of the Board incurred in connection with this matter.

Date Issued:

January 19, 2011

 

 

 

Newfoundland and Labrador Hydro                                                                     P.U. 2 (2011)

Application:

Application for approval of a contribution in aid of construction to provide single phase electrical service to serve the Labrador City Landfill Site.

Decision:

1.       The contribution in aid of construction of two hundred fifty-six thousand nine hundred seventy-nine dollars and eighteen cents ($256,979.18), including HST, for the construction of a 46 kV substation and 200 metre single phase distribution line to serve Labrador City Landfill Site is approved.

2.       Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

January 19, 2011

 

 

Newfoundland and Labrador Hydro                                                     P.U. 2 (2011) Amended

Application:

Application for approval of a contribution in aid of construction to provide single phase electrical service to serve the Labrador City Landfill Site.

 Decision:

1.       The contribution in aid of construction of two hundred fifty-six thousand nine hundred seventy-nine dollars and eighteen cents ($256,979.18), including HST, for the construction of a 46 kV substation and 200 metre single phase distribution line to serve Labrador City Landfill Site is approved.

2.       Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

February 2, 2011

 

 

Newfoundland Power Inc                                                                                       P.U. 3 (2011)

Application:

Application for approval of: (i) revised distribution line costs per metre for Contributions in Aid of Construction (CIACs); (ii) revised distribution plant upgrade cost for CIACs; and (iii) revised CIAC cost factors.

Decision:

1.       The revised cost factors submitted with the Application and contained in Schedules A, B, C and D attached to this Order are approved to be used in the calculation of all CIACs with effect from March 1, 2011 and, where advantageous to customers of Newfoundland Power, on all CIACs quoted but unpaid as of March 1, 2011.

2.       Newfoundland Power submit a revised CIAC Policy in its entirety incorporating the revisions approved herein.

3.       Newfoundland Power shall pay the expenses of the Board arising from this Application.

Date Issued:

February 21, 2011

 

 

Newfoundland Power Inc                                                                       P.U. 3 (2011) Amended

Application:

Application for approval of: (i) revised distribution line costs per metre for Contributions in Aid of Construction (CIACs); (ii) revised distribution plant upgrade cost for CIACs; and (iii) revised CIAC cost factors.

 Decision:

1.       The revised cost factors submitted with the Application and contained in Schedules A, B, C and D attached to this Order are approved to be used in the calculation of all CIACs with effect from March 1, 2011 and, where advantageous to customers of Newfoundland Power, on all CIACs quoted but unpaid as of March 1, 2011.

2.       Newfoundland Power submit a revised CIAC Policy in its entirety incorporating the revisions approved herein.

3.       Newfoundland Power shall pay the expenses of the Board arising from this Application.

Date Issued:

March 9, 2011

 

 

Newfoundland and Labrador Hydro                                                                     P.U. 4 (2011)

Application:

Application for approval for the deferred recovery of 2011 costs associated with the energy conservation program.

Decision:

1.       The deferred recovery of the 2011 costs related to the Conservation Plan, estimated to be $840,000.00 is approved.

2.       Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

March 10, 2011

 

 

Newfoundland and Labrador Hydro                                                                     P.U. 5 (2011)

Application:

Application for approval for the approval for the lease of accommodations in Labrador West for its Operations pursuant to Section 41 of the Act.

Decision:

1.       The Application to enter into a one-year lease of residential accommodations in Labrador City or Wabush in an amount not to exceed $60,000 per year, plus HST, is approved.

2.       Hydro shall file a copy of the executed lease with the Board.

3.       Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

March 18, 2011

 

 

Newfoundland and Labrador Hydro                                                                     P.U. 6 (2011)

Application:

Application for the approval of certain rules and regulations pertaining to the supply of electrical power and energy to one of its industrial customers, Corner Brook Pulp and Paper Limited

Decision:

1.       An extension to the Service Agreement for Corner Brook Pulp and Paper until July 15, 2011 is approved.

2.       Hydro shall file an application for the approval of the Service Agreement for Corner Brook Pulp and Paper no later than June 15, 2011.

3.       Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

March 24, 2011

 

 

Newfoundland Power Inc                                                                                       P.U. 7 (2011)

Application:

Application for an Order of the Board providing for disposition of the balance in the Demand Management Incentive Account pursuant to Sections 58 and 80 of the Act.

Decision:

1.       The disposition of the 2010 balance in the Demand Management Incentive Account and related income tax effects by means of a credit in the amount of $994,207 to the Rate Stabilization Account as of March 31, 2011 is approved.

2.       Newfoundland Power shall pay all costs and expenses of the Board in connection with this Application.

Date Issued:

March 24, 2011

 

Newfoundland Power Inc                                                                                       P.U. 8 (2011)

Application:

Application for the approval of proposals arising from a review of its retail rates

Decision:

1.       The Optional Seasonal Rate, as set out in Schedule A to this order, to be effective July 1, 2011 is approved.

2.       The Optional Seasonal Rate Revenue and Cost Recovery Account, as defined in Schedule B to this order, is approved.

3.       The proposed supplementary 2011 capital expenditure of $125,000 to facilitate implementation of the Optional Seasonal Rate is approved.

4.       Newfoundland Power shall pay all costs and expenses of the Board in connection with this Application.

Date Issued:

April 13, 2011

 

 

Newfoundland Power Inc                                                                                       P.U. 9 (2011)

Application:

Application for approval of the balance of the Weather Normalization Reserve as of December 31, 2010

Decision:

1.       The Board approves, pursuant to Sections 69(3) and 78 of the Act, Newfoundland Power’s weather normalization reserve of a Positive Balance of $1,954,953 as of December 31, 2010.

2.       Newfoundland Power shall pay all costs and expenses of the Board in connection with this Application.

Date Issued:

April 26, 2011

 

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 10 (2011)

Application:

Application for approval of the Rate Stabilization Plan component of the rates to be charged to Newfoundland Power Inc.

Decision:

1.       The rates to be charged by Hydro to Newfoundland Power as set out in Schedule "A" to be effective for consumption on or after July 1, 2011 are approved on an interim basis.

2.       Hydro shall pay the expenses of the Board incurred in connection with this matter.

Date Issued:

May 27, 2011

 

 

Newfoundland Power Inc                                                                                     P.U. 11 (2011)

Application:

Application for approval of capital expenditures for the construction and purchase of certain improvements and additions to its property at the Port Union and Lawn hydro electric generating plants pursuant to Section 41 of the Act; and for consent to remove from service a diesel electric generator located at Port Union pursuant to Section 38 of the Act.

Decision:

1.       The proposed capital expenditure in the amount of $1,800,000 to repair Newfoundland Power’s hydro electric generating plants at Port Union and Lawn is approved

2.       The Board consents to the removal from service of the diesel electric generator at Newfoundland Power’s Port Union hydro electric generating plant.

3.       Newfoundland Power shall pay all costs and expenses of the Board in connection with this Application.

Date Issued:

May 30, 2011

 

 

Newfoundland Power Inc                                                                                     P.U. 12 (2011)

Application:

Pursuant to Section 70 of the Act for approval of rate stabilization and municipal tax adjustments for the period July 1, 2011 to June 30, 2012 and a schedule of rates, tolls and charges incorporating the rate stabilization and municipal tax adjustments and a schedule of rates for use in a time of day rate study.

Decision:

1.       The Rate Stabilization Adjustment of 1.010 cents/kWh is approved for the period of July 1, 2011 to June 30, 2012.

2.       The Municipal Tax Adjustment Factor of 1.02586 is approved for the period of July 1, 2011 to June 30, 2012.

3.       Newfoundland Power’s Schedule of Rates, Tolls and Charges, as set out in Schedule A to this Order, to be effective on all electrical consumption on and after July 1, 2011, is approved.

4.       Newfoundland Power’s Schedule of Rates, Tolls and Charges, for customers participating in the time of day rate study, as set out in Schedule B to this Order to be effective on all electrical consumption on and after December 1, 2011, is approved.

5.       Newfoundland Power shall pay the expenses of the Board in connection with this Application.

Date Issued:

June 22, 2011

 

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 13 (2011)

Application:

Pursuant to Section 70(1) of the Act for the approval of a change in rates to be charged for the supply of power and energy to Island Interconnected customers (excluding Burgeo School and Library) and Isolated Rural customers (excluding Government departments).

Decision:

1.       The rates proposed by Hydro for its Island Interconnected customers (Rate Class 1.1, 2.1, 2.2, 2.3, 2.4 and 4.1) and Isolated Rural customers (Rate Class 1.2D, 2.1D, 2.2D and 4.1D), to be effective on all electrical consumption on and after July 1, 2011, as set out in Schedule A to this Order, are approved.

2.       Hydro shall pay the expenses of the Board incurred in connection with this Application.

Date Issued:

June 22, 2011

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 14 (2011)

Application:

Pursuant to Section  70(1) of the Act for the approval of Optional Seasonal Rates for its Island Interconnected customers and for customers served from the L’Anse au Loup System and for Isolated Diesel (Non-Government, First Block) customers.

Decision:

1.       The Optional Seasonal Rate, as set out in Schedule A to this Order, to be effective July 1, 2011, is approved.

2.       Hydro shall pay all costs and expenses of the Board in connection with this matter.

Date Issued:

June 28, 2011

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 15 (2011)

Application:

Pursuant to Section 71 of the Act, for approval of certain rules and regulations pertaining to the supply of electrical power and energy to one of its industrial customers, Corner Brook Pulp and Paper Limited.

Decision:

1.       An extension to the Service Agreement for Corner Brook Pulp and Paper Limited, as set out in Schedule “A” attached, is approved on a pilot basis until a further Order of the Board.

2.       Hydro shall include in the filing of its next general rate application, but no later than December 31, 2011, a request for the approval of the demand credit Service Agreement for Corner Brook Pulp and Paper Limited and shall attach a report that will include:

                                                                          i.            a review of the pilot project from May 2009 to forecast year-end 2013;

                                                                        ii.            an analysis of the potential and resulting fuel savings at Holyrood since the beginning of the pilot project to forecast year-end 2013;

                                                                      iii.            consideration of potential changes in the efficiency factor at Holyrood over the term of the pilot project to forecast year-end 2013;

                                                                       iv.            an analysis of the resulting impact on the activity in the Rate Stabilization Plan to the year-end 2013; and

                                                                         v.            consideration of the potential and resulting changes in the allocation of costs in the revenue requirement for any test year included in the above time frame.

3.       Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

July 8, 2011

 

 

Newfoundland Power Inc                                                                                     P.U. 16 (2011)

Application:

Pursuant to Section 41(5) of the Act for the approval of a Contribution in Aid of Construction for a line extension to serve Domestic Customers residing in the cottage area known as Double Pond located in the Mahers area on the Avalon Peninsula.

Decision:

1.       The Non-Refundable contribution in aid of construction of three thousand five dollars and ninety-eight cents ($3,005.98), excluding HST, as calculated under the Policy, to apply to Domestic Customers located in the cottage area known as Double Pond is approved.

2.       Newfoundland Power shall pay all expenses of the Board arising from this Application.

Date Issued:

July 15, 2011

 

 

Newfoundland Power Inc                                                                                     P.U. 17 (2011)

Application:

Pursuant to Section 48 of the Act for an Order approving the sale by Newfoundland Power of certain support structures to Bell Aliant Regional Communications Inc.

Decision:

1.       The Application is denied.

2.       Newfoundland Power shall pay all expenses of the Board arising from this Application.

Date Issued:

July 27, 2011

 

 

Newfoundland Power Inc                                                                                     P.U. 18 (2011)

Application:

Pursuant to Section 41(5) of the Act for the approval of a Contribution in Aid of Construction for a line extension to serve Domestic Customers residing in the cottage area known as Rocky Pond located in the Southern Shore of the Avalon Peninsula.

Decision:

1.       The Non-Refundable Contribution in Aid of Construction of two thousand one hundred and ninety-six dollars and eighty-eight cents ($2,196.88), excluding HST, to apply to Domestic Customers located in the cottage area known as Rocky Pond is approved.

2.       Newfoundland Power shall pay all expenses of the Board arising from this Application.

Date Issued:

August 18, 2011

 

 

Newfoundland Power Inc                                                                                     P.U. 19 (2011)

Application:

Pursuant to Section 41(5) of the Act for the approval of a Contribution in Aid of Construction for a line extension to serve Domestic Customers residing in the cottage area known as Muddy Hole located on the Burin Peninsula.

Decision:

1.       The Non-Refundable Contribution in Aid of Construction of ten thousand four hundred and twenty-two dollars and ninety cents ($10,422.90), excluding HST, to apply to Domestic Customers located in the cottage area known as Muddy Pond is approved.

2.       Newfoundland Power shall pay all expenses of the Board arising from this

Date Issued:

August 18, 2011

 

 

Newfoundland and Labrador Hydro                                                   P.U. 20 (2011) Amended

Application:

For approval to upgrade the Unit 1 stack breeching and the fuel oil storage facility at the Holyrood Thermal Generating Station pursuant to Subsection 41(3) of the Act.

Decision:

1.       The proposed capital expenditure of $133,700 to replace the support structures for the Unit 1 stack breeching at the Holyrood Thermal Generating Station is approved.

2.       Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

September 9, 2011

 

 

Newfoundland Power Inc                                                                                     P.U. 21 (2011)

Application:

Pursuant to Section 48 of the Act for an Order approving the sale by Newfoundland Power Inc. of certain support structures to Bell Aliant Regional Communications Inc. and Order No. P. U. 17(2001) and an application by Newfoundland Power Inc. pursuant to Section 28 of the  Board of Commissioners of Public Utilities Regulations, 1996 to re-open and/or rehear the application to receive further evidence.

Decision:

1.       The proposed sale to Bell Aliant by Newfoundland Power of certain joint use support structures as provided for in the Purchase Agreement is approved.

2.       Newfoundland Power shall pay the expenses of the Board arising from this Application.

Date Issued:

September 28, 2011

 

 

Newfoundland Power Inc                                                                                     P.U. 22 (2011)

Application:

Pursuant to Sections 58 and 80 of the Act for an Order approving the deferred recovery of certain costs for 2012.

Decision:

1.       The deferred recovery of $2,363,000 in 2012 due to the conclusion in 2010 of the Amortizations is approved until a further Order of the Board.

2.       The proposed definition of the 2011 and 2012 Cost Deferral Account, as set out in Schedule “A” to this Order, is approved.

3.       Newfoundland Power shall pay the expenses of the Board arising from this Application.

Date Issued:

October 27, 2011

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 23 (2011)

Application:

For approval of a capital expenditure of $600,000 for the upgrade of the access road to the Bay d’Espoir Hydroelectric Generating Station pursuant to subsection 41(3) of the Act.

Decision:

1.       The Application is denied.

2.       Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

November 1, 2011

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 24 (2011)

Application:

For approval of a Contribution in Aid of Construction for a single-phase line extension to serve a Service NL Weigh Scale on Route 500 near Wabush pursuant to Section 41 of the Act.

Decision:

1.       The Contribution in Aid of Construction of ninety-one thousand four hundred and ninety dollars ($91,490), excluding HST, to apply to the Government of Newfoundland and Labrador, represented by Service NL, is approved.

2.       Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

December 12, 2011

 

 

Newfoundland Power Inc                                                                                     P.U. 25 (2011)

Application:

Pursuant to Sections 80 of the Act for an Order on the automatic adjustment formula for fixing and determining the rate of return on rate base for Newfoundland Power Inc.

Decision:

1.       The operation of the Formula to establish a rate of return on rate base for Newfoundland Power for 2012 is suspended.

2.       The continued use of the current rate of return on rate base for Newfoundland Power of 7.96% in a range of 7.78% to 8.14% until a further Order of the Board is approved on an interim basis.

3.       The continued use of the current Customer Rates approved by Order No. P. U. 12(2011) is approved on an interim basis, with effect from January 1, 2012.

4.       The process and timing to be followed to determine a just and reasonable rate of return on rate base for Newfoundland Power for 2012 and with respect to the filing of Newfoundland Power’s next general rate application shall be established by a further direction of the Board.

5.       Newfoundland Power shall pay all expenses of the Board arising from this Application.

Date Issued:

December 13, 2011

 

 

Newfoundland Power Inc                                                                                     P.U. 26 (2011)

Application:

Application for approval of its:

(a)       2012 Capital Budget of $77,293,000; and

(b)       fixing and determining its average rate base for

2010 in the amount of $875,210,000.

Decision:

1.       Newfoundland Power’s capital purchases and construction projects in excess of $50,000, as set out in Schedule A to this Order, are approved.

2.       Newfoundland Power’s capital purchases and construction of additions to its property in the amount of $7,745,000 in 2013 and $150,000 in 2014, for multi-year projects as set out in Schedule B to this Order, are approved.

3.       Newfoundland Power’s lease of improvements to its property in the amount of $80,000 per year, as set out in Schedule C to this Order, is approved.

4.       The 2012 Capital Budget for improvements and additions to Newfoundland Power’s property in an amount of $77,293,000 is approved.

5.       The average rate base for the year ending December 31, 2010 is hereby fixed and determined at $875,210,000.

6.       Newfoundland Power shall adjust its 2011 rate base with respect to the recovery of hearing costs recorded in 2010, Cost Recovery Deferral – Hearing Costs, so that over the allowed three-year period $750,000 in deferred costs, as ordered in Order No. P. U. 43(2009), will be recovered.

7.       Unless otherwise directed by the Board, Newfoundland Power shall file an annual report to the Board on its 2012 capital expenditures by March 1, 2013.

8.       Unless otherwise directed by the Board, Newfoundland Power shall provide, in conjunction with the 2013 Capital Budget Application, a status report on the 2012 capital budget expenditures showing for each project:

(i)                 the approved budget for 2012;

(ii)               the expenditures prior to 2012;

(iii)             the 2012 expenditures to the date of the Application;

(iv)              the remaining projected expenditures for 2012;

(v)                the variance between the projected total expenditures and the approved budget; and

(vi)              an explanation of the variance.

9.       Newfoundland Power shall pay all costs and expenses of the Board incurred in connection with the Application.

Date Issued:

December 13, 2011

 

 

Newfoundland Power Inc                                                                                     P.U. 27 (2011)

Application:

Pursuant to Sections 58 of the Act for an Order to adopt United States generally accepted accounting principles for regulatory purposes effective January 1, 2012.

Decision:

1.       The adoption of United States generally accepted accounting principles (“U.S. GAAP”) by Newfoundland Power for general regulatory purposes as proposed in the Application is

approved effective January 1, 2012.

2.       Newfoundland Power shall apply to the Board for approval of changes to existing regulatory assets and liabilities and the creation of any new regulatory assets and liabilities,

along with appropriate definitions of the accounts related to these regulatory assets and liabilities, that will be required to effect the adoption of U.S. GAAP.

3.       Newfoundland Power shall no longer file monthly updates on International Financial Reporting Standards (“IFRS”) as ordered by Order No. P. U. 43(2009).

4.       Newfoundland Power shall pay all expenses of the Board arising from this Application.

Date Issued:

December 15, 2011

 

Newfoundland Power Inc                                                                                     P.U. 28 (2011)

Application:

Pursuant to Section 41(5) of the Act for the approval of a Contribution in Aid of Construction for a line extension to serve Domestic Customers residing in the cottage area known as

Coles Pond located on the Southern Shore.

Decision:

1.       The Refundable Contribution in Aid of Construction of four thousand three hundred and twenty-six dollars ($4,326.00), excluding HST, to apply to Domestic Customers located

in the cottage area known as Coles Pond Cottage Area on the Southern Shore is approved.

2.       Newfoundland Power shall pay all expenses of the Board arising from this Application.

Date Issued:

December 20, 2011

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 29 (2011)

Application:

Application by Newfoundland and Labrador Hydro for approval of interim rates to be charged for the supply of power and energy to Island Interconnected customers (excluding Burgeo

School and Library) and Isolated Rural Customers (excluding Government departments)pursuant to Subsection 70(1) of the Act.

Decision:

1.       The continued use of Hydro’s rates for its Island Interconnected customers (Rate Class 1.1, 1.1S, 2.1, 2.2, 2.3, 2.4 and 4.1) and Isolated Rural customers (Rate Class 1.2D, 1.2DS, 2.1D, 2.2D and 4.1D),

to be effective on an interim basis on all electrical consumption on and after January 1, 2012, as set out in Schedule “A”, are approved.

2.       Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

December 20, 2011


Newfoundland and Labrador Hydro                                                                     P.U. 1 (2010)

Application:

Application for approval of (a) its 2010 Capital Budget of $52,775,000; (b) its 2010 capital purchases and construction projects in excess of $50,000; (c) the proposed estimated contributions in aid of construction for 2010; and (c) fixing and determining its average rate base for 2008 in the amount of $1,489,786,000, pursuant to Sections 41 and 78 of the Act.

Decision:

1.       Pursuant to Section 41 of the Act Hydro’s proposed capital purchases and construction projects in excess of $50,000 are approved, as set out in Schedule A to this Order.

2.       Pursuant to Section 41 of the Act the 2010 Capital Budget for improvements and additions to Hydro’s property in an amount of $ 52,775,000 is approved.

3.       The project Upgrade Plant Access Road – Bay d’Espoir (Page B-10): $1,550,000 is approved but the costs for this project shall not be recovered from customers unless otherwise ordered by the Board.

4.       Unless otherwise directed by the Board Hydro shall file an annual report to the Board on its 2010 capital expenditures by March 1, 2011.

5.       Unless otherwise directed by the Board Hydro shall file a report on April 15, 2010 in relation to supplementary capital budget applications and carryovers associated with the 2009 capital budget.

6.       Unless otherwise directed by the Board Hydro shall provide, in conjunction with the 2011 Capital Budget Application, a status report on the 2010 capital budget expenditures showing for each project:

                                                                          i.            the approved budget for 2010;

                                                                        ii.            the expenditures prior to 2010;

                                                                      iii.            the 2010 expenditures to the date of the application;

                                                                       iv.            the remaining projected expenditures for 2010;

                                                                         v.            the variance between the projected total expenditures and the approved budget; and

                                                                       vi.            an explanation of the variance.

7.       Pursuant to Section 78 of the Act the rate base for the year ending December 31, 2008 is hereby fixed and determined at $1,489,786,000.

8.       Hydro shall pay all costs and expenses of the Board incurred in connection with the Application.

Date Issued:

January 22, 2010

 

 

Nalcor Energy                                                                                                        P.U. 2 (2010)

Application:

Application for an order to establish the terms of a water management agreement between Nalcor Energy and Churchill Falls (Labrador) Corporation Limited for the Churchill River, Labrador.

Decision:

1.       The Registered Intervenors in this proceeding are as set out in the attached Schedule “A” to this Order.

Date Issued:

January 22, 2010

 

 

Newfoundland Power Inc.                                                                                      P.U. 3 (2010)

Application:

Application for approval of a contribution in aid of construction for a single-phase extension to serve Central Newfoundland Waste Management Authority pursuant to ss. 41(5) of the Act.

Decision:

1.       The contribution in aid of construction of $55,700.00, excluding HST, as proposed by Newfoundland Power to provide single-phase service to a water management facility for the Central Newfoundland Waste Management Authority is approved.

2.   Newfoundland Power shall pay all the expenses of the Board arising from this Application.

Date Issued:

January 27, 2010

 

 

Newfoundland Power Inc.                                                                                      P.U. 4 (2010)

Application:

Application for approval to proceed with the construction and purchase of certain improvements and additions to Newfoundland Power’s property (extension of a distribution feeder on the Avalon Peninsula to meet the temporary service requirements of Vale Inco Newfoundland & Labrador Limited, a division of Vale Inco) pursuant to ss. 41(3) of the Act.

Decision:

1.       The proposed capital expenditure of $330,500 to proceed with the construction of the improvements and additions to Newfoundland Power’s distribution feeder along Route 101 in Long Harbour is approved.

2.       Newfoundland Power shall pay all the expenses of the Board arising from this Application.

Date Issued:

January 28, 2010

 

 

Nalcor Energy                                                                                                        P.U. 5 (2010)

Application:

Application for an order to establish the terms of a water management agreement between Nalcor Energy and Churchill Falls (Labrador) Corporation Limited for the Churchill River, Labrador. (Intervenor Costs)

Decision:

1.       No order in relation to costs will be made at this time.

Date Issued:

January 29, 2010

 

 

Nalcor Energy                                                                                                        P.U. 6 (2010)

Application:

Application for an order to establish the terms of a water management agreement between Nalcor Energy and Churchill Falls (Labrador) Corporation Limited for the Churchill River, Labrador. (Claims of Confidentiality)

Decision:

1.       The Guaranteed Winter Availability Contract and the Shareholders’ Agreement will be placed on the record but will be considered to be confidential.

2.       The terms and conditions of the release of documents considered confidential will be determined by the Board on a receipt of a request for disclosure.

Date Issued:

February 4, 2010

 

 

Newfoundland Power Inc.                                                                                      P.U. 7 (2010)

Application:

Application for approval of:

                                                              i.      revised distribution line cost per metre for Contributions in Aid of Construction (CIAC’s);

                                                            ii.      revised distribution plant upgrade cost for CIAC’s; and

                                                          iii.      revised CIAC cost factors.

Decision:

1.       The revised cost factors submitted with the Application and contained in Schedules “A”, “B”, “C” and “D” attached to this Order are approved to be used in the calculation of all CIAC’s with effect from March 3, 2010, and, where advantageous to customers of Newfoundland Power, on all CIAC’s quoted but unpaid as of March 3, 2010.

2.       Newfoundland Power submit a revised CIAC Policy in its entirety incorporating the revisions approved herein.

Date Issued:

February 24, 2010

 

 

Nalcor Energy                                                                    P.U. 8 (2010)    Reason for Decision

Application:

Application for an order to establish the terms of a water management agreement between Nalcor Energy and Churchill Falls (Labrador) Corporation Limited for the Churchill River, Labrador. (Final Order)

Decision:

1.       The terms of the water management agreement between Nalcor Energy and Churchill Falls (Labrador) Corporation Limited, attached as Schedule A, are established.

2.       The parties may apply to the Board for an order in relation to costs within 30 days of the date of the Board’s Reasons for Decision in respect of this Order.

3.       Nalcor Energy shall pay all the expenses of the Board arising from this Application.

Date Issued:

March 9, 2010

 

 

Newfoundland and Labrador Hydro                                                                     P.U. 9 (2010)

Application:

Application for approval of a contribution in aid of construction for a three-phase line extension to serve the College of the North Atlantic campus located at Labrador City, pursuant to ss. 41(5) of the Act.

Decision:

1.       The Board approves the contribution in aid of construction of Two hundred seventy-two thousand six hundred fifty-one dollars and fifteen cents ($272,651.15) including HST, as calculated under the Policy for the supply of three-phase electrical service to one general service customer, the College of the North Atlantic campus located at Labrador City, as requested by the provincial Department of Transportation and Works, pursuant to ss. 41(5) of the Act.

2.       Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

April 9, 2010

 

 

Newfoundland Power Inc.                                                                                    P.U. 10 (2010)

Application:

Application for approval of a contribution in aid of construction for a three-phase extension to serve Central Newfoundland Waste Management Authority, pursuant to ss. 41(5) of the Act.

Decision:

1.       The contribution in aid of construction of $162,660.42, excluding HST, as proposed by Newfoundland Power to provide three-phase service to a waste management facility near the Town of Norris Arm for the Central Newfoundland Waste Management Authority is approved.

2.       Newfoundland Power shall pay all expenses of the Board arising from this Application.

Date Issued:

April 9, 2010

 

 

Newfoundland Power Inc.                                                                                    P.U. 11 (2010)

Application:

Application for approval of the balance in the Weather Normalization Reserve as of December 31, 2009 pursuant to ss. 69(3) and 78 of the Act.

Decision:

1         The Board approves Newfoundland Power’s Weather Normalization Reserve of a negative balance of $3,918,970 as of December 31, 2009, pursuant to ss. 69(3) and 78 of the Act.

2         Newfoundland Power shall pay all costs and expenses of the Board in connection with this Application.

Date Issued:

April 12, 2010

 

 

Newfoundland Power Inc.                                                                                    P.U. 12 (2010)

Application:

Application for approval of an automatic adjustment formula for fixing and determining the rate of return on rate base for Newfoundland Power.

Decision:

1.       The risk free rate used to calculate the forecast cost of equity for use in the Automatic Adjustment Formula to establish Newfoundland Power’s annual rate of return on rate base for 2011 and 2012 shall be determined by adding:

i)        the average of the 3-month and 12-month forecast of 10-year Government of Canada Bonds as published by Consensus Forecasts in the preceding November; and

ii)      the average observed spread between 10-year and 30-year Government of Canada Bonds for all trading days in the preceding October.

2.   Newfoundland Power shall pay all expenses of the Board arising from this Application.

Date Issued:

April 20, 2010

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 13 (2010)

Application:

Application for the deferred recovery of 2010 costs associated with an energy conservation program.

Decision:

1.       The deferred recovery of 2010 costs related to the Conservation Plan, estimated to be $2.3 million is approved.

2.       Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

May 12, 2010

 

 

Newfoundland Power Inc.                                                                                    P.U. 14 (2010)

Application:

Approval of a contribution in aid of construction (“CIAC”) for a three-phase supply for the Long Range Regional Economic Development Board.

Decision:

1.       The contribution in aid of construction of Two hundred three thousand three hundred thirty-two dollars and thirty-nine cents ($203,332.39) excluding HST, as proposed by Newfoundland Power to provide a three-phase supply to the area between the communities of McKay’s and Maidstone for the Long Range Regional Economic Development Board is approved.

2.       Newfoundland Power shall pay all expenses of the Board arising from this Application.

Date Issued:

May 28, 2010

 

 

Newfoundland Power Inc.                                                                                    P.U. 15 (2010)

Application:

Approval of a contribution in aid of construction (“CIAC”) for a line extension to serve Domestic Customers residing in the Gambo Pond Cottage Area near the Community of Gambo.

Decision:

1.       The Board approves the Non-Refundable CIAC of Two thousand five hundred forty-six dollars and forty-six cents ($2,504.46), excluding HST, as calculated under the Policy to apply to Domestic Customers located in the Cottage Area known as Gambo Pond, pursuant to ss. 41(5) of the Act.

2.       Newfoundland Power shall pay all expenses of the Board arising from this Application.

Date Issued:

May 28, 2010

 

 

Newfoundland Power Inc.                                                                                    P.U. 15 (2010) Amended

Application:

Approval of a contribution in aid of construction (“CIAC”) for a line extension to serve Domestic Customers residing in the Gambo Pond Cottage Area near the Community of Gambo.

Decision:

1.       The Board approves the Non-Refundable CIAC of Two thousand five hundred forty-six dollars and forty-six cents ($2,504.46), excluding HST, as calculated under the Policy to apply to Domestic Customers located in the Cottage Area known as Gambo Pond, pursuant to ss. 41(5) of the Act.

2.       Newfoundland Power shall pay all expenses of the Board arising from this Application.

Date Issued:

May 28, 2010

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 16 (2010)

Application:

Approval of the construction of a terminal station at Long Harbour, an extension to transmission line TL-208, and approval of a customer contribution associated with the project.

Decision:

1.       The proposed capital expenditure of $14.8 million for construction of the terminal station at Long Harbour and the extension to transmission line TL-208 is approved.

2.       The contribution from the customer, Vale Inco, in the amount of the final capital cost of the project is approved.

3.       Hydro shall pay all expenses of the  Board arising from this Application.

Date Issued:

May 28, 2010

 

 

Newfoundland Power Inc.                                                                                    P.U. 17 (2010)

Application:

Approval of a capital expenditure Allowance for Unforeseen Requirements for the construction and purchase of certain improvements and additions to its property.

Decision:

1.       The addition of a supplementary amount of $4,200,000 to the Allowance for Unforeseen Items approved in Order No. P.U. 41(2009) is approved.

2.       Newfoundland Power shall pay all the expenses of the Board arising from this Application.

Date Issued:

May 28, 2010

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 18 (2010)

Application:

Approval of the Rate Stabilization Plan component of the rates to be charged to Newfoundland Power Inc.

Decision:

1.       The rates to be charged by Hydro to Newfoundland Power, as set out in Schedule “A” to this Order, to be effective for electrical consumption on or after July 1, 2010, are approved.

2.       Hydro shall pay the expenses of the Board incurred in connection with this matter.

Date Issued:

June 18, 2010

 

 

Newfoundland Power Inc.                                                                                    P.U. 19 (2010)

Application:

Approval of:

(i)     the rate stabilization and municipal tax adjustments to be applied to the rates of Newfoundland Power Inc. for the period July 1, 2010 to June 30, 2011; and

(ii)   a schedule of rates, tolls and charges incorporating the rate stabilization and municipal tax adjustments.

Decision:

1.       The Rate Stabilization Adjustment of 0.230 cents/kWh and the Municipal Tax Adjustment factor of 1.02474 are approved.

2.       The proposed rates to customers of Newfoundland Power, as set out in Schedule A to this Order, are approved, to be effective on all electrical consumption on and after July 1, 2010.

3.       Newfoundland Power shall pay the expenses of the Board in connection with this Application.

Date Issued:

June 18, 2010

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 20 (2010)

Application:

Application for approval of a change in rates to be charged for the supply of power and energy to Island Interconnected customers (excluding Burgeo School and Library) and Isolated Rural customers (excluding Government departments).

Decision:

1.       The rates proposed by Hydro for its Island Interconnected customers (Rate Class 1.1, 2.1, 2.2, 2.3, 2.4 and 4.1) and Isolated Rural customers (Rate Class 1.2D, 2.1D, 2.2D and 4.1D), to be effective on all electrical consumption on and after July 1, 2010, as set out in Schedule A to this Order, are approved.

2.       Hydro shall pay the expenses of the Board incurred in connection with this Application.

Date Issued:

June 29, 2010

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 21 (2010)

Application:

Application for approval of a capital expenditure allowance for unforeseen requirements for the construction and purchase of certain improvements and additions to its property.

Decision:

1.       The Board approves an additional amount of $693,800 to be added to the Allowance for Unforeseen Items account approved in Order No. P.U. 1 (2010).

2.       Hydro shall pay all expenses of the Board arising from this Application

Date Issued:

July 7, 2010

 

 

Newfoundland Power Inc.                                                                                    P.U. 22 (2010)

Application:

Approval of:a contribution in aid of construction for Cottage Area Customers located on the Witless Bay Line

Decision:

1.       The Board approves the Non-Refundable CIAC of Four thousand two hundred nine dollars and seventy-one cents ($4,209.71), excluding HST, as calculated under the Policy to apply to Domestic Customers located in the Cottage Area known as Witless Bay Line  (Phase 3).

2.       Newfoundland Power shall pay all expenses of the Board arising from this Application.

Date Issued:

July 6, 2010

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 23 (2010)

Application:

Application for approval of a Contribution in Aid of Construction for a line extension to serve Domestic Customers residing in the Flatwater Pond Northeast Cottage Area near the community of Baie Verte.

Decision:

1.       The Board approves the Non-Refundable CIAC of three thousand eighty-six dollars and fifteen cents ($3,086.15), excluding HST, as calculated under the Policy to apply to Domestic Customers located in the Cottage Area known as Flatwater Pond Northeast.

2.       Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

July 6, 2010

 

 

Nalcor Energy                                                                                                      P.U. 24 (2010)

Application:

Application for an order to establish the terms of a water management agreement between Nalcor Energy and Churchill Falls (Labrador) Corporation Limited for the Churchill River, Labrador. Applications for an award of costs.

Decision:

1.       The Innus of Ekaunitshit and the Uashaunnaut will be awarded costs in an amount to be determined by the Board.

Date Issued:

July 21, 2010

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 25 (2010)

Application:

Application by Newfoundland and Labrador Hydro (“Hydro”) for approval of the rates to be charged to Industrial customers.

Decision:

The Board finds that in the circumstances its jurisdiction to make orders in relation to how the RSP operated in prior years is limited.  Given the manner in which this matter was brought forward the Board does not have the jurisdiction to change how Newfoundland Power’s RSP operated in prior years, either in terms of the rates charged or the resulting balances.  The Board does have the jurisdiction to issue an order which sets just and reasonable rates for the Industrial Customers for 2008 and 2009, including the Industrial Customers’ RSP rates and how the Industrial Customers RSP operated for those years.  The Board also finds that it has jurisdiction to determine whether any overpayment as a result of the interim rates is to be refunded to the Industrial Customers or placed in a reserve account to the benefit of the Industrial Customers.  Given these findings it is not necessary to make a determination at this time in relation to the 2007 year-end balance or the issues raised by Abitibi.  These matters will be addressed in the context of the setting of final rates by the Board for the Industrial Customers as of January 1, 2008 and the Board’s determination in relation to any resulting balances.

Date Issued:

August 26, 2010

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 26 (2010)

Application:

Application for approval of replacement of the jet fuel tank at Bay d’Espoir campsite, pursuant to Section 41(3) of the Act.

Decision:

1.       The proposed supplementary 2010 capital expenditure of $120,400 for the replacement of the fuel tank at the Bay D’Espoir campsite is approved.

2.       Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

September 24, 2010

 

 

Nalcor Energy                                                                                                     P.U. 27  (2010)

Application:

Application for an order to establish the terms of a water management agreement between Nalcor Energy and Churchill Falls (Labrador) Corporation Limited for the Churchill River, Labrador– Quantum of costs to be awarded in the Application.

Decision:

1.       Nalcor shall pay the Innus of Ekaunitshit costs in the amount of $7,000.00.

2.       Nalcor shall pay the Uashaunnaut costs in the amount of $7,000.00.

3.       Nalcor shall pay the expenses of the Board arising from this Application.

Date Issued:

October 12, 2010

 

 

Newfoundland Power Inc.                                                                                    P.U. 28 (2010)

Application:

Application for approval of its:

a)       2011 Capital Budget of $72,969,000; and

b)      fixing and determining its average rate base for2009 in the amount of $848,493,000.

Decision:

1.       Newfoundland Power’s capital purchases and construction projects in excess of $50,000, as set out in Schedule A to this Order, are approved.

2.       The 2011 Capital Budget for improvements and additions to Newfoundland Power’s property in an amount of $72,969,000 is approved.

3.       The average rate base for the year ending December 31, 2009 is hereby fixed and determined at $848,493,000.

4.       Unless otherwise directed by the Board, Newfoundland Power shall file an annual report to the Board on its 2011 capital expenditures by March 1, 2012.

5.       Unless otherwise directed by the Board, Newfoundland Power shall provide, in conjunction with the 2012 Capital Budget Application, a status report on the 2011 capital budget expenditures showing for each project:

                                                                             i.      the approved budget for 2011;

                                                                           ii.      the expenditures prior to 2011;

                                                                         iii.      the 2011 expenditures to the date of the Application;

                                                                          iv.      the remaining projected expenditures for 2011;

                                                                            v.      the variance between the projected total expenditures and the approved budget; and

                                                                          vi.      an explanation of the variance.

6.       Newfoundland Power shall pay all costs and expenses of the Board incurred in connection with the Application.

Date Issued:

November 15, 2010

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 29 (2010)

Application:

Application for approval of replacement of the Diesel Generating Unit 565 and associated switchgear at Little Bay Islands, pursuant to Section 41(3) of the Act.

Decision:

1.       The proposed supplementary 2010 capital expenditure of $467,900 for the replacement of the Diesel Generating Unit 565 and associated switchgear at Little Bay Islands is approved.

2.       Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

November 23, 2010

 

 

Newfoundland Power Inc.                                                                                    P.U. 30 (2010)

Application:

Application for an order approving the deferral recovery of certain costs for 2011, pursuant to Sections 58 and 80 of the Act.

Decision:

1.       The deferred recovery of $2,363,000 in 2011 due to the conclusion in 2010 of the Amortizations is approved until a further Order of the Board.

2.       The proposed definition of the 2011 Cost Deferral Account, as set out in Schedule “A” to this Order, is approved.

3.       Newfoundland Power shall pay all expenses of the Board arising from this Application.

Date Issued:

November 29, 2010

 

 

Newfoundland Power Inc.                                                                                    P.U. 31 (2010)    Reasons For Decision

Application:

Application for approval of a comprehensive proposal for the 2011 adoption of accrual accounting for other post employment benefit costs for Newfoundland Power Inc.

Decision:

1.       The Board approves:
(i) the adoption of the accrual method of accounting for OPEBs costs and income tax related to OPEBs effective January 1, 2011; and
(ii) the transitional balance of approximately $52.4 million dollars be amortized using the straight line method of amortization over a 15-year period; and
(iii) adoption of an OPEBs Cost Variance Deferral Account as defined in Schedule A.

2.       Newfoundland Power shall pay all expenses of the Board arising from this Application.

Date Issued:

December 10, 2010

 

 

Newfoundland Power Inc.                                                                                    P.U. 32 (2010)

Application:

Application for an order approving the Operation of the Automatic Adjustment Formula for 2011.

Decision:

1.   The Board approves:
(i) pursuant to Section 80 of the Act, a rate of return on rate base for Newfoundland Power for 2011 of 7.96% in a range of 7.78% to 8.14%;
(ii) pursuant to Section 58 of the Act, a revised definition of the Excess Earnings Account as set out in Schedule 1; and
(iii) pursuant to Section 70 of the Act, deferral until December 15, 2010 of the filing of an application for a revised schedule of rates, tolls and charges to become effective January 1, 2011.

2.   Newfoundland Power shall pay all expenses of the Board arising from this Application.

Date Issued:

December 10, 2010

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 33 (2010)

Application:

Application for approval of changes in the rates to be charged for the supply of power and energy to certain Labrador Interconnected customers and related changes in the Rate Stabilization Plan Rules, pursuant to Sections 70 and 71 of the Act.

Decision:

1.   The change of the monthly amount of the 2011 automatic rate adjustment in the Rural Rate Alteration in the Rate Stabilization Plan from $47,847 to $98,295 is approved, as set out in Schedule A.

2.   The Schedule of Rates for certain Labrador Interconnected customers, as set out in Schedule B, is approved, effective January 1, 2011.

3.   Hydro shall pay all expenses of the Board arising from this Application

Date Issued:

December 10, 2010

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 34 (2010)

Application:

Application for approval of to install pipe blinds or other secure devices in the Holyrood Thermal Generating Station to prevent hazardous substances from entering confined spaces ensuring a safe work environment pursuant to Section 41(3) of the Act.

Decision:

1.   The proposed supplementary 2010 capital expenditure of $1,804,300 for the installation of pipe blinds or other secure devices to prevent hazardous substances from entering confined spaces at the Holyrood Thermal Generating Station is approved.

2.   Hydro shall pay all expenses of the Board arising from this Application..

Date Issued:

December 17, 2010

 

 

Newfoundland Power Inc.                                                                                    P.U. 35 (2010)

Application:

Application for approval of a capital expenditure allowance for unforeseen requirements for the construction and purchase of certain improvements and additions to its property pursuant to Section 41(3) of the Act (the “Application”).

Decision:

1.   The addition of a supplementary amount of $1,900,000 to the Allowance for Unforeseen Items approved in Order Nos. P.U. 41(2009) and P.U. 17(2010) is approved.

2.   Newfoundland Power shall pay the expenses of the Board arising from this Application.

Date Issued:

December 21, 2010

 

 

Newfoundland Power Inc.                                                                                    P.U. 36 (2010)

Application:

Application for approval of a Proposed Schedule of Rates, Tolls and Charges to be effective January 1, 2011.

Decision:

1.   The Board approves the proposed schedule of rates, tolls and charges to apply to consumption on and after January 1, 2011, attached as Schedule A.

2.   Newfoundland Power shall pay the expenses of the Board arising from the Application.

Date Issued:

December 21, 2010

 

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 37 (2010)

Application:

Approval of a change in rates to be charged for the supply of power and energy to Island Interconnected customers (excluding Burgeo School and Library) and Isolated Rural Customers (excluding Government departments)pursuant to Subsection 70(1) of the Act .

Decision:

1.   The rates proposed by Hydro for its Island Interconnected customers (Rate Class 1.1, 2.1, 2.2, 2.3, 2.4 and 4.1) and Isolated Rural customers (Rate Class 1.2D, 2.1D, 2.2D and 4.1D), to be effective for service provided on and after January 1, 2011, as set out in Schedule “A”, are approved.

2.   Hydro shall pay all expenses of the Board arising from this Application..

Date Issued:

December 23, 2010

 

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 38 (2010)

Application:

Application for approval of its:
(a) 2011 capital budget;
(b) 2011 capital purchases and construction projects in excess of $50,000;
(c) estimated contributions in aid of construction for 2011; and
(d) fixing and determining its average rate base for 2009.

Decision:

1.   Hydro's proposed construction and pnrchase of improvements or additions to its property in excess of $50,000 are approved as set out in Schedule A to this Order, except that the proposed:
a. Upgrade Stack Breeching Unit 1, Holyrood is denied, with leave to reapply for approval to proceed with a revised project in accordance with the findings of the Board;
b. Refurbish Fuel Storage Facility, Holyrood is denied with leave to reapply with updated evidence; and
c. Construct Transmission Line Equipment Off-Loading Areas is denied.

2.   Hydro's 2011 Capital Budget, as set out in Schedule B to this Order, for improvements 16 and additions to its property in the amount of $ 55,046,000 is approved.

3.   Unless otherwise directed by the Board Hydro shall file an annual report with the Board in relation to its 2011 capital expenditures by March 1, 2012.

4.   Unless otherwise directed by the Board Hydro shall file, in conjunction with the 2012 Capital Budget Application, a status report on the 2011 capital budget expenditures.

5.   Pursuant to Section 78 of the Act the rate base for the year ending December 31, 2009 is hereby fixed and determined at $1,473,477,000.

6.   Hydro shall pay all costs and expenses of the Board incurred in connection with the Application.

Date Issued:

December 23, 2010

 

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 39 (2010)

Application:

Approval of the Rate Stabilization Plan components of the rates to be charged to Island Industrial Customers and the Consumer Advocate Application for the approval of changes to the Rate Stabilization Plan.

Decision:

1.   The Board approves on an interim basis the schedule of rates, tolls and charges as attached in Schedule A to be effective for consumption by Newfoundland Power as of January 1, 2011.

2.   The Board approves on an interim basis the Rate Stabilization Plan as attached in Schedule B as of January 1, 2011.

3.   Hydro shall pay the expenses of the Board arising from this Order.

Date Issued:

December 30, 2010


Newfoundland and Labrador Hydro                                                                        P.U. 1 (2009)

Application:

Application for approval of rates to be charged for the supply of power and energy by Newfoundland and Labrador Hydro to Non-Government Rural Isolated Domestic and General Service customers, pursuant to Sections 70 and 71 of the Act.

Decision:

1.       Order No. P.U. 38(2008) is rescinded.

2.       The rates for Non-Government Rural Isolated Domestic and General Service customers are approved as set out in Schedule A, effective January 1, 2009.

3.       Hydro shall file no later than September 30, 2009 an application for approval of rates to be effective January 1, 2010 for its Non-Government Rural Isolated Domestic and General Service customers.

Date Issued:

January 5, 2009

 

 

Newfoundland and Labrador Hydro                                                                        P.U. 2 (2009)

Application:

Application for approval to relocate portable generating units maintained at St. Anthony in accordance with Order No. P. U. 34(2004).

Decision:

1.       Hydro’s application to retain the Portable Generators at the Nain diesel generating station while it is being repaired following the September 7, 2008 fire is approved.

2.       Hydro’s application for approval to return the Portable Generators to St. Anthony after completion of the repairs at the Nain diesel generating station and retain the Portable Generators at St. Anthony except for times when they are needed or useful to provide operation benefits for temporary deployment elsewhere is not approved as the location and conditions on usage of the Portable Generators will be determined as part of a general review by the Board of Hydro’s preparedness and planning in relation to standby/portable generation.

3.       Hydro shall pay the expenses of the Board arising from this matter.

Date Issued:

January 20, 2009

 

 

Newfoundland Power Inc.                                                                                       P.U. 3 (2009)

Application:

Application for an Order approving a revised definition of the Excess Earnings Account.

Decision:

1.       The Board approves, pursuant to Section 58 of the Act, the definition of the Excess Earnings Account as set out in Schedule A.

2.       Newfoundland Power shall pay all expenses of the Board arising from this Application.

Date Issued:

January 27, 2009

 

 

Newfoundland and Labrador Hydro                                                                        P.U. 4 (2009)

Application:

Application for approval of a capital project to replace the power transformer at the Wiltondale Terminal Station.

Decision:

1.       The capital expenditure of $351,000 for the replacement of the power transformer at the Wiltondale terminal station is approved.

2.       Hydro shall pay the expenses of the Board incurred in connection with this Application.

Date Issued:

January 27, 2009

 

 

Newfoundland Power Inc.                                                                      P.U. 5 (2009) Amended

Application:

Application for approval of:

                                                               i.      revised distribution line cost per metre for Contributions in Aid of Construction (CIAC’s);

                                                             ii.      revised distribution plan upgrade cost for CIAC’s; and

                                                            iii.      revised CIAC cost factors.

Decision:

1.       The revised cost factors submitted with the Application and contained in Schedules “A”, “B”, “C” and an amended Schedule “D” attached to this Order are approved to be used in the calculation of all CIAC’s with effect from January 28, 2009, and, where advantageous to customers of Newfoundland Power, on all CIAC’s quoted but unpaid as of January 28, 2009.

2.       Newfoundland Power submit a revised CIAC Policy in its entirety incorporating the revisions approved herein.

Date Issued:

February 3, 2009

 

 

Newfoundland and Labrador Hydro                                                                        P.U. 6 (2009)

Application:

Application for approval of the Rate Stabilization Plan components of the rates to be charged to Island Industrial Customers pursuant to Section 41(3) of the Act.

Decision:

1.       Hydro shall make application to finalize the interim rates, rules and regulations for the Island Industrial Customers by June 30, 2009.

2.       The continuation of the rates, rules and regulations for Hydro’s Island Industrial Customers is approved on an interim basis until a final Order of the Board with respect to the finalization of rates.

3.       Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

January 30, 2009

 

 

Newfoundland Power Inc.                                                                                       P.U. 7 (2009)

Application:

Application for an Order approving a Contribution in Aid of Construction (CIAC) for a Three-Phase Service for the City of St. John’s.

Decision:

1.       The CIAC of Seventy-nine thousand five hundred three dollars and thirty-four cents ($79,503.34), including HST, as calculated under the Policy to provide three-phase service to a gas extraction plant for the City of St. John’s, is approved.

2.       Newfoundland Power shall pay all expenses of the Board arising from this Application.

Date Issued:

March 9, 2009

 

 

Newfoundland and Labrador Hydro                                                                        P.U. 8 (2009)

Application:

Application for approval of a capital project to replace programmable logic controllers at the Holyrood Thermal Generating Station pursuant to Section 41(3) of the Act.

Decision:

1.       The Board approves the capital expenditures of $1,092,900 for the replacement of the programmable logic controllers at the Gas Turbine Plant.

2.       Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

March 12, 2009

 

 

Newfoundland and Labrador Hydro                                                                        P.U. 9 (2009)

Application:

Application for approval of a capital expenditure to replace the Operator Console for the Stephenville Gas Turbine pursuant to Section 41(3) of the Act.

Decision:

1.       The request for approval of a capital expenditure of $119,500 for the replacement of the Operator Console for the Stephenville Gas Turbine is denied.

2.       Hydro shall pay the expenses of the Board incurred in connection with this Application.

Date Issued:

March 20, 2009

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 10 (2009)

Application:

Application for approval of a capital project to upgrade the Continuous Emission Monitoring System at the Holyrood Thermal Generating Station pursuant to Section 41(3) of the Act.

Decision:

1.       The Board approves the capital expenditures of $703,700 for the upgrade of the continuous emission monitoring system at the Holyrood Thermal Generating Station pursuant to Section 41(3) of the Act.

2.       Hydro shall all expenses of the Board arising from this Application.

Date Issued:

March 20, 2009

 

 

Newfoundland Power Inc.                                                                                     P.U. 11 (2009)

Application:

Application for an Order approving the issue of Series AM First Mortgage Sinking Fund Bonds pursuant to Section 91 of the Act.

Decision:

1.       The Board approves, pursuant to Section 91 of the Act, the issuance by Newfoundland Power of Series AM First Mortgage Sinking Fund Bonds in an amount of up to $75,000,000 and on the general terms set out in the Application subject to the following conditions:

(a)                The Bonds shall be issued on or before December 31, 2009.

(b)                Newfoundland Power shall provide the Board an Affidavit specifying the terms and conditions of the Bond issue within five (5) days (non-business days excepted) after closing the Bond issue.  In particular, the Affidavit shall set forth the following:

i.                     date of the issue;

ii.                   term;

iii.                  maturity date;

iv.                 principal amount;

v.                   coupon rate;

vi.                 particulars of sinking fund, if any;

vii.                price to the public and to the underwriters;

viii.              yield to the public;

ix.                 underwriting fee;

x.                   actual cost (i.e. yield) to Newfoundland Power; and

xi.                 any other material terms or conditions not contemplated at the date of the Application but forming part of the negotiated terms and conditions.

(c)                Newfoundland Power shall provide to the Board a copy of the Underwriting Agreement relating to the Bond issue within five (5) days (non-business days excepted) after closing the Bond issue.

(d)                The proceeds of the Bond issue shall be used in the manner set out in paragraph 9 of the Application, and Newfoundland Power shall report by Affidavit to the Board on the disposition of the proceeds no later than January 15, 2010.

2.       Newfoundland Power shall pay all costs and expenses of the Board in connection with this Application..

Date Issued:

March 20, 2009

 

 

Newfoundland Power Inc.                                                                                     P.U. 12 (2009)

Application:

Application for an Order approving the balance in the Weather Normalization Reserve pursuant to Section 91 of the Act.

Decision:

1.       The Board approves Newfoundland Power ‘s Weather Normalization Reserve of a negative balance of $5,910,271 as of December 31, 2008 pursuant to subsections 69(3) and 78 of the Act.

2.       Newfoundland Power shall pay all costs and expenses of the Board in connection with this Application.

Date Issued:

March 20, 2009

 

 

Newfoundland Power Inc.                                                                                     P.U. 13 (2009)

Application:

Application for an Order approving the deferred recovery of certain 2009 costs associated with an energy conservation program to be implemented in 2009.

Decision:

1.       The Board approves the creation of a Conservation Cost Deferral Account as defined in Schedule “A” to this Order to provide for the deferred recovery, until a further Order of the Board, of 2009 costs (net of tax) related to the implementation of the Conservation Plan, estimated to be $1.4 million.

2.       Newfoundland Power shall provide, as part of its 2009 annual report, a report on the implementation of the Conservation Plan in 2009, including a description of specific initiatives, the results and the associated costs.

3.       Newfoundland Power shall pay all expenses of the Board arising from this Application

Date Issued:

March 25, 2009

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 14 (2009)

Application:

Application for an Order approving a deferral account to allow the deferred recovery of certain 2009 costs associated with an energy conservation program to be implemented in 2009.

Decision:

1.       The Board approves the creation of a Conservation Cost Deferral Account to provide for the deferred recovery, until a further Order of the Board, of 2009 costs related to the implementation of the Conservation Plan, estimated to be $1.8 million.

2.       Hydro shall file a definition of the Conservation Cost Deferral Account with the Board within 30 days of this Order.

3.       Hydro shall provide, as part of its 2009 annual report, a report on the Conservation Plan initiatives implemented in 2009, including a description of specific initiatives, the results and the associated costs.

4.       Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

March 25, 2009

 

 

Newfoundland Power Inc.                                                                                     P.U. 15 (2009)

Application:

Application for an Order approving a deferral account to true-up Newfoundland Power Inc. corporate income taxes for years subsequent to the 2008 test year to reflect federal corporate tax reductions.

Decision:

1.       The Board will make no Order as to the corporate tax reductions of 0.5% in 2009 and 1.0% in 2010.

2.       Newfoundland Power shall pay all the expenses of the Board incurred in this application.

Date Issued:

March 25, 2009

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 16 (2009)

Application:

Application for approval of a capital expenditure to extend the parking lot at Hydro Place, pursuant to subsection 41(3) of the Act.

Decision:

1.       The Board approves the capital expenditure of $93,000 for the extension of the parking lot at Hydro Place, pursuant to Section 41(3) of the Act.

2.       Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

March 27, 2009

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 17 (2009)

Application:

Application for approval of certain rules and regulations pertaining to the supply of electrical power and energy to one of its industrial customers, Corner Brook Pulp and Paper Limited pursuant to Section 71 of the Act.

Decision:

1.       The Corner Brook Pulp and Paper Limited Service Agreement, as set out in the attached Schedule “A”, is hereby approved for a term of no longer than two years from the date of this Order.

2.       Hydro shall apply to the Board for approval of a subsequent Service Agreement for the provision of service to Corner Brook Pulp and Paper Limited at least thirty days prior to the end of the term of the Service Agreement approved in this Order.

3.       Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

April 17, 2009

 

 

Newfoundland Power Inc.                                                                                     P.U. 18 (2009)

Application:

Application for an Order approving the removal of a distribution line from service on the Burin Peninsula.

Decision:

1.       Pursuant to Section 38 of the Act, the Board approves and consents to removal of the Line as proposed by the Application.

2.       Newfoundland Power shall pay all costs and expenses of the Board in connection with this Application.

Date Issued:

May 6, 2009

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 19 (2009)

Application:

Application for approval of the installation of cold reheat condensate drains and high-pressure heater trip on Unit 2 at the Holyrood Thermal Generating Station pursuant to Section 41 of the Act.

Decision:

1.       Pursuant to Section 41 of the Act, the Board approves the expenditure of $191,600 to install cold reheat condensate drains and high-pressure heater trip on Unit 2 at Holyrood in place of the same project for Unit 1.

2.       Hydro shall pay all expenses of the Board arising from this Application

Date Issued:

May 7, 2009

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 20 (2009)

Application:

Application for approval of the cost to be recovered through the Rate Stabilization Plan charged to Newfoundland Power Inc. and the Island Industrial Customers of consuming No. 6 fuel not exceeding 0.7% sulphur by weight.

Decision:

1.       The recovery of Hydro’s costs of burning 0.7% sulphur content No. 6 fuel at the Holyrood Thermal Generating Station through the operation of the Rate Stabilization Plan after March 31, 2009 is approved.

2.       The costs of the fuel shall be calculated in accordance with the usual operation of the Rate Stabilization Plan from March 31, 2009.

3.       Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

May 22, 2009

 

 

Newfoundland Power Inc.                                                                                     P.U. 21 (2009)

Application:

Application for an Order approving the Demand Management Incentive Account – Disposition of 2008 Balance

Decision:

1.       The Board approves, pursuant to Sections 58 and 80 of the Act, the disposition of the 2008 balance in the Demand Management Incentive Account as well as the related income tax effects by means of a credit in the amount of $641,336 to the Rate Stabilization Account, as of March 31, 2009.

2.       Newfoundland Power shall pay all costs and expenses of the Board in connection with this Application.

Date Issued:

May 22, 2009

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 22 (2009)

Application:

Application for approval, pursuant to Section 70 (1) of the Act, of the Rate Stabilization Plan component of the rates to be charged to Newfoundland Power Inc. (“Newfoundland Power”).

Decision:

1.   The Board approves:

(a)    the proposed modifications to the fuel rider component of the Rate Stabilization Plan;

(b)    the rates to be charged by Hydro to Newfoundland Power, as set out in Schedule “A” to this Order, to be effective for consumption on or after July 1, 2009;

(c)    the Rate Stabilization Plan Rules as set out in Schedule “B” to this Order, to be effective July 1, 2009; and

2.  Hydro shall pay the expenses of the Board incurred in connection with this matter.

Date Issued:

June 16, 2009

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 23 (2009)

Application:

Application for approval for the development of an on-line Work Protection Code (WPC) training software program.

Decision:

1.       The capital expenditure of $160,800 for the development of an on-line Work Protection Code training software program is approved.

2.       Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

June 16, 2009

 

 

Newfoundland Power Inc.                                                                                     P.U. 24 (2009)

Application:

Procedural Order re: General Rate Application by Newfoundland Power Inc. to establish customer electricity rates for 2010.

Decision:

The registered Intervenors, the Schedule of Dates, and the Rules of Procedure for the hearing of the Application are as set out in Appendix “A” to this Order.

Date Issued:

June 17, 2009

 

 

Newfoundland Power Inc.                                                                                     P.U. 25 (2009)

Application:

Application for an Order approving a Contribution in Aid of Construction (CIAC) for a line extension to serve domestic customers in a cottage area known as Terra Nova Lake.

Decision:

1.       The Board approves the No-Refundable CIAC of five thousand four hundred thirty-five dollars and eighty-five cents ($5,435.85), excluding HST, as calculated under the Policy to apply to Domestic Customers located in the Cottage Area known as Terry Nova Lake, pursuant to s. 41(5) of the Act.

2.       Newfoundland Power shall pay all expenses of the Board arising from this Application.

Date Issued:

June 24, 2009

 

 

Newfoundland Power Inc.                                                                                     P.U. 26 (2009)

Application:

Application for approval of Rate Stabilization Adjustment and Municipal Tax Adjustment to be effective July 1, 2009

Decision:

1         The Rate Stabilization Adjustment of 0.066 cents/kWh and the Municipal Tax Adjustment factor of 1.02447 are approved.

2         The proposed rates to customers of Newfoundland Power, as set out in Schedule A to this Order, are approved, to be effective on all electrical consumption on and after July 1, 2009.

3         Newfoundland Power shall pay the expenses of the Board in connection with this Application.

Date Issued:

June 26, 2009

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 27 (2009)

Application:

Application for Rate Changes to Island Interconnected Customers (excluding Burgeo School and Library) and Isolated Rural Customers (excluding Government departments) to be effective July 1, 2009.

Decision:

1.       The rates proposed by Hydro for its Island Interconnected customers (excluding Burgeo School and Library) and Isolated Rural customers (excluding Government departments), to be effective on all electrical consumption on and after July 1, 2009, as set out in Schedule A to this Order, are approved.

2.       Hydro shall pay the expenses of the Board incurred in connection with this Application.

Date Issued:

June 26, 2009

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 28 (2009)

Application:

Application for approval of a capital expenditure in relation to a condition assessment and life extension study for the Holyrood Thermal Generating Station pursuant to Section 41 of the Act.

Decision:

1.       The Board approves the budgeted capital expenditure of $1,895,000 for the proposed Condition Assessment and Life Extension Study for the Holyrood Thermal Generating Station.

2.       Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

July 9, 2009

 

 

Newfoundland Power Inc.                                                                                     P.U. 29 (2009)

Application:

Application for approval of an additional amount of $710,000 to the Allowance for Unforeseen items, pursuant to Section 41(3) of the Act.

Decision:

1.       Pursuant to Section 41(3) of the Act the Board approves an additional amount of $710,000 to the Allowance for Unforeseen Items account approved in Order No. P. U. 27(2008).

2.       Newfoundland Power shall pay all the expenses of the Board arising from this Application.

Date Issued:

July 27, 2009

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 30 (2009)

Application:

Application for approval of Rate Changes to Labrador Interconnected Rate Class 5.1H pursuant to Section 71 of the Act.

Decision:

1.       The Board approves the rate to be charged for the sale of secondary energy in Rate Class 5.1H as attached hereto as Schedule “A” to be effective June 1, 2009.

2.       Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

July 31, 2009

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 31 (2009)

Application:

Application for approval of the rehabilitation of the Nain Diesel Generating Plant, pursuant to Subsection 41(3) of the Act.

Decision:

1.       The proposed capital expenditures of $2,804,700 for the rehabilitation of the Nain Diesel Generating Plant is approved.

2.       Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

August 4, 2009

 

 

Newfoundland Power Inc.                                                                                     P.U. 32 (2009)

Application:

Application for approval of supplemental capital expenditures to the Long Harbour Distribution Feeder Construction (Vale Inco), pursuant to s. 41(3) of the Act.

Decision:

1.       The Board approves the proposed capital expenditure of $1,165,000 to construct the distribution line and upgrade the Western Avalon Substation.

2.       Newfoundland Power shall pay all the expenses of the Board arising from this Application.

Date Issued:

September 4, 2009

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 33 (2009)

Application:

Application for approval of the rehabilitation of a gas turbine generator to be located at the Stephenville Gas Turbine Plant, pursuant to s. 41(3) of the Act.

Decision:

1.       The Board approves the proposed capital expenditures of $2,086,200 for the rehabilitation of the gas turbine generator to be located at the Stephenville Plant.

2.       Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

September 4, 2009

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 34 (2009)

Application:

Application for approval of the Hinds Lake powerhouse slope stabilization, pursuant to s. 41(3) of the Act.

Decision:

1.       The Board approves the proposed capital expenditures of $1,136,000 for the Hinds Lake powerhouse slope stabilization.

2.       Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

September 4, 2009

 

 

Newfoundland Power Inc.                                                                                     P.U. 35 (2009)

Application:

Application for approval of a Contribution in Aid of Construction for Cottage Area Customers located at Princeton Big Pond on the Bonavista Peninsula, pursuant to s. 41(5) of the Act.

Decision:

1.       The Board approves the Non-Refundable CIAC of Five thousand six hundred fifty-one dollars and ninety-four cents ($5,651.94), excluding HST, as calculated under the Policy to apply to Domestic Customers located in the Cottage Area known as Princeton Big Pond, pursuant to s. 41(5) of the Act.

2.       The Board approves the deviation from the Policy proposed by Newfoundland Power, and Newfoundland Power’s commencing construction of the Extension with a Participation Percentage of 49.2% as proposed in the Application.

3.       Newfoundland Power shall pay all expenses of the Board arising from this Application.

Date Issued:

September 4, 2009

 

 

Newfoundland Power Inc.                                                                                     P.U. 36 (2009)

Application:

Application for approval of a Contribution in Aid of Construction for Cottage Area Customers located at Mobile First Pond on the Southern Shore, pursuant to s. 41(5) of the Act.

Decision:

1.       The Board approves the Refundable CIAC of Three thousand three hundred seven dollars and fifty cents ($3,307.50), excluding HST, as calculated under the Policy to apply to Domestic Customers located in the Mobile First Pond Cottage Area (Phase 2), pursuant to s. 41(5) of the Act.

2.       Newfoundland Power shall pay all expenses of the Board arising from this Application.

Date Issued:

September 4, 2009

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 37 (2009)

Application:

Ex Parte application for the extension of time for the filing of an application required by Order No. P.U. 1 (2009) concerning rates to be charged for the supply of power and energy by Newfoundland and Labrador Hydro to Non-Government Rural Isolated Domestic and General Service customers.

Decision:

1.       Hydro shall make an application no later than October 30, 2009 to finalize the rates to be effective January 1, 2010 for its Non-Government Rural Isolated Domestic and General Service Customers.

2.       Hydro shall include all rate pages for the proposed rates with the application.

3.       Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

October 1, 2009

 


Newfoundland Power Inc.                                                                                     P.U. 38 (2009)

Application:

Application for approval of an additional amount of $375,000 to the Allowance for Unforeseen Items, pursuant to s. 41(3) of the Act.

Decision:

1.       The Board approves the proposed addition of a supplementary amount of $375,000 to the Allowance for Unforeseen Items Account approved in Order No. P. U. 27(2008).

2.       Newfoundland Power shall pay all the expenses of the Board arising from this Application.

Date Issued:

October 9, 2009

 

 

Newfoundland Power Inc.                                                                                     P.U. 39 (2009)

Application:

Application for approval of Contribution in Aid of Construction for Domestic Customers located in a Cottage Area known as Emberley Place (Mahers) located near the existing Mahers Cottage Area, pursuant to s. 41(5) of the Act.

Decision:

1.       The Board approves the Non-Refundable CIAC of Three thousand nine hundred forty-seven dollars and twenty-six cents ($3,947.26), excluding HST, as calculated under the Policy to apply to Domestic Customers located in the Cottage Area known as Emberley Place (Mahers), pursuant to s. 41(5) of the Act.

2.       Newfoundland Power shall pay all expenses of the Board arising from this Application.

Date Issued:

October 9, 2009

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 40 (2009)

Application:

Application for approval of the replacement of microwave radio equipment between the Godaleich Hill Microwave Site and the Upper Salmon Generating Station, pursuant to s. 41(3) of the Act.

Decision:

1.       The Board approves the proposed capital expenditure of $196,500 for the replacement of microwave radio equipment between the Godaleich Hill Microwave Site and the Upper Salmon Generating Station.

2.       Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

October 21, 2009

 

 

Newfoundland Power Inc.                                                                                     P.U. 41 (2009)

Application:

Application for approval of Newfoundland Power Inc. for an Order:

a)       approving its 2010 Capital Budget of $64,679,000; and

b)      fixing and determining its average rate base for 2008 in the amount of $820,876,000.

pursuant to Sections 41 and 78 of the Act.

Decision:

1.       Newfoundland Power’s capital purchases and construction projects in excess of $50,000, as set out in Schedule A to this Order, are approved.

2.       The 2010 Capital Budget for improvements and additions to Newfoundland Power’s property in an amount of $64,679,000 is approved.

3.       The average rate base for the year ending December 31, 2008 is hereby fixed and determined at $820,876,000.

4.       Unless otherwise directed by the Board, Newfoundland Power shall file an annual report to the Board on its 2010 capital expenditures by March 1, 2011.

5.       Unless otherwise directed by the Board, Newfoundland Power shall provide, in conjunction with the 2011 Capital Budget Application, a status report on the 2010 capital budget expenditures showing for each project:

                                                                                       i.            the approved budget for 2010;

                                                                                     ii.            the expenditures prior to 2010;

                                                                                    iii.            the 2010 expenditures to the date of the Application;

                                                                                   iv.            the remaining projected expenditures for 2010;

                                                                                     v.            the variance between the projected total expenditures and the approved budget; and

                                                                                   vi.            an explanation of the variance.

6.       Newfoundland Power shall pay all costs and expenses of the Board incurred in connection with the Application.

Date Issued:

November 4, 2009

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 42 (2009)

Application:

Application for the fixing and determining of the revised average rate base for each of 2005, 2006 and 2007, pursuant to s. 78 of the Act.

Decision:

1.       Hydro’s revised average rate base for 2005 is fixed and determined in the amount of $1,475,728,000.

2.       Hydro’s revised average rate base for 2006 is fixed and determined in the amount of $1,478,649,000.

3.       Hydro’s revised average rate base for 2007 is fixed and determined in the amount of$1,483,524,000.

4.       Hydro shall file a report with the Board no later than March 31, 2010, setting out the amendments to its internal audit measures and any other internal controls which will be implemented to reduce the possibility of future errors and omissions in the calculation of rate base.

5.       Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

November 16, 2009

 

 

Newfoundland Power Inc.                                                P.U. 43 (2009)    Reasons For Decision

Application:

General Rate Application by Newfoundland Power Inc. to establish customer electricity rates for 2010.

Decision:

Rate Base and Range of Return on Rate Base

1.       Newfoundland Power shall calculate and file a revised forecast average rate base and return on rate base for 2010, based on its proposals in the Application, incorporating the determinations set out in this Order, including:

                                                                     i.            a proportion of regulated common equity in the capital structure not to exceed 45%; and

                                                                   ii.            a return on regulated common equity of 9.0%.

2.       The allowed range of return on rate base shall be 36 basis points for 2010 and for use in the Automatic Adjustment Formula, unless otherwise ordered by the Board.

2010 Test Year Revenue Requirement

3.       Newfoundland Power shall calculate and file a revised forecast total revenue requirement for the 2010 test year based on its proposals in the Application, incorporating the determinations set out in this Order.

Automatic Adjustment Formula

4.       Unless the Board orders otherwise the rate of return on rate base for 2011 and 2012 shall be set using the Automatic Adjustment Formula.

5.       Unless the Board orders otherwise Newfoundland Power shall apply no later than November 30th in each of 2010 and 2011 for the application of the Automatic Adjustment Formula to the rate of return on rate base and, if required, for a revised Schedule of rates, tolls and charges effective January 1, 2011 and January 1, 2012 respectively.

6.       Unless the Board orders otherwise Newfoundland Power shall file its next general rate application with the Board no later than May 31, 2012 with a 2013 test year.

Accounting/Regulatory Matters

7.       Newfoundland Power shall continue to use the cash method for accounting for Other Post Employment Benefits costs unless otherwise ordered by the Board.

8.       Newfoundland Power shall file with the Board, no later than June 30, 2010, a comprehensive proposal for the adoption of the accrual method of accounting for Other Post Employment Benefits costs as of January 1, 2011, including alternatives and recommendations in relation to:

                                                                     i.            a deferral mechanism to capture annual variances arising from changes in the discount rate and other assumptions; and

                                                                   ii.            the recovery of the transitional balance associated with the adoption of accrual accounting for Other Post Employment Benefits costs.

9.       Newfoundland Power’s proposal to create a Pension Expense Variance Deferral Account as of January 1, 2010 and as defined in Schedule A is approved.

10.   Newfoundland Power shall create a Hearing Cost Deferral Account to recover over three years commencing January 1, 2010 hearing costs relating to this Application in the total amount of $750,000.

11.   The following deferral accounts are approved for continued use:

                                                                     i.            Energy Supply Cost Variance Account;

                                                                   ii.            Demand Management Incentive Account; and

                                                                  iii.            Conservation Cost Deferral Account.

12.   Newfoundland Power shall file as part of its next general rate application a report on the performance of the Demand Management Incentive Account, including a summary of the amounts of transfers and savings and an examination of the incentive effects of:

                                                                     i.            the Demand Management Incentive Account;

                                                                   ii.            other existing regulatory mechanisms related to power purchase costs; and

                                                                  iii.            possible alternative mechanisms with respect to the effectiveness and efficiency of the incentive to reduce power purchase costs.

13.   Newfoundland Power’s proposal to recover the 2009 conservation programming costs of approximately $1.5 million over the remaining four years of the 5-year Energy Conservation Plan is approved.

14.   Newfoundland Power shall file its next depreciation study relating to plant in service as of December 31, 2009.

15.   Newfoundland Power, in consultation with the Consumer Advocate, shall file no later than March 31, 2010 a revised schedule for the ongoing retail rate design study.

16.   Newfoundland Power, in consultation with the Consumer Advocate, shall file no later than June 30, 2010 a report with recommendations and alternatives in relation to the policies for deployment of Newfoundland Power’s staff to affiliated and other companies for emergency response.

17.   Newfoundland Power shall file a monthly update in relation to the transition to International Financial Reporting Standards (IFRS), beginning on February 1, 2010 and continuing until full implementation, replacing the quarterly reporting previously ordered by the Board.

Rates, Rules and Regulations

18.   Newfoundland Power shall file for the approval of the Board revised rates, tolls and charges effective for service provided on and after January 1, 2010, based on the proposals in the Application, incorporating the determinations set out in this Order.

Hearing Costs

19.   Newfoundland Power shall pay the expenses of the Board arising from the Application, including the expenses of the Consumer Advocate incurred by the Board.

Date Issued:

December 11, 2009

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 44 (2009)

Application:

Application for approval of the deferral of expenses associated with the repair of the Unit 1 Turbine at the Holyrood Thermal Generating Station as a Major Extraordinary Repair, pursuant to Sections 69, 78 and 80 of the Act.

Decision:

1.       The Application is denied.

2.       Hydro shall pay the expenses of the Board arising from this Application.

Date Issued:

December 14, 2009

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 45 (2009)

Application:

Application for approval of changes in the rates to be charged for the supply of power and energy to certain Labrador Interconnected customers and related changes in the Rate Stabilization Plan Rules, pursuant to Sections 70 and 71 of the Act.

Decision:

1.       The decrease of the monthly amount of the 2010 automatic rate adjustment in the Rural Rate Alteration in the Rate Stabilization Plan from ($5,766) to ($47,847), is approved, as attached in Schedule A.

2.       The Schedule of Rates for certain Labrador Interconnected customers, as attached in Schedule B, is approved, effective January 1, 2010.

3.       Hydro shall pay the expenses of the Board arising from this Application.

Date Issued:

December 21, 2009

 

 

Newfoundland Power Inc.                                                                                     P.U. 46 (2009)

Application:

Application for approval of customer rates, tolls and charges reflecting the determinations set out in Order No. P. U. 43(2009) re Newfoundland Power’s 2010 General Rate Application.

Decision:

1.       The Board approves the forecast average rate base for 2010 of $871,585,000, pursuant to Section 80 of the Act.

2.       The Board approves the rate of return on rate base for 2010 of 8.23% in a range of 8.05% to 8.41%, pursuant to Section 80 of the Act.

3.       The Board approves the Schedule of Rates, Tolls and Charges of Newfoundland Power attached hereto and marked as Schedule “A”, to be effective for service provided on and after January 1, 2010, pursuant to Section 70(1) of the Act.

4.       The Board approves the Rules and Regulations attached hereto as Schedule “B”, to be effective January 1, 2010.

5.       The Board approves the revised definition of the Excess Earnings Account attached hereto and marked as Schedule “C”.

6.       Newfoundland Power shall pay the expenses of the Board arising from this Application.

Date Issued:

December 24, 2009

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 47 (2009)

Application:

Application for approval of a change in rates to be charged for the supply of power and energy to Island Interconnected customers (excluding Burgeo School and Library) and Isolated Rural customers (excluding Government departments), pursuant to Section 70(1) of the Act.

Decision:

1.       The rates proposed by Hydro for its Island Interconnected customers (Rate Class 1.1, 2.1, 2.2, 2.3, 2.4 and 4.1and Isolated Rural customers (Rate Class 1.2D, 2.1D, 2.2D and 4.1D), to be effective for service provided on and after January 1, 2010, as set out in Schedule “A” to this Order, are approved.

2.       Hydro shall pay the expenses of the Board arising from this Application.

Date Issued:

December 24, 2009


Newfoundland Power                                                                                              P.U. 1 (2008)

Application:

Application for approval of:

                                                         i.      revised distribution line cost per metre for Contributions in Aid of Construction (CIAC’s);

                                                       ii.      revised distribution plant upgrade cost for CIAC’s; and

                                                      iii.      revised CIAC cost factors.

Decision:

1.       The revised cost factors submitted with the application and contained in the Schedules appended to this Order are approved to be used in the calculation of all CIAC’s with effect from February 5, 2008, and, where advantageous to customers of Newfoundland Power, on all CIAC’s quoted but unpaid as of February 5, 2008.

2.       Newfoundland Power submit a revised CIAC Policy in its entirety incorporating the revisions approved herein.

Date Issued:

January 31, 2008

 

 

Newfoundland Power                                                                                              P.U. 2 (2008)

Application:

Application for approval of a Contribution in Aid of Construction (CIAC) for Cottage Area Customers located at Terrence’s Pond near Clarenville.

Decision:

1.       The Board approves the Non-Refundable CIAC of four thousand three hundred thirty-one dollars and twenty-nine cents ($4,331.29), excluding HST, as calculated under the Policy to provide single-phase service to Domestic Customers located in the Combined Thorburn Lake Cottage Area for a 20-year period from the date the Terrence’s Pond Extension is placed in service, pursuant to s. 41(5) of the Act.

2.       The Board approves the refund to each of the existing customers in the Thorburn Lake Cottage Area of the amount of one hundred thirty-six dollars and one cent ($136.01), excluding HST.

3.       The Applicant shall pay all expenses of the Board arising from this Application.

Date Issued:

April 10, 2008

 

 

Newfoundland Power                                                                                              P.U. 3 (2008)

Application:

Application for approval of a capital expenditure supplemental to Newfoundland Power Inc.’s 2008 Capital Budget (1st Supplemental – Replacement of power transformer in NP’s Pierre’s Brook hydroelectric system, the Southern Shore Highway)

Decision:

1.   Pursuant to Section 41(3) of the Act, the Board approves:

                                                                           i.            capital expenditures estimated in the amount of $486,000 related to the work that is required to accommodate the replacement transformer at the Pierre’s Brook substation as set forth in the application; and

                                                                         ii.            an increase in the amount of $400,000 to the Allowance for Unforeseen Items approved in Order No. P. U. 27(2007).

2.   Newfoundland Power shall pay the expenses of the Board arising from this application.

Date Issued:

April 10, 2008

 

 

Newfoundland and Labrador Hydro                                                                        P.U. 4 (2008)

Application:

Application for Rate Changes to Labrador Interconnected Customers

Decision:

1.       The decrease of the monthly amount of the 2008 automatic rate adjustment in the Rural Rate Alteration for the Labrador Interconnected customers in the Rate Stabilization Plan from $92,560 to $32,433, is approved on a final basis, as attached in Schedule A.

2.       Pursuant to Section 70 of the Act, the Schedule of Rates for the Labrador Interconnected customers, as attached in Schedule B, is approved on a final basis, effective January 1, 2008.

3.       Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

April 30, 2008

 

 

Newfoundland and Labrador Hydro                                                                        P.U. 5 (2008)

Application:

Application for Rate Changes to Island Interconnected Customers and Isolated Rural Customers

Decision:

1.       Pursuant to Section 70 of the Act the rates as attached in Schedule A are approved on a final basis, effective for consumption on and after January 1, 2008.

2.       The continuation of the rebate to Hydro’s domestic customers served from the Labrador Isolated and L’Anse au Loup (Labrador Straits) system is approved on a final basis.

3.       Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

May 2, 2008

 

 

Newfoundland Power                                                                                              P.U. 6 (2008)

Application:

Application for an Order of the Board providing for disposition of the balance in the Purchased Power Unit Cost Variance Reserve Account pursuant to Sections 58 and 80 of the Act.

Decision:

1.       The Board approves the amended Rate Stabilization Clause set out in Schedule “A” to this Order, which adds clause 6 to the Rate Stabilization Account at page 5 of 5.

2.      The Board approves the disposition of the 2007 balance in the Purchased Power Unit Cost Variance Reserve Account by means of a credit to the Rate Stabilization Account, as of March 31, 2008, of $481,611.

3.      Newfoundland Power shall pay all expenses of the Board arising from this Application.

Date Issued:

May 29, 2008

 

 

Newfoundland Power                                                                                              P.U. 7 (2008)

Application:

Application for approval of the balance of the balance of the Weather Normalization Reserve as of December 31, 2007 pursuant to Sections 69(3) and 78 of the Act.

Decision:

1.       The Board approves Newfoundland Power’s Weather Normalization Reserve of a Negative Balance of $10,516,682 as at December 31, 2007, pursuant to Sections 69(3) and 78 of the Act.

2.       Newfoundland Power shall pay all the expenses of the Board arising from this Application.

Date Issued:

May 15, 2008

 

 

Newfoundland Power                                                                                              P.U. 8 (2008)

Application:

Application for approval of a contribution in aid of construction for a line extension to serve domestic customers residing in a cottage area pursuant to Section 41(5) of the Act.

Decision:

1.      The Board approves the Refundable contribution in aid of construction of four thousand seven hundred twenty-seven dollars and ninety-six cents ($4,727.96), excluding HST, as calculated under the Policy to apply to Domestic Customers in the Golden Gullies and Goulds Big Pond Cottage Area, pursuant to Section 41(5) of the Act.

2.      Newfoundland Power shall pay all expenses of the Board arising from this Application.

Date Issued:

May 15, 2008

 

 

Newfoundland and Labrador Hydro                                                                        P.U. 9 (2008)

Application:

Application for approval to lease office space - Labrador Region Operations, pursuant to Section 41 of the Public Utilities Act.

Decision:

1.       The Board approves Hydro’s proposed 20-month lease of office space for Happy Valley-Goose Bay in the amount of $6,337.50 per month, plus HST, pursuant to Section 41 of the Act.

2.       Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

May 28, 2008

 

 

Newfoundland Power                                                                                            P.U. 10 (2008)

Application:

Application for approval of the establishment of a 2008 Income Tax Deferral Account and a 2008 Income Tax True-up.

Decision:

1.       The Board approves:

(a)          the definition of the 2008 Tax Deferral Account contained in Schedule “A” of this Order;

(b)          a credit of $560,000 of the 2008 Income Tax True-up to the 2008 Tax Deferral Account as of March 31, 2008;

(c)          a transfer of $560,000 from the 2008 Tax Deferral Account to the Rate Stabilization Account as of March 31, 2008; and

(d)          a reduction in Newfoundland Power’s base rates of 0.177% to be effective July 1, 2008.

2.   Newfoundland Power shall pay all the expenses of the Board incurred in this Application.

Date Issued:

May 29, 2008

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 11 (2008)

Application:

Application for approval of the Rate Stabilization Plan component of the rates to be charged to Newfoundland Power Inc., pursuant to Section 70 (1) of the Public Utilities Act.

Decision:

1.   The Board approves:

(i)      the proposed modifications to the fuel rider component of the Rate Stabilization Plan;

(ii)     the rates to be charged by Hydro to Newfoundland Power, as set out in Schedule “A” to this Order, to be effective for consumption on or after July 1, 2008;

(iii)    the Rate Stabilization Plan Rules as set out in Schedule “B” to this Order, to be effective July 1, 2008; and

(iv)    the revised Industrial Customer Interim rate sheets, as set out in Schedule “C” to this Order, to reflect the name change of “Aur Resources Inc.” to “Teck Cominco Limited”.

2.   Hydro shall pay the expenses of the Board incurred in connection with this matter.

Date Issued:

June 12, 2008

 

 

Newfoundland Power                                                                                            P.U. 12 (2008)

Application:

Application for approval of a contribution in aid of construction for a line extension to serve domestic customers residing in a cottage area pursuant to Section 41(5) of the Act.

Decision:

1.   The Non-Refundable CIAC of four thousand five hundred eighty-eight dollars and ninety-four cents ($4,588.94), excluding HST, as calculated under the Policy to provide single-phase service to Domestic Customers located in the Cottage Area known as Sandy Point (Area 2) located near the community of Norris Arm South, is approved.

2.   Newfoundland Power shall pay all expenses of the Board arising from this Application.

Date Issued:

June 19, 2008

 

 

Newfoundland Power                                                                                            P.U. 13 (2008)

Application:

Application for approval of a contribution in aid of construction for a line extension to serve domestic customers residing in a cottage area pursuant to Section 41(5) of the Act.

Decision:

1.   The Non-Refundable CIAC of eight thousand four hundred thirty-six dollars and fifty-three cents ($8,436.53), excluding HST, as calculated under the Policy to apply to Domestic Customers located in the Cottage Area known as Smith’s Pond, is approved.

2.   Newfoundland Power shall pay all expenses of the Board arising from this Application.

Date Issued:

June 19, 2008

 

 

Newfoundland Power                                                                                            P.U. 14 (2008)

Application:

Application for approval of a contribution in aid of construction for a line extension to serve domestic customers residing in a cottage area pursuant to Section 41(5) of the Act.

Decision:

1.   The Non-Refundable CIAC of two thousand three hundred ninety-two dollars and twenty-four cents ($2,392.24), excluding HST, as calculated under the Policy to apply to Domestic Customers located in the Combined Valley Road Cottage Area for a 20-year period from the date the Line Road Extension is placed in service, is approved.

2.   The refund to each of the existing customers in the Valley Road Cottage Area of the amount of thirty-three dollars and seventy-six cents ($33.76), excluding HST, is approved.

3.   Newfoundland Power shall pay all expenses of the Board arising from this Application.

Date Issued:

June 19, 2008

 

 

Newfoundland Power                                                                                            P.U. 15 (2008)

Application:

Application for approval of Rate Stabilization Adjustment and Municipal Tax Adjustment to be effective July 1, 2008.

Decision:

1.       The Rate Stabilization Adjustment of 0.761 cents/kWh and the Municipal Tax Adjustment factor of 1.02359, to be applied to all bills based on consumption on and after July 1, 2008 to June 30, 2009, are approved.

2.      The rates proposed by Newfoundland Power to be effective on all electrical consumption on and after July 1, 2008 to June 30, 2009, as set out in Schedule A to this Order, are approved.

3.      Newfoundland Power shall pay the expenses of the Board in connection with this Application.

Date Issued:

June 24, 2008

 

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 16 (2008)

Application:

Application for Rate Changes to Island Interconnected Customers (excluding Burgeo School and Library) and Isolated Rural Customers (excluding Government departments) to be effective July 1, 2008

Decision:

1.       The rates proposed by Hydro for its Island Interconnected customers (excluding Burgeo School and Library) and Isolated Rural customers (excluding Government departments) to be effective on all electrical consumption on and after July 1, 2008, as set out in Schedule A to this Order, are approved.

2.       Hydro shall pay the expenses of the Board incurred in connection with this Application.

Date Issued:

June 24, 2008

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 17 (2008)

Application:

Application for approval of three capital projects affecting the Holyrood Thermal Generating Station, pursuant to Section 41(3) of the Act.

Decision:

1.   The additional 2008 capital expenditures of:

(a)    $4,446,200 to replace the Unit 1 Superheater at the Holyrood Thermal Generating Station; and

(b)    $1,278,500 to replace the public address (paging) system at the Holyrood Thermal Generating Station;

are approved.

2.   Hydro shall pay the expenses of the Board arising from this Application.

Date Issued:

June 27, 2008

 

 

Newfoundland Power                                                                                            P.U. 18 (2008)

Application:

Application for approval of capital expenditures supplemental to Newfoundland Power Inc.’s 2008 Capital Budget (2nd Supplemental – wind generation facilities – Newind Group Inc – Burin Peninsula and SkyPower Facility – Fermeuse).

Decision:

1.   The Board approves the following capital expenditures associated with the interconnection of the Wind Farms to Newfoundland Power’s transmission system:

                                                                           i.      $487,000 to make additions and modifications to Newfoundland Power’s Laurentian Substation at St. Lawrence to accommodate the interconnection of the Newind Facility;

                                                                         ii.      $928,000 to make additions and modifications to Newfoundland Power’s Fermeuse Substation on the Southern Shore of the Avalon Peninsula to accommodate the interconnection of the SkyPower Facility, and for associated metering and protective relaying additions and modifications at Newfoundland Power’s Cape Broyle, Mobile and Big Pond Substations; and

                                                                        iii.      $88,000 to make modifications to Newfoundland Power’s transmission line terminating at Laurentian Substation to accommodate the interconnection of the Newind Facility.

2.   Newfoundland Power shall pay all the expenses of the Board arising from this Application.

Date Issued:

July 11, 2008

 

 

Newfoundland Power                                                                                            P.U. 19 (2008)

Application:

Application for approval of capital expenditures supplemental to Newfoundland Power Inc.’s 2008 Capital Budget (3rd Supplemental –Underground civil infrastructure for utility power cables in Water Street and Harbour Drive areas of St. John’s).

Decision:

1.      The Board approves the additional 2008 capital expenditures of $1,930,000 associated with the installation of underground civil infrastructure for utility power cables in Water Street and Harbour Drive areas of St. John’s.

2.      Newfoundland Power shall pay all the expenses of the Board arising from this Application.

Date Issued:

July 31, 2008

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 20 (2008)

Application:

Amended Application for the approval, pursuant to Sections 78 and 80 of the Act, for inclusion in rate base of certain Interconnection expenditures incurred by Hydro, and for the deferral and recognition of certain power purchase costs incurred by Hydro, all with respect to two wind energy purchase agreements.

Decision:

1.       Hydro’s proposal to set up a deferral account for the unrecoverable Interconnection Costs associated with the Power Purchase Agreements, at an estimated cost of $500,000, together with financing costs, is approved (the “Deferral Account”).

2.       Hydro’s proposal to include the unamortized balance of the Deferral Account in the rate base for 2008 is approved.

3.       Hydro shall recognize the balance of the Deferral Account as an expense in 2009.

4.       Hydro shall pay the expenses of the Board incurred in connection with this Application.

Date Issued:

September 3, 2008

 

 

Newfoundland Power                                                                                            P.U. 21 (2008)

Application:

Application for approval to proceed with the construction and purchase of certain improvements to its property pursuant to Section 41(3) of the Act. [Reference Order No. P. U. 27(2007) – NP 2008 Capital Budget]

Decision:

The Board approves the amount of $70,000 in leases for 2008 pursuant to Section 41 of the Act.

Date Issued:

                  September 8, 2008

 

 

Newfoundland Power                                                                                            P.U. 22 (2008)

Application:

Application for approval, pursuant to Section 91(5) of the Act to amend an existing committed revolving term credit facility to extend the maturity date.

Decision:

1.       Pursuant to Section 91(5) of the Act, the Board approves:

a)       the extension of the maturity date associated with the Amended Committed Facility to August 29, 2011;

b)      such further extensions of the maturity date as may be requested by Newfoundland Power and agreed to by the lenders; and

c)      the deletion of the material adverse change provision described in paragraph 6 of the Application

d)      all as contemplated by the Second Amending Agreement.

2.   Newfoundland Power shall pay all the expenses of the Board arising from this Application.

Date Issued:

      September 17, 2008

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 23 (2008)

Application:

Application for approval to undertake a Condition Assessment and Life Extension Study for the Holyrood Thermal Generating Station pursuant to Section 41(3) of the Act.

Decision:

1.       An additional 2008 expenditure of $420,000 to begin the proposed Condition Assessment and Life Extension Study for the Holyrood Thermal Generating Station, which involves the issuance of a request for proposals, evaluation of the proposals and the preparation of a detailed scope of work, is approved.

2.       Newfoundland and Labrador Hydro shall pay all the expenses of the Board arising from this Application.

Date Issued:

September 25, 2008

 

 

Newfoundland Power                                                                                            P.U. 24 (2008)

Application:

Application for approval to proceed with the construction and purchase of certain  improvements to its property pursuant to Section 41(3) of the Act (the “Application”).

Decision:

1.       Pursuant to Section 41(3) of the Act the Board approves the additional 2008 capital expenditures associated with the purchase of 17 photocopiers as proposed in the Application.

2.      Newfoundland Power shall pay all the expenses of the Board arising from this Application.

Date Issued:

October 1, 2008

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 25 (2008)

Application:

Application for approval of a capital project to purchase a front end loader, pursuant to Section 41(3) of the Act.

Decision:

1.       Pursuant to Section 41(3) of the Act, the Board approves the additional capital expenditures of $220,000 for the purchase of a front end loader.

2.       Hydro shall pay the expenses of the Board arising from this Application.

Date Issued:

October 1, 2008

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 26 (2008)

Application:

Application for approval to install neutral grounding resistors at Come By Chance terminal station and approval of an associated customer contribution, pursuant to Sections 41(3) and 41(5) of the Act.

Decision:

1.       Pursuant to Section 41(3) of the Act the Board approves the capital expenditure of $272,271 for installation of neutral grounding resistors at the Come By Chance terminal station, which asset will be specifically assigned to North Atlantic Refining Limited upon completion of the capital project.

2.       Pursuant to Section 41(5) of the Act the Board approves the contribution from the customer, North Atlantic Refining Limited, of the final capital cost of the project.

3.       Hydro shall pay the expenses of the Board arising from this Application.                                    

Date Issued:

October 1, 2008

 

 

Newfoundland Power                                                                                            P.U. 27 (2008)

Application:

Application for approval of, pursuant to Sections 41 and 78 of the Act:

a)       its 2009 Capital Budget of $61,571,000;

b)      its 2009 leases of $11,000 per year; and

c)      fixing and determining its average rate base for 2007 in the amount of $793,703,000.

Decision:

1.       Pursuant to Section 41 of the Act Newfoundland Power’s capital purchases and construction projects in excess of $50,000, as set out in Schedule A to this Order, are approved.

2.       Pursuant to Section 41 of the Act the 2009 Capital Budget for improvements and additions to Newfoundland Power’s property in an amount of $61,571,000 is approved.

3.       Pursuant to Section 41 of the Act the 2009 leases of $11,000 per year, as set out in Schedule B to this Order, are approved.

4.       Pursuant to Section 78 of the Act the average rate base for the year ending December 31, 2007 is hereby fixed and determined at $793,703,000.

5.       Unless otherwise directed by the Board, Newfoundland Power shall file an annual report to the Board on its 2009 capital expenditures by March 1, 2010.

6.       Unless otherwise directed by the Board, Newfoundland Power shall provide in conjunction with the 2010 Capital Budget Application, a status report on the 2009 capital budget expenditures showing for each project:

                                                                                 i.      the approved budget for 2009;

                                                                               ii.      the expenditures prior to 2009;

                                                                              iii.      the 2009 expenditures to the date of the Application;

                                                                             iv.      the remaining projected expenditures for 2009;

                                                                               v.      the variance between the projected total expenditures and the approved budget; and

                                                                             vi.      an explanation of the variance.

7.   Newfoundland Power shall pay all costs and expenses of the Board incurred in connection with the Application.

Date Issued:

November 12, 2008

 

 

Newfoundland Power                                                                                            P.U. 28 (2008)

Application:

Application for approval to proceed with the construction and purchase of certain improvements to its property pursuant to Section 41(3) of the Act (the “Application”).

Decision:

1.       The Non-Refundable CIAC of Three thousand one hundred eighty-four dollars and seventy-one cents ($3,184.71), excluding HST, as calculated under the Policy to apply to Domestic Customers located in the Cottage Area known as Monroe’s Pond, is approved.

2.       Newfoundland Power shall pay all expenses of the Board arising from this Application.

Date Issued:

November 20, 2008

 

 

Newfoundland Power                                                                                            P.U. 29 (2008)

Application:

Application for approval to remove a distribution line from service in the Stephenville Flood Zone pursuant to Section 38 of the Act (the “Application”).

Decision:

1.       Pursuant to Section 38 of the Act, the Board consents to the removal of the Line from the Flood Zone as proposed in the Application.

2.       Newfoundland Power shall pay all expenses of the Board arising from this Application.

Date Issued:

November 20, 2008

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 30 (2008)

Application:

Application by Newfoundland and Labrador Hydro (“Hydro”) for the approval of an upgrade to transmission lines TL-227 and TL-262 (the “Application”), pursuant to Section 41(3) of the Act.

Decision:

1.       Pursuant to Section 41(3) of the Act, the Board approves the capital expenditure of $350,300 for the upgrade to transmission lines TL-227 and TL-262.

2.       Hydro shall pay all expenses of the Board arising from this Application.                                     

Date Issued:

November 20, 2008

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 31 (2008)

Application:

Application by Newfoundland and Labrador Hydro (“Hydro”) for the approval of the deferral of expenses associated with the repair of the Unit 2 Turbine at the Holyrood Thermal Generating Station as a Major Extraordinary Repair (the “Application”), pursuant to Sections 69, 78 and 80 of the Act.

Decision:

1.       The Application is denied.

2.       Hydro shall pay the expenses of the Board arising from this Application.                                    

Date Issued:

December 18, 2008

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 32 (2008)

Application:

Application by Newfoundland and Labrador Hydro (“Hydro”) for the approval to extend the amortization period for deferral of Major Extraordinary Repairs from five to seven years (the “Application”), pursuant to Sections 69, 78 and 89 of the Act.

Decision:

1.       The Application is denied.

2.       Hydro shall pay the expenses of the Board arising from this Application..        

Date Issued:

December 18, 2008

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 33 (2008)

Application:

Application by Newfoundland and Labrador Hydro (“Hydro”) for the approval of a Contribution in Aid of Construction (“CIAC”) for a single-phase line extension to serve the Walsh’s River Cottage Area, near Labrador City (the “Application”), pursuant to Section 41(5) of the Act.

Decision:

1.       The Contribution in Aid of Construction in the amount of $475,704.62, including HST; to be paid in two separate amounts of $93,000.00 in 2008 and $382,704.62 in 2009, for the supply of single phase electrical service to 19 domestic customers, located at the Walsh’s River Cottage Area near Labrador City, as calculated under the Policy, is approved.

2.       Hydro shall pay the expenses of the Board incurred in connection with this Application.           

Date Issued:

December 18, 2008

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 34 (2008)

Application:

Application by Newfoundland and Labrador Hydro (“Hydro”) for the approval of changes in the rates to be charged for the supply of power and energy to Labrador Interconnected customers and related changes to the Rate Stabilization Plan Rules, (the “Application”), pursuant to Sections 70 and 71 of the Act.

Decision:

1.       The decrease of the monthly amount of the 2009 automatic rate adjustment in the Rural Rate Alteration for the Labrador Interconnected customers in the Rate Stabilization Plan from $32,433 to ($5,766), is approved on a final basis, as attached in Schedule A.

2.       The Schedule of Rates for the Labrador Interconnected customers, as attached in Schedule B, is approved on a final basis, effective January 1, 2009.

3.       Hydro shall pay the expenses of the Board arising from this Application.

Date Issued:

December 22, 2008

 

 

Newfoundland Power                                                                                            P.U. 35 (2008)

Application:

Application for approval of the Operation of the Automatic Adjustment Formula for 2009.

Decision:

1.       The Board approves:

                                                                     i.            a rate of return on rate base for 2009 of 8.37% in a range of 8.19% to 8.55%; and

                                                                   ii.            Newfoundland Power’s continued use of the current Customer Rates approved by Order No. P. U. 15(2008), with effect from January 1, 2009.

2.   Newfoundland Power shall pay the expenses of the Board arising from this Application.

Date Issued:

December 22, 2008

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 36 (2008)

Application:

Application for approval of (a) its 2009 Capital Budget of $47,856,000; (b) its 2009 capital budget purchases and construction projects in excess of $50,000; (c) its 2009 leases of $6,720 per year; (d) the proposed estimated contributions in aid of construction for 2009; and (d) fixing and determining its average rate base for 2007 in the amount of $1,484,545,000.

Decision:

1.       Pursuant to Section 41 of the Act, Hydro’s proposed capital purchases and construction projects in excess of $50,000 are approved, as set out in Schedule A to this Order.

2.       Pursuant to Section 41 of the Act, the 2009 Capital Budget for improvements and additions to Hydro’s property in an amount of $ 47,856,000 is approved.

3.       Pursuant to Section 41 of the Act, the 2009 lease in the amount $6,720 is approved.

4.       Unless otherwise directed by the Board, Hydro shall file an annual report to the Board on its 2009 capital expenditures by March 1, 2010.

5.       Unless otherwise directed by the Board Hydro shall provide, in conjunction with the 2010 Capital Budget Application, a status report on the 2009 capital budget expenditures showing for each project:

                                                                     i.            the approved budget for 2009;

                                                                   ii.            the expenditures prior to 2009;

                                                                  iii.            the 2009 expenditures to the date of the application;

                                                                 iv.            the remaining projected expenditures for 2009;

                                                                   v.            the variance between the projected total expenditures and the approved budget; and

                                                                 vi.            an explanation of the variance.

                                                       6.      Hydro shall pay all costs and expenses of the Board incurred in connection with the Application.

Date Issued:

December 23, 2008

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 37 (2008)

Application:

Application by Newfoundland and Labrador Hydro (“Hydro”) for the approval of the Rate Stabilization Plan components of the rates to be charged to Island Industrial Customers (the “Application”), pursuant to Section 70(1) of the Act.

Decision:

1.       The continuation of the rates, rules and regulations for Hydro’s Island Industrial Customers is approved on an interim basis from January 1, 2009 to March 31, 2009, with the Schedule of Rates as attached in Schedule A.

2.       Hydro shall make application to finalize the interim rates, rules and regulations for the Island Industrial Customers by January 30, 2009.

3.       Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

December 24, 2008

 

 

Newfoundland and Labrador Hydro                  P.U. 38 (2008) is Rescinded see P.U. 1 (2009)

Application:

Application for Rate Changes to Island Interconnected Customers and Isolated Rurual Customers (Interim Order).

Decision:

1.       The Board approves on an interim basis the rates as attached in Schedule A to be effective for consumption on and after January 1, 2009 until a final order of the Board with respect to the within matter.

2.       The continuation of the rebate to Hydro’s domestic customers served from the Labrador Isolated and L’Anse au Loup (Labrador Straits) system is approved on an interim basis.

3.       Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

December 31, 2008


Newfoundland and Labrador Hydro                                                                        P.U. 1 (2007)

Application:

For approval, pursuant to Sections 70, 71 and 75 of the Act, of certain rules, regulations and rates pertaining to the supply of electrical power and energy to one of its industrial customers, Aur Resources Inc.

Decision:

1.       Page 2 of Schedule “A” of PU 31(2006) shall be replaced with the attached page 2 of 2 Schedule “A”, attached hereto as Schedule “A”, which correctly sets out that the rates established for Aur Resources Inc., in Order No. P.U. 31(2006) are interim.

2.       The Board approves, pursuant to section 75 of the Act:

(a)    Firm and Non-Firm Rates for Aur Resources Inc., attached hereto as Schedule “B”, to be effective for consumption on or after January 20, 2006 to and including September 30, 2006;

(b)    Firm and Non-Firm Rates for Aur Resources Inc., attached hereto as Schedule “C”, to be effective for consumption on or after October 1, 2006 to and including December 31, 2006; and

(c)    Refund or credit to Aur Resources Inc., of the difference for 2006 between the rates developed in accordance with the Agreement and those approved in Order No. P.U. 1(2006)

3.       The Service Agreement attached hereto as Schedule “D” is approved for the provision of service to Aur Resources Inc.

4.       Hydro shall pay the expenses of the Board incurred in connection with this matter.

Date Issued:

January 18, 2007

 

 

Newfoundland Power                                                                                              P.U. 2 (2007)

Application:

For approval, pursuant to Section 41(5) of the Act, of (i) a contribution in aid of construction (CIAC) for a line extension to serve Domestic Customers residing in a cottage area located in a Cottage Area at Nine Island Pond near Roaches Line and (ii) a deviation from the CIAC Policy applicable to Domestic Customers in relation to the calculation of the participation percentage as provided for in Clause 6 (a)(ii) of the Policy.

Decision:

Pursuant to Section 41(5) of the Act, the Board approves the Non-Refundable Contribution in Aid of Construction in the amount of Three thousand three hundred ninety-three dollars and fifty-three cents ($3,393.53), including HST, per Customer as calculated under the Policy, and the deviation from the Policy as requested in the Application, to provide single-phase service to Domestic Customers located in a Cottage Area located at Nine Island Pond near Roaches Line.

Date Issued:

January 22, 2007

 

 

Newfoundland and Labrador Hydro                                                                        P.U. 3 (2007)

Application:

For approval, pursuant to Section 75 of the Act, of rates flowing from the Rate Stabilization Plan (“RSP”) components of the rates to be charged to Island Interconnected Industrial Customers (“Industrial Customers”).

Decision:

1.       Pursuant to section 75 of the Act, the Board hereby approves on an interim basis the RSP Adjustment and Energy Rates for Hydro’s Industrial Customers as set out in the attached Schedule “A” to be effective for consumption on or after January 1, 2007.

2.       Hydro shall pay the expenses of the Board incurred in connection with this matter.

Date Issued:

January 29, 2007

 

 

Newfoundland and Labrador Hydro                                                                        P.U. 4 (2007)

Application:

For approval of the lease of office space for its Northern Region Operations (St. Anthony) pursuant to Section 41 of the Act.

Decision:

1.       Pursuant to Section 41 (3) of the Act, the Board approves the Applicant’s proposed two-year lease of garage space at St. Anthony, for a rental amount of $3,750 per month, plus HST.

2.       The Applicant shall pay all expenses of the Board arising from this Application.

Date Issued:

March 20, 2007

 

 

Newfoundland and Labrador Hydro                                                                        P.U. 5 (2007)

Application:

For approval of an automobile lease pursuant to Section 41 of the Act.

Decision:

1.       Pursuant to Section 41 (3) of the Act, the Board approves the Applicant’s proposed three-year lease of an automobile in the amount of $562.69 per month (excluding HST) for a total of $6,752.28 per annum.

2.       The Applicant shall pay all expenses of the Board arising from this Application.

Date Issued:

March 26, 2007

 

 

Newfoundland Power                                                                                              P.U. 6 (2007)

Application:

For approval of a contribution in aid of construction (CIAC) pursuant to Section 41(5) of the Act.

Decision:

1.       Pursuant to Section 41(5) of the Act, the Board approves the Non-Refundable CIAC of Four thousand one hundred thirty-six dollars and ninety-three cents ($4,136.93), including HST, as calculated under the Policy to provide single-phase service to Domestic Customers located in the Cottage Area described as Witless Bay Line (Phase 2) located near the community of Witless Bay.

2.       The Applicant shall pay the expenses of the Board arising from this Application.

Date Issued:

March 26, 2007

 

 

Newfoundland and Labrador Hydro                                                                        P.U. 7 (2007)

Application:

For approval of a contribution in aid of construction (CIAC) pursuant to Section 41(5) of the Act.

Decision:

1.       Pursuant to Section 41(5) of the Act, the the Contribution in Aid of Construction in the amount of Two thousand five hundred forty-seven dollars and ninety cents ($2,547.90), including HST, as calculated under the Policy to provide single-phase service to 32 seasonal residential customers located at the Northwest Arm Cottage Areas (Section C), Hare Bay, located off route 430, as calculated under the Policy is approved.

2.       The Applicant shall pay all expenses of the Board arising from this Application.

Date Issued:

April 11, 2007

 

 

Newfoundland and Labrador Hydro                                                                        P.U. 8 (2007)

Application:

For approval of, inter alia, rate to be charged its customers effective January 1, 2007.

Decision:

Rate Base and Rate of Return

1.       Pursuant to Section 78 of the Act the Board approves the forecast average rate base for the 2007 test year of $1,489,323,000.

2.       Pursuant to Section 80 of the Act the Board hereby allows a rate of return on rate base, based on the 2007 test year, of 7.44%, within a range of 7.29% to 7.59%.

Rates, Rules and Regulations

3.       Pursuant to Sections 70 and 75 of the Act the Board hereby approves, on a final basis, the interim rates approved in Order Nos. P.U. 41(2006) and P.U. 3(2007) for Utility and Industrial Customers, as set out in Schedule A of this Decision and Order, effective for consumption on and after January 1, 2007.

4.       Hydro shall, within fifteen days of the Order approving final rates for customers of NP, apply to the Board for approval of final rates and Rules and Regulations for its Rural customers, and RSP Rules.

5.       Hydro shall distribute the balance of the reserve account established in Order No. P.U. 46(2006) in accordance with the provisions of the special adjustment to the RSP Hydraulic Production Variation Balance, as set out in Schedule B of this Decision and Order.

Reporting

6.       Hydro shall file with the Board no later than May 31, 2007 a copy of the terms which are proposed for the RSP review, setting out the terms of reference, the specific review objectives, a list of participants, a planned timeline and an outline of the review process.

7.       Hydro shall include in its quarterly reports, beginning with its June 30, 2007 report and ending with its December 31, 2008 report, an update on the progress of the development of a comprehensive maintenance plan and associated reliability standards.

8.       Hydro shall file with the Board no later than October 31, 2007 a report updating the progress, as of September 30, 2007, of the development of an acceptable peer group for financial KPI’s.

9.       Hydro shall file with the Board no later than June 30, 2008 a report outlining its five-year strategic plan with respect to energy conservation initiatives, including a description, timing, and cost of the program elements to be implemented by Hydro and a copy of the CDM Potential Study.

Costs

10.   Hydro shall pay the expenses of the Board arising from this Application, including the expenses of the Consumer Advocate incurred by the Board, pursuant to Sections 90(2) and 117 of the Act.

11.   Hydro shall pay costs of the Industrial Customers in the amount of $195,000 pursuant to Section 90(1) of the Act.

Date Issued:

April 12, 2007

 

 

Newfoundland Power                                                                                              P.U. 9 (2007)

Application:

For final approval of a schedule of rates, tolls and charges approved by the Board on an interim basis in Order No. P.U. 42 (2006).

Decision:

1.       Pursuant to section 70 of the “Act”, the rates, tolls and charges as set out in Schedule A are approved, to be effective on all electrical usage on and after January 1, 2007.

2.       NP shall pay the costs and expenses of the Board in connection with this application.

Date Issued:

April 20, 2007

 

 

Newfoundland Power                                                                                            P.U. 10 (2007)

Application:

In the matter of the Purchased Power Unit Cost Variance Reserve Account (the “Reserve Account”) Established by Order No. P.U. 35 (2005), an application:

(i)   Deferring Consideration of the Disposition of the Balance in the Reserve Account; and

(ii)  Approving a Revised Definition of the Reserve Account in Newfoundland Power’s System of Accounts Pursuant to Sections 58 and 70 of the Act.

Decision:

1.       Deferral of consideration of the Purchased Power Unit Cost Variance Reserve Account in to the hearing of NP’s general rate application to be filed in 2007; and

2.       Pursuant to Section 58 of the Act, the revised definition of the Purchased Power Unit Cost Variance Reserve Account, as set out in Schedule A, to be included in NP’s System of Accounts.

Date Issued:

April 24, 2007

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 11 (2007)

Application:

For approval of the Rate Stabilization Plan component of the rates to be charged to Newfoundland Power effective July 1, 2007, pursuant to Section 70 (1) of the Act.

Decision:

1.       The Board hereby approves the rates to be charged by Hydro to Newfoundland Power, as set out in Schedule A to this Order, to be effective for consumption on or after July 1, 2007.

2.       Hydro shall pay the expenses of the Board incurred in connection with this matter.

Date Issued:

May 9, 2007

 

 

Newfoundland Power                                                                                            P.U. 12 (2007)

Application:

For approval of the balance of the weather normalization reserve as of December 31, 2006, pursuant to Sections 69(3) and 78 of the Act.

Decision:

1.       NP’s weather normalization reserve of a Negative Balance of $11,808,813 as at December 31, 2006 is hereby approved.

Date Issued:

May 10, 2007

 

 

Newfoundland Power                                                                                            P.U. 13 (2007)

Application:

For approval of the:

i)        revised distribution line cost per meter for Contributions in Aid of Construction (CIAC’s);

ii)       revised distribution plant upgrade cost for CIAC’s; and

iii)     revised CIAC cost factors.

Decision:

1.       The revised cost factors submitted with the application and contained in the Schedules appended to this Order are approved to be used in the calculation of all CIAC’s with effect from May 15, 2007, and, where advantageous to customers of Newfoundland Power, on all CIAC’s quoted but unpaid as of May 15, 2007.

2.       Newfoundland Power submit a revised CIAC Policy in its entirety incorporating the revisions approved herein.

Date Issued:

May 10, 2007

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 14 (2007)

Application:

For final approval of rates to be charged for the supply of power and energy to Rural Customers, and changes in the Rules and Regulations applicable to the supply of electricity to Rural Customers pursuant to Sections 70 and 71 of the Act.

Decision:

1.       Pursuant to Sections 70 and 71 of the Act, the Board approves the Rate Stabilization Plan rules, as set out in Schedule A to this Order, effective December 31, 2006.

2.       Pursuant to Section 71 of the Act, the Board approves the Rules and Regulations applicable to providing service to Rural Customers as set out in Schedule B to this Order, effective January 1, 2007.

3.       The rates, tolls and charges for Hydro’s Rural customers are approved on a final basis, to be effective for consumption on and after January 1, 2007, as set out in Schedule C to this Order.

4.       Page 6 of 8, Schedule A, Order No. P. U 8(2007) shall be amended and replaced as set out in Schedule D to this Order.

5.       Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

May 17, 2007

 

 

Newfoundland Power                                                                                            P.U. 15 (2007)

Application:

For approval of the:

(i)            Rate Stabilization and Municipal Tax Adjustments to be applied to the rates of NP for the period July 1, 2007 to June 30, 2008; and

(ii)          a Revised Schedule of Rates, Tolls and Charges reflecting the amended Rate Stabilization and Municipal Tax Factors, effective July 1, 2007 to June 30, 2008, pursuant to Section 70 (1) of the Act.

Decision:

1.       The Rate Stabilization Adjustment of 0.157 cents/kWh as set out in Schedule A to this Order and the Municipal Tax Adjustment factor of 1.02490 as set out in Schedule B to this Order, to be applied to all bills based on consumption on and after July 1, 2007 to June 30, 2008, are approved.

2.       The rates proposed by Newfoundland Power to be effective on all electrical consumption on and after July 1, 2007 to June 30, 2008, as set out in Schedule C to this Order, are approved.

3.       Newfoundland Power shall pay the expenses of the Board in connection with this Application.

Date Issued:

May 22, 2007

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 16 (2007)

Application:

For the approval of a change in the rates to be charged for the supply of power and energy to Island Interconnected customers (excluding Burgeo School and Library) and Isolated Rural customers (excluding Government departments), pursuant to Section 70 of the Act.

Decision:

1.       The rates proposed by Hydro’s for its Island Interconnected customers (excluding Burgeo School and Library) and Isolated Rural customers (excluding Government departments) to be effective on all electrical consumption on and after July 1, 2007, as set out in Schedule A to this Order, are approved.

2.       Hydro shall pay the expenses of the Board incurred in connection with this matter.

Date Issued:

June 19, 2007

 

 

Newfoundland Power                                                                                            P.U. 17 (2007)

Application:

Procedural Order re: General Rate Application by Newfoundland Power Inc. to establish customer electricity rates for 2008.

Decision:

The registered Intervenors, the schedule of dates, and the procedures for the hearing of the Application are as set out in Appendix “A” to this Order.

Date Issued:

June 22, 2007

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 18 (2007)

Application:

For approval of certain rules and regulations pertaining to the supply of electrical power and energy to one of its industrial customer, Corner Brook Pulp and Paper Limited  (CBPP) pursuant to Sections 70 and 71 of the Act.

Decision:

1.       The Board approves the amendment of Clause 4.01 of the CBPP Service Agreement such that the sentence that reads:

“Provided the Amount of Power on Order is equal to or greater than 20,000 kW, the amount of Interruptible Demand and Energy available shall be the greater of 10% of the Amount of Power on Order and 5,000 kW.”

be deleted and replaced with:

“Provided the Amount of Power on Order is equal to or greater than 20,000 kW, the amount of Interruptible Demand and Energy available shall be the greater of 10% of the Amount of Power on Order and 5,000 kW, but for the period from May 1, 2007 through to December 31, 2007, both inclusive, the amount of Interruptible Demand and Energy available shall be 15,200 kW.”

2.       Hydro shall pay the expenses of the Board arising out of this Application.

Date Issued:

June 28, 2007

 

 

Newfoundland Power                                                                                            P.U. 19 (2007)

Application:

Request for an amendment to Order No. P. U. 13(2007) (Appendix C, Schedule D – Distribution Plan Upgrade Cost for General Service CIACs).

Decision:

Board Order No. P. U. 13(2007) be amended by deleting therefrom Schedule D, Distribution Plant Upgrade Cost for General Service CIACs, and substituting therefore the Schedule appended to this Order.

Date Issued:

June 28, 2007

 

 

Newfoundland Power                                                                                            P.U. 20 (2007)

Application:

Approval of a Contribution in Aid of Construction (“CIAC”) for a line extension to serve cottage area customers (the “Customers”) located at pursuant to Section 41(5) of the Act

Decision:

1.       The Board approves the Non-Refundable CIAC of Three thousand eight hundred fifteen dollars and one cent ($3,815.01), including HST, as calculated under the Policy to provide single-phase service to Domestic Customers located in the Cottage Area described as Beachy Cove Pond, pursuant to s. 41(5) of the Act,

2.       The Applicant shall pay all expenses of the Board arising from this Application.

Date Issued:

June 28, 2007

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 21 (2007)

Application:

For approval of rate rebates for Hydro’s domestic customers served from the Labrador Isolated and L’Anse au Loup (Labrador Straits) systems, pursuant to Section 70(1) of the Act.

Decision:

1.       The Board approves the implementation by Hydro of a rebate to its domestic customers served from the Labrador Isolated and L’Anse au Loup (Labrador Straits) system.

2.       The rebate will be an amount credited to each customer’s bill such that the basic customer charge and the lifeline energy block  (seasonal) for those customers is equivalent to that charged for the same service to Hydro’s residential Happy Valley-Goose Bay Labrador Interconnected electricity customers.

3.       The rebate shall be effective for bills issued on and after July 1, 2007.

4.       Hydro shall not recover the rebate or any associated costs through rates charged to electricity consumers.

Date Issued:

July 6, 2007

 

 

Newfoundland Power                                                                                            P.U. 22 (2007)

Application:

Approval of a Contribution in Aid of Construction (“CIAC”) for a line extension to serve cottage area customers (the “Customers”) located at pursuant to Section 41(5) of the Act

Decision:

1.       The Board approves the Non-Refundable CIAC of Four thousand three dollars and thirty-two cent ($4,003.32), including HST, as calculated under the Policy to provide single-phase service to Domestic Customers located in the Cottage Area described as Paul’s Lake located near Badger Lake, pursuant to s. 41(5) of the Act.

2.       The Applicant shall pay all expenses of the Board arising from this Application.

Date Issued:

July 18, 2007

 

 

Newfoundland Power                                                                                            P.U. 23 (2007)

Application:

Approval of a Contribution in Aid of Construction (“CIAC”) for a line extension to serve cottage area customers (the “Customers”) located at pursuant to Section 41(5) of the Act

Decision:

1.       The Board approves the Non-Refundable CIAC of Seven thousand six hundred seventy dollars and seventy-eight cent ($7,670.78), including HST, as calculated under the Policy to provide single-phase service to Domestic Customers located in the Cottage Area described as Snow’s Pond, located near the community of North River, Conception Bay, pursuant to s. 41(5) of the Act.

2.       The Applicant shall pay all expenses of the Board arising from this Application.

Date Issued:

July 18, 2007

 

 

Newfoundland Power                                                                                            P.U. 24 (2007)

Application:

Approval to issue Series AL First Mortgage Sinking Fund Bonds pursuant to Section 91 of the Act.

Decision:

1.       Approval is hereby given to Newfoundland Power to issue Series AL First Mortgage Sinking Fund Bonds in an amount of up to $75,000,000 and on the general terms set out in the Application subject to the following conditions:

(a)    The Bonds shall be issued on or before December 31, 2007.

(b)    Newfoundland Power shall provide to the Board an Affidavit specifying the terms and conditions of the Bond issue within five (5) days (non-business days excepted) after closing the Bond issue.  In particular, the Affidavit shall set forth the following:

(i)                  date of the issue;

(ii)                term;

(iii)               maturity date;

(iv)              principal amount;

(v)                coupon rate;

(vi)              particulars of sinking fund, if any;

(vii)             price to the public and to the underwriters;

(viii)           yield to the public;

(ix)              agency fee;

(x)                actual cost (i.e. yield) to Newfoundland Power; and

(xi)              any other material terms or conditions not contemplated at the date of the Application but forming part of the negotiated terms and conditions.

(c)    Newfoundland Power shall provide to the Board a copy of the Agency Agreement relating to the Bond issue within five (5) days (non-business days excepted) after closing the Bond issue.

(d)    The proceeds from the Bond issue shall be used in the manner set out in paragraph 9 of the Application, and Newfoundland Power shall report by Affidavit to the Board on the disposition of the proceeds no later than January 15, 2008.

2.       All costs and expenses incurred by the Board in connection with the Application shall be borne by Newfoundland Power.

Date Issued:

July 26, 2007

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 25 (2007)

Application:

For the approval of (1) the construction of off-loading ramps for mobile transmission line maintenance equipment, and (2) the acquisition and installation of an ICP Spectrometer for the Holyrood Generating Station, pursuant to Section 41(3) of the Act.

Decision:

1.       The additional 2007 capital expenditure of $231,000 to acquire an install an inductively coupled plasma mass spectrometer for use at Hydro’s Holyrood Thermal Generating Station is approved.

2.       The withdrawal by Hydro of the Application for approval of additional 2007 capital expenditures in relation to the off-loading ramps is accepted and this Application will be set over and considered as part of Hydro’s 2008 capital budget application, which is currently before the Board.

3.       Hydro shall pay the expense of the Board arising from this Application.

Date Issued:

August 31, 2007

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 26 (2007)

Application:

For the approval of a contribution in aid of construction (CIAC) for a three-phase line extension to serve the Anaconda Mining Inc., mine site located at Pine Cove, off Route 418, pursuant to Section 41(5) of the Act.

Decision:

1.       The Board approves the contribution in aid of construction in the amount of $314,325.91, including HST, for the supply of three-phase electrical service to one general service customers, Anaconda Mining Inc., located at Pine Cove, off Route 418, as calculated under the Policy, pursuant to s. 41(5) of the Act.

2.       The Applicant shall pay all expenses of the Board arising from this Application.

Date Issued:

September 4, 2007

 

 

Newfoundland Power                                                     P.U. 27 (2007)  see also P.U. 21 (2008)

Application:

Application for approval of (a) its 2008 Capital Budget of $50,754,000; and (b) fixing and determining its average rate base for 2006 in the amount of $752,917,000.

Decision:

1.       Pursuant to Section 41 of the Act, NP’s capital purchases and construction projects in excess of $50,000, as set out in Schedule A to this Order, are approved.

2.       Pursuant to Section 41 of the Act, the 2008 Capital Budget for improvement and additions to NP’s property in an amount of $ 50,754,000 is approved.

3.       Pursuant to Section 78 of the Act, the rate base for the year ending December 31, 2006 is hereby fixed and determined at $ 752,917,000.

4.       Unless otherwise directed by the Board, NP shall file an annual report to the Board on its 2008 capital expenditures by March 1, 2009.

5.       Unless otherwise directed by the Board, NP shall provide in conjunction with the 2009 Capital Budget Application, a status report on the 2008 capital budget expenditures showing for each project:

(i)                   the approved budget for 2008;

(ii)                 the expenditures prior to 2008;

(iii)                the 2008 expenditures to the date of the application;

(iv)               the remaining projected expenditures for 2008;

(v)                 the variance between the projected total expenditures and the approved budget; and

(vi)               an explanation of the variance.

6.       NP shall pay all costs and expenses of the Board incurred in connection with the Application.

Date Issued:

September 19, 2007

 

 

Newfoundland Power                                                                                            P.U. 28 (2007)

Application:

Re: General Rate Application by Newfoundland Power Inc. to establish customer electricity rates for 2008.

Decision:

1.       The remaining schedule of dates for the proceeding will be as set out in Appendix “A”, unless otherwise determined by the Board.

Date Issued:

October 5, 2007

 

 

Newfoundland Power                                                                                            P.U. 29 (2007)

Application:

Approval of a Contribution in Aid of Construction (“CIAC”) for a line extension to serve cottage area customers (the “Customers”) located at pursuant to Section 41(5) of the Act.

Decision:

1.       The Board approves the Non-Refundable CIAC of One thousand six hundred nineteen dollars and ninety-four cent ($1,619.94), including HST, as calculated under the Policy to provide single-phase service to Domestic Customers located in the Cottage Area known as Dribble Road located near Robinsons, pursuant to s. 41(5) of the Act.

2.       The Applicant shall pay all expenses of the Board arising from this Application.

Date Issued:

November 8, 2007

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 30 (2007)

Application:

Application for approval of (a) its 2008 Capital Budget of $45,061,000; (b) its 2008 capital budget purchases and construction projects in excess of $50,000; (c) the proposed estimated contributions in aid of construction for 2008; and (d) fixing and determining its average rate base for 2006 in the amount of $1,472,184,000.

Decision:

1.       Pursuant to Section 41 of the Act, Hydro’s proposed capital purchases and construction projects in excess of $50,000 are approved, as set out in Schedule A to this Order.

2.       Pursuant to Section 41 of the Act, the following projects as proposed by Hydro are not approved:

(i)                   Upgrade Continuous Emissions Monitoring System (pg. B-39) $688,900;

(ii)                 Construct Bushing Storage Building (pg. B-136) $334,900; and

(iii)                Public Address System – Holyrood (pg. B-192) $1,139,100.

3.       Pursuant to Section 41 of the Act, the project “Replace Line Camp 98 – TL-228 (pg. B-89) $500,000” is approved but the costs for this project shall not be recovered from customers unless otherwise directed by the Board.

4.       Pursuant to Section 41 of the Act, the 2008 Capital Budget for improvement and additions to Hydro’s property in an amount of $ 42,898,100 is approved.

5.       Pursuant to Section 78 of the Act, the rate base for the year ending December 31, 2006 is hereby fixed and determined at $ 1,472,184,000.

6.       Unless otherwise directed by the Board, Hydro shall file an annual report to the Board on its 2008 capital expenditures by March 1, 2009.

7.       Unless otherwise directed by the Board Hydro shall provide, in conjunction with the 2009 Capital Budget Application, a status report on the 2008 capital budget expenditures showing for each project:

(i)                   the approved budget for 2008;

(ii)                 the expenditures prior to 2008;

(iii)                the 2008 expenditures to the date of the application;

(iv)               the remaining projected expenditures for 2008;

(v)                 the variance between the projected total expenditures and the approved budget; and

(vi)               an explanation of the variance.

8.       Unless otherwise directed by the Board Hydro shall file, commencing with the 2009 Capital Budget Application, a five-year Capital Expenditure Plan in accordance with the findings of the Board in this Decision and Order.

9.       Hydro shall file, in conjunction with the 2009 Capital Budget Application, a report on the System Security Upgrade program in accordance with the findings of the Board in this Decision and Order.

10.   Hydro shall pay all costs and expenses of the Board incurred in connection with the Application.

Date Issued:

November 22, 2007

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 31 (2007)

Application:

Application for approval of the Board to proceed with the construction of a wind-hydrogen diesel generation project at Ramea, pursuant to Section 41(3) of the Act.

Decision:

1.       Hydro may proceed with the construction and installation of the Wind-Hydrogen-Diesel System as proposed, in the amount of $8,794,000, with spending of approximately $1,272,000 in 2007 and $7,522,000 in 2008.

2.       Unless otherwise ordered by the Board, ratepayers will not bear any of the costs relating to the Wind-Hydrogen-Diesel System.

3.       Hydro shall treat all costs related to the Wind-Hydrogen-Diesel System as non-regulated in accordance with the methodology, policies and procedures in place for the treatment of non-regulated activities.

4.       Unless otherwise directed by the Board, Hydro shall provide a quarterly update on the status of the Wind-Hydrogen-Diesel System in each quarterly report to the Board, setting out details as to implementation and operation of this system, capital and operating costs, variances from budget, reliability and safety issues.

5.       Hydro shall file a report to the Board within ninety days of the conclusion of the operational testing phase addressing in detail Hydro’s conclusions and plans in relation to the Wind-Hydrogen-Diesel System.

6.       Hydro shall pay all expenses of the Board arising from this application.

Date Issued:

November 30, 2007

 

 

Newfoundland Power                                                                                            P.U. 32 (2007)

Application:

General Rate Application by Newfoundland Power Inc. to establish customer electricity rates for 2008.

Decision:

                           RATE BASE AND RATE OF RETURN

1.       NP’s proposed forecast average rate base for the 2008 test year of $812,212,000, calculated in accordance with the Asset Rate Base Method, is approved.

2.       NP’s proposed rate of return on average rate base for the 2008 test year of 8.37% in a range of 8.19% to 8.55% is approved.

                           Rates, Rules and Regulations

3.       The rates proposed by NP are approved as set out in Schedule A of this Decision and Order, effective for consumption on and after January 1, 2008.

4.       The changes to the Rules and Regulations proposed by NP are approved and NP shall file with the Board, within 30 days of this Order, NP’s Rules and Regulations revised to reflect changes to:

i.                    the Rate Stabilization Clause to provide for the recovery through the Rate Stabilization Account of the Energy Supply Cost Variance incurred through to the end of 2010, as set out in Schedule B of this Decision and Order;

ii.                  Regulation 9(b) and 9(c) to permit charges for temporary connections, special facilities and relocations to be added to customer bills, as set out in Section C of this Decision and Order; and

iii.                Regulation 10(d) to increase the rejected payment fee, as set out in Schedule C of this Decision and Order.

                           AUTOMATIC ADJUSTMENT FORMULA

5.       NP’s proposed use of the Automatic Adjustment Formula, changed to reflect the adoption of the Asset Rate Base Method for calculating rate base, to establish the rate of return on rate base for three years following the test year is approved, unless otherwise directed by the Board.

6.       NP shall, unless otherwise directed by the Board, apply no later than November 30th in each year for the application of the Automatic Adjustment Formula to the rate of return on rate base and for a revised Schedule of Rates, Tolls and Charges effective January 1 in each year following.

7.   NP shall, unless otherwise directed by the Board, file its next general rate application with the Board by June 30, 2010 with a 2011 test year.

ACCOUNTING TREATMENT AND POLICIES

8.   NP’s proposed amortizations are approved with effect from January 1, 2008 as follows:

i.    Amortization over a three-year period of:

a)      $16,446,000 of 2005 unbilled revenue;

b)      $4,087,000 in revenue related to municipal tax timing reconciliation;

c)       $11,586,000 in deferred 2006 and 2007 depreciation costs;

d)      $1,147,000 in deferred 2007 replacement energy costs associated with the Rattling Brook Hydro Generating Plant refurbishment;

e)      the $1,342,000 balance in the Purchased Power Unit Cost Variation Reserve Account; and

f)       $1,250,000 in recovery of hearing costs.

ii.    Amortization over a five-year period of the $6,800,000 balance in the Degree Day Component of the Weather Normalization Reserve.

9.       NP’s proposal to adjust the depreciation expense to amortize the accumulated reserve variance of $700,000 over the four-year period 2008-2011 is approved.

10.   NP’s proposal to use the depreciation rates as recommended in the 2006 Depreciation Study is approved.

11.   NP’s proposal to adopt the accrual method of accounting for income tax related to pension costs is approved.

12.   NP’s proposal to continue using the cash basis for recognizing expenses for other employee future benefits is approved.

13.   NP’s proposal to discontinue the Purchased Power Unit Cost Variation Reserve Account and establish the Demand Management Incentive Account is approved, as set out in Schedule D of this Decision and Order.

14.   NP’s proposal to create a deferral account to true-up the income tax expense for the 2008 test year and subsequent years until its next general rate application to reflect the proposed 2008 corporate tax changes announced by the Federal Government on October 30, 2007 is approved, with the disposition of the account balance, if any, to be subject to a further order of the Board.

15.   NP shall file with the Board, no later than December 31, 2011 a new depreciation study related to plant in service as of December 31, 2010.

                           Reporting

16.   NP shall, unless otherwise directed by the Board, file with the Board, on or before March 31, 2008, a fair market value determination for insurance services recommending an appropriate charge-out rate.

17.   NP shall, unless otherwise directed by the Board, report to the Board within 90 days of the finalization of the CEA reliability performance indicators as to the incorporation of these standards into the existing regulatory framework for NP.

18.   NP shall, unless otherwise directed by the Board, as part of its next general rate application include detailed information concerning the method used to forecast its test year FTEs and labour expense, as well as an explanation of the assumptions used to determine the forecast vacancies.

19.   NP shall, unless otherwise directed by the Board, as part of its next general rate application include a report on the operation of the Demand Management Incentive Account.

20.   NP shall, unless otherwise directed by the Board, provide an update as part of its quarterly reporting to the Board on the status of the AcSB’s considerations of the transition to IFRS.

21.   NP shall, unless otherwise directed by the Board, provide an update as part of its quarterly reporting to the Board on the progress of NP’s retail customer rate review.

22.   NP shall, unless otherwise directed by the Board, file as a part of its annual return to the Board, information relating to changes in deferred charges, including pension costs.

23.   NP shall, unless otherwise directed by the Board, file:

i.        With its annual return, a modified schedule calculating the embedded cost of debt for the reporting year to identify specifically the causes of variations in the actual embedded cost of debt from the cost forecast for the test year; and

ii.      With its annual return, where in a year the actual rate of return on equity is greater than 50 basis points above the calculation of cost of equity for the same year, a report explaining the circumstances and facts contributing to the difference.

                           HEARING COSTS

24.  NP shall pay the expenses of the Board arising from this Application, including the expenses of the Consumer Advocate incurred by the Board.

Date Issued:

December 19, 2007

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 33 (2007)

Application:

Application for Rate Changes to Labrador Interconnected Customers (Interim Order).

Decision:

1.       The decrease of the monthly amount of the 2008 automatic rate adjustment in the Rural Rate Alteration for the Labrador Interconnected customers in the Rate Stabilization Plan from $92,560 to $32,433, is approved on an interim basis; and

2.       The Schedule of Rates for the Labrador Interconnected customers attached in Schedule A is approved on an interim basis, effective January 1, 2008; and

3.       Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

December 21, 2007

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 34 (2007)

Application:

Application for Rate Changes to Industrial Customers (Interim Order).

Decision:

1.       Pursuant to Section 75 of the Act, the Board approves, on an interim basis, the Industrial Customer rates as attached in Schedule A, to be effective for consumption on and after January 1, 2008, until a final Order of the Board with respect to Industrial Customers’ rates for 2008.

2.       Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

December 21, 2007

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 35 (2007)

Application:

An application by Newfoundland and Labrador Hydro ("Hydro") for approval of a change in the rates to be charged for the supply of power and energy to Island Interconnected customers (excluding Burgeo school and library) and Isolated Rural customers (excluding Government Departments), pursuant to Sections 70 and 71 of the Act.

Decision:

1.       The Board approves on an interim basis the rates as attached in Schedule A to be effective for consumption on and after January 1, 2008 until a final order of the Board with respect to the within matter.

2.       The continuation of the rebate to Hydro's domestic customers served from the Labrador Isolated and L'Anse au Loup (Labrador Straits) system is approved on an interim basis.

3.       Hydro shall pay all expenses of the Board arising from this Application.

Date Issued:

December 24, 2007


Newfoundland and Labrador Hydro                                                                     P.U. 1 (2006)

Application:

For approval, pursuant to Sections 70, 71 and 75 of the Act, of certain rules, regulations and rates pertaining to the supply of electrical power and energy to one of its industrial customers, Aur Resources Inc.

Decision:

1.       Unless and until varied by further order of the Board, the Board approves, pursuant to section 75 of the Act:

(a)    Interim Firm Rates for Aur Resources Inc., attached hereto as Schedule “A”, to be effective for consumption on or after Jan. 20, 2006;

(b)    Interim Non-Firm Rates for Aur Resources Inc., attached hereto as Schedule “B”, to be effective for consumption on or after Jan. 20, 2006.

2.   Hydro shall pay the expenses of the Board incurred in connection with this matter.

Date Issued:

January 20, 2006

 

 

Newfoundland and Labrador Hydro                                                                     P.U. 2 (2006)

Application:

For approval, pursuant to Section 70 of the Act, of the Rate Stabilization Plan components of the rates to be charged to Island Interconnected Industrial Customers.

Decision:

1.       The Board hereby approves the Firm Rates for Hydro’s Island Interconnected Industrial Customers attached hereto as Schedule “A” to be effective for consumption on or after January 1, 2006.

2.       Unless and until by further Order of the Board, the Board approves, pursuant to Section 75 of the Act Interim Firm Rates for Aur Resources Inc., attached hereto as Schedule “B”, to be effective for consumption on or after January 27, 2006.

3.       Hydro shall pay the expenses of the Board incurred in connection with this matter.

Date Issued:

January 27, 2006

 

 

Newfoundland Power                                                                                              P.U. 3 (2006)

Application:

Pursuant to Sections 70, 78 and 80 of the Act,

(a)    approving its forecast rate base for 2006 in the amount of $743,976,000;

(b)    approving the operation of the automatic adjustment formula (the “Formula”) to determine a rate of return on rate base for 2006; and

(c)    providing final approval of a schedule of rates, tolls and charges on all electrical usage on and after January 1, 2006.

Decision:

The Board approves:

                                                        i.      pursuant to Section 78 of the Act, the forecast rate base for 2006 of $743,976,000;

                                                      ii.      pursuant to Section 80 of the Act, a rate of return on rate base for 2006 of 8.68% in a range of rate of return on rate base of 8.50% to 8.86%; and

                                                    iii.       pursuant to Sections 70 and 80 of the Act, the continued use of the Customer Rates approved in Order No P. U. 16(2005) as Newfoundland Power’s schedule of rates, tolls and charges for all electrical usage on and after January 1, 2006.

Date Issued:

January 27, 2006

 

 

Newfoundland Power                                                                                              P.U. 4 (2006)

Application:

For approval, pursuant to Section 91(5) of the Act, to amend an existing committed revolving term credit facility to extend the maturity date.

Decision:

1.       Pursuant to Section 91(5) of the Act, the Board approves the extension of the maturity date associated with the Committed Facility as contemplated by the Amended Facility.

2.       Newfoundland Power shall pay all costs and expenses of the Board incurred in connection with this Application.

Date Issued:

January 27, 2006

 

 

Newfoundland Power                                                                                              P.U. 5 (2006)

Application:

For approval, pursuant to Section 41(5) of the Act, of a contribution in aid of construction (CIAC) for a line extension to serve cottage area customers in a Cottage Area at Belbin’s Pond off the Salmonier Line.

Decision:

Pursuant to Section 41(5) of the Act, the Board approves the Non-Refundable Contribution in Aid of Construction in the amount of Four thousand seventy-six dollars and eighty-two cents ($4,076.82), including HST, as calculated under the Policy, to provide single-phase service to Domestic Customers located in a Cottage Area at Belbin’s Pond off the Salmonier Line, Newfoundland and Labrador.

Date Issued:

January 27, 2006

 

 

Newfoundland Power                                                                                              P.U. 6 (2006)

Application:

For approval, pursuant to Section 41(3) of the Act, to proceed with the construction and purchase of certain improvements to its property and supplemental to its 2006 capital budget approved by Orders No. P. U. 30(2005) and P. U. 34 (2005).

Decision:

1.       Pursuant to Section 41(3) of the Act, the Board approves the second supplemental 2006 capital expenditure of:

(i)   Lease of a replacement Colour Photocopier as proposed in the Application at an annual cost of $27,960.

2.   NP shall pay the expenses of the Board arising from this Application.

Date Issued:

January 27, 2006

 

 

Newfoundland Power                                                                                              P.U. 7 (2006)

Application:

For approval of (i) Revised Distribution Line Cost per Metre for CIACs; (ii) Revised Distribution Plant Upgrade Cost for CIACs; and (iii) Revised Contribution in Aid of Construction (CIAC) Cost Factors.

Decision:

1.       (a)  Schedule “A”, Appendix A, Page 1 of 1, of the Contribution in Aid of Construction Policy: Distribution Line Extensions for Domestic CIACs, approved by Order No. P.U. 27(2005) be and it is hereby rescinded and replaced by Schedule “A”, Appendix A, Page 1 of 1, Revised February 1, 2006, appended to this Order.

(b)  Schedule “B”, Appendix A, Page 1 of 1 Effective July 1, 2005,

      Schedule “C”, Appendix B, Page 1 of 1 Effective July 1, 2005, and

      Schedule “D”, Appendix C, Page 1 of 1 Effective July 1, 2005

of the Contribution in Aid of Construction Policy: Distribution Line Extensions and Upgrades to General Service Customers, approved by Order No P.U. 27 (2005) be and they are hereby rescinded and replaced by the following Appendices, and appended to this Order:

Schedule “B”, Appendix A, Page 1 of 1 Revised February 1, 2006,

Schedule “C”, Appendix B, Page 1 of 1 Revised February 1, 2006, and

Schedule “D”, Appendix C, Page 1 of 1 Revised February 1, 2006.

2.   The revised cost factors submitted with the application dated January 13, 2006, and approved above, are to be used in the calculation of all CIAC’s with effect from February 1, 2006, and, where advantageous to customers of the Newfoundland Power, on all CIAC’s quoted but unpaid as of February 1, 2006.

3.   Newfoundland Power submit a revised CIAC Policy in its entirety incorporating the revisions approved herein.

Date Issued:

February 14, 2006

 

 

Newfoundland Power                                                                                              P.U. 8 (2006)

Application:

For approval, pursuant to Section 41(5) of the Act, of a Contribution in Aid of Construction to provide single-phase service to Domestic Customers located in a Cottage Area at Placentia Junction off the Argentia Access Road.

Decision:

Pursuant to Section 41(5) of the Act, of the Non-Refundable Contribution in Aid of Construction in the amount of Three thousand three hundred eight dollars and ninety-six cents ($3,308.96), including HST, as calculated under the Policy, to provide single-phase service to Domestic Customers located in a Cottage Area at Placentia Junction off the Argentia Access Road.

Date Issued:

March 9, 2006

 

 

Newfoundland and Labrador Hydro                                                                     P.U. 9 (2006)

Application:

For approval, pursuant to Section 38 of the Act, for consent to decommission its diesel generating station and to abandon its service of the electrical distribution system situate at Davis Inlet.

Decision:

1.       Pursuant to Section 38 of the Act, the Board consents to and approves the abandonment and decommissioning by Hydro of its diesel generating station and electrical distribution system in the Community of Davis Inlet.

2.       Hydro shall pay all costs and expenses of the Board incurred in connection with this Application.

Date Issued:

March 13, 2006

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 10 (2006)

Application:

For approval, pursuant to Section 41(3) of the Act, of a proposed capital project for 2006 – Charlottetown – Replacement of Diesel Generator.

Decision:

1.       Pursuant to Section 41(3) of the Act, the Board approves the supplemental 2006 capital expenditure as follows:

                                                                    i)      an amount of $183,800 for the replacement of a diesel engine for a generating unit at Hydro’s Charlottetown diesel generating station.

2.       Hydro shall pay the expenses of the Board incurred in connection with this matter.

Date Issued:

March 13, 2006

 

 

Newfoundland and Labrador Hydro          *P.U. 11 (2006) RESCINDED* see P.U. 29 (2006)

Application:

For approval, pursuant to Section 41(5) of the Act, of a contribution in aid of construction in the amount of $432,736.00, including HST, for the supply of single-phase electrical service to one general service customer, Aliant Telecom Incorporated’s Rocky Ridge Communications Tower, located off the Burgeo Highway, Route 480.

Decision:

Pursuant to section 41(5) of the Act, the Board approves the contribution in aid of construction in the amount of four hundred and thirty-two thousand, seven hundred and thirty-six dollars  ($432,736.00), including HST, for the supply of single-phase electrical service to one (1) general service customer, Aliant Telecom Incorporated’s Rocky Ridge Communications Tower, located off the Burgeo Highway, Route 480, as calculated under the Policy.

Date Issued:

April 7, 2006

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 12 (2006)

Application:

For approval, by Newfoundland and Labrador Hydro (“the Applicant”), pursuant to Section 41 (3) of the Act, requesting approving of a 2006 Capital Budget Proposal for the acquisition of a parcel of land upon which Hydro owns four high voltage transmission lines near the Hardwoods Terminal Station located in Paradise.

Decision:

Pursuant to Section 41 (3) of the Act, the Board approves the additional 2006 expenditure of $174,000 for the acquisition of approximately 12.7 acres of land adjacent to the Hardwoods Terminal Station located in Paradise.

Date Issued:

April 27, 2006

 

 

Newfoundland Power                                                                                            P.U. 13 (2006)

Application:

For approval, pursuant to Section 41(2) of the Act, to proceed with the construction and purchase of certain improvements to its property, amending its 2006 capital budget approved by Order No. P.U. 30(2005) and supplemental Order P. U. 34(2005).

Decision:

1.       Pursuant to Section 41(3) of the Act, the Board approves the supplemental 2006 capital expenditures of $705,300 to renovate the Grand Falls-Windsor Service Building.

2.       The Applicant shall pay the expenses of the Board arising from this Application.

Date Issued:

May 10, 2006

 

 

Newfoundland Power                                                                                            P.U. 14 (2006)

Application:

For approval, pursuant to Sections 69(3) and 78 of the Act, for approval of the balance of the weather normalization reserve as of December 31, 2005.

Decision:

NP’s weather normalization reserve of a Negative Balance of $10,100,170 as at December 31, 2005 is hereby approved.

Date Issued:

May 10, 2006

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 15 (2006)

Application:

For approval, pursuant to Section 91 of the Act, to issue debentures in aggregate not to exceed $275,000,000 during the year ending December 31, 2006.

Decision:

1.       Approval be and it is hereby given to the Applicant to issue Debenture(s) with an aggregate value not to exceed $275,000,000 Canadian in the principal amount subject to the following conditions:                                                

(a)          The Debenture issue(s) shall be issued on or before December 31, 2006.

(b)           The Applicant shall provide to the Board an Affidavit specifying the terms and conditions of the Debenture issue(s) within twenty-four (24) hours (non-business days excepted) after such terms and conditions have been successfully negotiated.  In particular, the Affidavit shall set forth the following:

                                                                                                              i)      date of the issue,

                                                                                                            ii)      term,

                                                                                                          iii)      maturity date,

                                                                                                          iv)      principal amount,

                                                                                                            v)      interest rate,

                                                                                                          vi)      particulars of sinking fund, if any,

                                                                                                        vii)      price to the public and to the underwriters,

                                                                                                      viii)      yield to the public,

                                                                                                          ix)      the underwriting fee,

                                                                                                            x)      actual cost (i.e. yield) to Applicant, and

                                                                                                          xi)      any other material terms or conditions not contemplated at the date of the application but forming part of the negotiated terms and conditions.

(c)          The Applicant shall provide to the Board a copy of the Underwriting Agreement relating to the Debenture issue(s) within twenty-four (24) hours after its terms and conditions have been accepted by both the Applicant and the Underwriters.  The Underwriting Agreement shall not significantly vary and shall be modeled upon the draft Underwriting Agreement filed with the Board in support of the application.

(d)             The Applicant shall provide to the Board a copy of the Order in Council, which provided approval to the Applicant to issue such Debenture issue(s).

(e)             The proceeds from the Debenture issue(s) shall be used in the manner set out in paragraph 4 of the application and the Applicant shall report by Affidavit to the Board on the disposition of the proceeds no later than January 15, 2007.

2.       The Applicant shall pay all expenses of the Board arising from this Application.

Date Issued:

May 10, 2006

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 16 (2006)

Application:

For approval, pursuant to section 71 of the Act, of the cost of Low Sulphur Fuel as a fuel cost component to be recovered through the Rate Stabilization Plan charged to Newfoundland Power Inc. and the Island Industrial Customers.

Decision:

1.       Hydro’s request for an order approving, as a prudent fuel purchase expenditure to be recovered through the RSP, Hydro’s costs of purchasing 1% sulphur fuel is hereby denied.

2.       Hydro shall pay the expenses of the Board arising from this Application.

Date Issued:

June 2, 2006

 

 

Newfoundland Power                                                                                            P.U. 17 (2006)

Application:

For approval to proceed with the construction and purchase of certain improvements to its property pursuant to Section 41(3) of the Act amending its 2006 capital budget approved by Order No. P.U. 30(2005) and supplemental Orders No. P.U. 34(2005) and P.U. 13(2006)

Decision:

1.       Pursuant to Section 41(3) of the Act, the Board approves the supplemental 2006 capital expenditures of $1,294,000 to construct a proposed line extension to serve the Howley Cottage Area.

2.       The Applicant shall pay the expenses of the Board arising from this Application.

Date Issued:

June 12, 2006

 

 

Newfoundland Power                                  *P.U. 18 (2006) RESCINDED* see P.U. 24 (2006)

Application:

For approval of a contribution in aid of construction (CIAC) for a line extension to serve domestic customers residing in a cottage area pursuant to Section 41(5) of the Act.

Decision:

Pursuant to Section 41(5) of the Act, the Board approves the Non-Refundable Construction in Aid of Construction in the amount of Three thousand four hundred and five dollars and seventy-seven cents ($3,405.77), including HST, as calculated under the Policy to provide single-phase service to Domestic Customers located in the Howley Cottage Area.

Date Issued:

June 12, 2006

 

 

Newfoundland Power                                                                                            P.U. 19 (2006)

Application:

For approval of a contribution in aid of construction (CIAC).

Decision:

Pursuant to Section 41(5) of the Act, the Board approves the Contribution in Aid of Construction.

Date Issued:

June 12, 2006

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 20 (2006)

Application:

For approval of the Rate Stabilization Plan component of the rates to be charged to Newfoundland Power Inc, pursuant to Section 70(1) of the Act.

Decision:

1.       The Board hereby approves the Rates to be charged by Hydro to Newfoundland Power as attached hereto as Schedule A to be effective for consumption on or after July 1, 2006.

2.       The Board hereby approves the modification to the fuel rider component of the RSP to reflect a reduction in the amount of No. 6 Fuel forecast to be consumed at the Holyrood Generating Station.

3.       Hydro shall pay the expenses of the Board incurred in connection with this matter.

Date Issued:

June 21, 2006

 

 

Newfoundland Power                                                                                            P.U. 21 (2006)

Application:

For approval of (1) Rate Stabilization and Municipal Tax Adjustments to be applied to the rates of NP for the period July 1, 2006 to June 30, 2007; and (2) a Revised Schedule of Rates, Tolls and Charges reflecting the amended Rate Stabilization and Municipal Tax Factors, effective July 1, 2006 to June 30, 2007, pursuant to Section 70 (1) of the Act.

Decision:

1.       The Board hereby approves the following:

                                                                          i)      the Rate Stabilization Adjustment of 1.595 cents/kWh as set out in Schedule A and the Municipal Tax Adjustment factor of 1.02393 as set out in Schedule B to be applied to all bills based on consumption on and after July 1, 2006 to June 30,2007; and

                                                                        ii)      the rates proposed by NP to be effective on all electrical consumption on and after July 1, 2006 to June 30, 2007, set out in Schedule C.

2.   NP shall pay the expenses of the Board in connection with this Application.

Date Issued:

June 21, 2006

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 22 (2006)

Application:

For approval of a change in the rate structure charged for the supply of power and energy to Island Interconnected Customers (excluding Burgeo school and library) (Rate Class 1.1, 2.1, 2.2, 2.3, 2.4 and 4.1), Isolated Rural Domestic Customers (excluding Government departments) (Rate Class 1.2D), and Isolated Rural Street and Area Lighting (excluding Government departments) (Rate Class 4.1D), pursuant to Section 70 of the Act.

Decision:

1.       The Board hereby approves the Schedule of Rates for Hydro’s Island Interconnected customers (excluding Burgeo school and library), attached hereto as Schedule A, and the Schedule of Rates for Hydro’s Isolated Rural Domestic customers (excluding Government departments) and for Isolated Rural Street and Area Lighting (excluding Government departments), attached hereto as Schedule B, to be effective for consumption on and after July 1, 2006.

2.       Hydro shall pay the expenses of the Board incurred in connection with this application.

Date Issued:

June 21, 2006

 

 

Newfoundland Power                                                                                            P.U. 23 (2006)

Application:

For approval of a contribution in aid of construction (CIAC) for Cottage Area Customers located at Northwest Brook near Winterland, pursuant to Section 41(5) of the Act.

Decision:

Pursuant to section 41(5) of the Act, the Board approves the Non-Refundable Contribution in Aid of Construction in the amount of Six thousand two hundred fifty-five dollars and fifty-three cents ($6,255.53), including HST, per Customer as calculated under the Policy to provide single-phase service to Domestic Customers located in a Cottage Area at Northwest Brook near Winterland.

Date Issued:

June 29, 2006

 

 

Newfoundland Power                                                                                            P.U. 24 (2006)

Application:

For approval of a contribution in aid of construction (CIAC) for a line extension to serve domestic customers residing in a cottage area pursuant to Section 41(5) of the Act.

Decision:

1.       Order No. P. U. 18(2006) is rescinded.

2.       Pursuant to Section 41(5) of the Act, the Board approves a deviation from the CIAC Policy a Non-Refundable Construction in Aid of Construction in the amount of three thousand four hundred and five dollars and seventy-seven cents ($3,405.77), including HST, as calculated under the CIAC Policy to provide single-phase service to Domestic Customers located in the Howley Cottage Area.

Date Issued:

July 6, 2006

 

 

Newfoundland Power                                                                                            P.U. 25 (2006)

Application:

For approval of a contribution in aid of construction (CIAC) for a line extension to serve cottage area customers located on Valley Road near Carbonear.

Decision:

Pursuant to section 41(5) of the Act, the Board approves the Non-Refundable Contribution in Aid of Construction in the amount of Two thousand seven hundred eighty-nine dollars and ninety cents ($2,789.90), including HST, per Customer as calculated under the Policy to provide single-phase service to Domestic Customers located in a Cottage Area on Valley Road near Carbonear.

Date Issued:

August 15, 2006

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 26 (2006)

Application:

For approval of the lease of office space to support its 2006 regulatory activities, pursuant to Section 41 of the Act.

Decision:

1.       Pursuant to Section 41(3) of the Act, the Board approves the Applicant’s proposed six-month lease of office space in the Prince Charles Building, commencing September 1, 2006, for a rental amount of $2,500 per month, plus HST.

2.       The Applicant shall pay the expenses of the Board arising from this Application.

Date Issued:

August 17, 2006

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 27 (2006)

Application:

For approval to Abandon and Decommission the Temporary Diesel Generating Station at Rencontre East, pursuant to Section 38 of the Act.

Decision:

1.       Pursuant to Section 38 of the Act, the Board consents to and approves the abandonment and decommissioning by the Applicant of its Rencontre East diesel generating station.

2.       The Applicant shall pay the expenses of the Board arising from this Application.

Date Issued:

September 6, 2006

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 28 (2006)

Application:

For approval of, inter alia, rate to be charged its customers effective January 1, 2007.

Decision:

1.       The Registered Intervenors in this proceeding are as set out in the Distribution List attached as Appendix “A” to this Order.

2.       The intended Order of Witnesses is as set out in Appendix “B” to this Order, which may be changed with appropriate notice to the Board and other parties to the hearing.

3.       The Schedule of Dates as set out in Appendix “C” to this Order shall be observed by the parties, unless otherwise accepted by the Board.

4.       The Rules of Procedure as set out in Appendix “D” to this Order shall be observed by the parties, unless otherwise directed by the Board.

5.       The request set out in paragraph 6 (6) (o) of the Application for approval, in principle, of the straight line and equal life group depreciation methodology will be addressed after the conclusion of the Application in a process to be established by the Board beginning in 2007.

Date Issued:

September 12, 2006

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 29 (2006)

Application:

For approval of the revised Contribution in Aid of Construction for Aliant’s Rocky Ridge Communications Tower, Route 480

Decision:

1.       Order No. P.U. 11 (2006) dated April 7, 2006, approving a contribution in aid of construction in the amount of $432,736.00, including HST, be and it is hereby rescinded.

2.       Pursuant to section 41(5) of the Act, the Board approves the revised contribution in aid of construction in the amount of $537,927.00, including HST, for the supply of single-phase electrical service to one general service customer, Aliant Telecom Incorporated’s Rocky Ridge Communications Tower, located off the Burgeo Highway, Route 480, as calculated under the Policy.

Date Issued:

September 27, 2006

 

 

Newfoundland Power                                                                                            P.U. 30 (2006)

Application:

For approval of its 2007 Capital Budget of $62,166,000 and fixing and determining its average rate base for 2005 in the amount of $745,446,000.

Decision:

1.       Pursuant to Section 41 of the Act, NP’s capital purchases and construction projects in excess of $50,000, as set out in Schedule A to this Order, are approved.

2.    Pursuant to Section 41 of the Act, the 2007 Capital Budget for improvement and additions to NP’s property in an amount of $ 62,166,000 is approved.

3.       Pursuant to Section 78 of the Act, the rate base for the year ending December 31, 2005 is hereby fixed and determined at $ 745,446,000.

4.    Unless otherwise directed by the Board, NP shall file an annual report to the Board on its 2007 capital expenditures by March 1, 2008.

5.    Unless otherwise directed by the Board, NP shall provide in conjunction with the 2008 Capital Budget Application, a status report on the 2007 capital budget expenditures showing for each project:

(i)     the approved budget for 2007;

(ii)   the expenditures prior to 2007;

(iii) the 2007 expenditures to the date of the application;

(iv)  the remaining projected expenditures for 2007;

(v)    the variance between the projected total expenditures and the approved budget; and

(vi)  an explanation of the variance.

6.    NP shall pay all costs and expenses of the Board incurred in connection with the Application.

Date Issued:

September 29, 2006

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 31 (2006)

Application:

For approval of Rate Stabilization Plan components of the rates to be charged to Industrial Customers.

Decision:

1.       The Board hereby approves the Firm Energy Rates for Hydro’s Island Interconnected Industrial Customers attached hereto as Schedule “A” to be effective for consumption on or after October 1, 2006.

2.       Hydro shall pay the expenses of the Board incurred in connection with this matter.

Date Issued:

October 5, 2006

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 32 (2006)

Application:

For approval of the cost to be recovered through the Rate Stabilization Plan charged to Newfoundland Power Inc. and the Island Industrial Customers of consuming No. 6 Fuel not exceeding 1% Sulphur by weight.

Decision:

1.       The Board hereby approves as an operating expense to be recovered through the Rate Stabilization Plan, Hydro’s costs of burning 1% sulphur content No. 6 fuel at its Holyrood Thermal Generating Station after October 20, 2006.

2.       The costs of the fuel shall be calculated in accordance with the usual operation of the Rate Stabilization Plan from October 20, 2006 or  date thereafter determined by Hydro.

3.       Hydro shall pay all costs and expenses of the Board incurred in connection with this Application.

Date Issued:

October 20, 2006

 

 

Newfoundland Power                                                                                            P.U. 33 (2006)

Application:

For approval of a contribution in aid of construction (CIAC) for a line extension to serve cottage area customers located in a Cottage Area known as The Pond That Feeds The Brook located near North River, Conception Bay.

Decision:

Pursuant to Section 41(5) of the Act, the Board approves the Non-Refundable Contribution in Aid of Construction in the amount of Five thousand eight hundred fifteen dollars and sixty-three cents ($5,815.63), including HST, per Customer as calculated under the Policy, to provide single-phase service to Domestic Customers located in The Pond That Feeds The Brook Cottage Area, near North River, Conception Bay.

Date Issued:

October 20, 2006

 

 

Newfoundland Power                                                                                            P.U. 34 (2006)

Application:

For approval of capital expenditures supplemental to NP’s 2007 Capital Expenditure Budget.

Decision:

1.       Pursuant to Section 41(3) of the Act, the Board approves:

(a)          the supplemental 2007 capital expenditures of $685,000 to renovate the Maple Valley Road Building as set forth in Schedule “B” to the Application; and

(b)          the revised 2007 capital budget as set forth in Schedule “C” to the Application.

2.       The Applicant shall pay the expenses of the Board arising from this Application.

Date Issued:

October 20, 2006

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 35 (2006)

Application:

For approval of: (i) its 2007 Capital Budget of $41,421,000, (ii) 2007 capital purchases and construction projects in excess of $50,000, (iii) proposed estimated contributions in aid of construction for 2007; and (iv) fixing and determining its average rate base for 2005 in the amount of $1,473,759,000.

Decision:

1.       Pursuant to Section 41 of the Act, Hydro’s capital purchases and construction projects in excess of $50,000, as set out in Schedule A to this Order, are approved.

2.       Pursuant to Section 41 of the Act, the following projects as proposed by Hydro are not approved:

(i) Holyrood Condition Assessment (p. B-14) $3,334,900; and

(ii)     Construct Transmission Line Equipment Off-Loading Ramps (p. B-32) $402,000.

3.       Pursuant to Section 41 of the Act, the 2007 Capital Budget for improvement and additions to Hydro’s property in an amount of $37,684,100 is approved.

4.       Pursuant to Section 78 of the Act, the rate base for the year ending December 31, 2005 is hereby fixed and determined at $ 1,473,759,000.

5.       Unless otherwise directed by the Board, Hydro shall file an annual report to the Board on its 2007 capital expenditures by March 1, 2008.

6.       Unless otherwise directed by the Board, Hydro shall provide in conjunction with the 2008 Capital Budget Application, a status report on the 2007 capital budget expenditures showing for each project:

(i) the approved budget for 2007;

(ii)           the expenditures prior to 2007;

(iii)          the 2007 expenditures to the date of the application;

(iv)         the remaining projected expenditures for 2007;

(v)           the variance between the projected total expenditures and the approved budget; and

(vi)         an explanation of the variance.

7.       Hydro shall pay all costs and expenses of the Board incurred in connection with the Application.

Date Issued:

November 3, 2006

 

 

Newfoundland Power                                                                                            P.U. 36 (2006)

Application:

For approval of a contribution in aid of construction (CIAC) for a line extension to serve cottage area customers located at George’s Lake, near Corner Brook.

Decision:

Pursuant to Section 41(5) of the Act, the Board approves the Non-Refundable Contribution in Aid of Construction in the amount of Four thousand five hundred eleven dollars and thirteen cents ($4,511.13), including HST, per Customer as calculated under the Policy, to provide single-phase service to Domestic Customers located in Boy Scout Road Cottage Area, located at George’s Lake, near Corner Brook.

Date Issued:

November 14, 2006

 

 

Newfoundland Power                                                                                            P.U. 37 (2006)

Application:

For approval of a contribution in aid of construction (CIAC) for a line extension to serve cottage area customers located at Nine Mile Road near St. Catherine’s.

Decision:

Pursuant to Section 41(5) of the Act, the Board approves a deviation from the Contribution in Aid of Construction Policy in the calculation of a Non-Refundable Contribution in Aid of Construction in the amount of Three thousand nine hundred sixty-two dollars and thirty-four cents ($3,962.34), including HST, per Customer as calculated under the Policy, to provide single-phase service to Domestic Customers located in a Cottage Area, at Nine Mile Road near St. Catherine’s.

Date Issued:

November 14, 2006

 

 

Newfoundland Power                                                                                            P.U. 38 (2006)

Application:

For approval of:

(i)       a revised rate of return on rate base for 2007 and a revised definition of the Excess Earnings Account; and

(ii)     permitting deferral of an application for a revised schedule of rates, tolls and charges effective January 1, 2007 to a date no later than December 15, 2006;

as required by the automatic adjustment formula (the “Formula”) approved pursuant to Order No. P.U. 19(2003).

Decision:

The Applicant’s request for a deferral of the application for a revised schedule of rates, tolls and charges effective January 1, 2007 to a date no later than December 15, 2006 is approved.

Date Issued:

November 30, 2006

 

 

Newfoundland Power                                                                                            P.U. 39 (2006)

Application:

For approval of:

(a)    a certain amortization and the deferred recovery of certain costs for 2007;and

(b)    forecast values for rate base and invested capital for use in the automatic adjustment formula for the calculation of the rate of return on rate base for 2007 pursuant to Order No. P.U. 19(2003).

Decision:

1.       NP’s proposal to amortize $2,714,000 of the 2005 Unbilled Revenue as revenue for regulatory purposes in 2007 is approved.

2.       NP’s proposal to defer recovery, until a further Order of the Board, of the amount of $5,793,000 in 2007 related to the conclusion of the Depreciation True-Up in 2005 is approved.

3.       NP’s proposal to defer recovery, until a further Order of the Board, of the amount of $1,147,000 related to replacement energy costs associated with the Rattling Brook project is approved.

4.       Pursuant to s. 80 of the Act, the forecast 2007 values for rate base of $785,271,000 and invested capital of $787,990,000 for use in the Automatic Adjustment Formula to calculate NP’s rate of return on rate base for 2007 is approved.

5.       NP shall pay the expenses of the Board arising from this Application, including the expenses of the Consumer Advocate.

Date Issued:

December 5, 2006

 

 

Newfoundland Power                                                                                            P.U. 40 (2006)

Application:

For approval of:

                                                        i.      a revised rate of return on rate base for 2007 and a revised definition of the Excess Earnings Account; and

                                                      ii.      permitting deferral of an application for a revised schedule of rates, tolls and charges effective January 1, 2007 to a date no later than December 15, 2006;

as required by the automatic adjustment formula (the “Formula”) approved pursuant to Order No. P.U. 19(2003).

Decision:

The Board approves:

                                                        i.      pursuant to Section 80 of the Act, a rate of return on rate base for 2007 of 8.47% in a range of 8.29% to 8.65%; and pursuant to Section 58 of the Act, a revised definition of the Excess Earnings Account as set out in Schedule 1.

Date Issued:

December 8, 2006

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 41 (2006)

Application:

For approvals of, under Section 70 of the Act, changes in the rates to be charged for the supply of power and energy to Newfoundland Power Inc., Rural Customers and Industrial Customers; and under Section 71 of the Act, changes in the Rules and Regulations applicable to the supply of electricity of Rural Customers; and

Revised application, pursuant to Section 70 and 75 of the Act, by Hydro for approval of, inter alia, rates to be charged its customers (the “Application”).

Decision:

Pursuant to section 75 of the Act the Board approves, on an interim basis, the schedule of rates, tolls and charges attached as Schedule “A” to this Order to be effective on all energy consumed on and after January 1, 2007.

Date Issued:

December 14, 2006

 

 

Newfoundland Power                                                                                            P.U. 42 (2006)

Application:

For approval of pursuant to Sections 70, 75, 78 and 80 of the Act and  Order No. P.U. 19(2003) to revise its schedule of rates, rules and regulations (“Customer Rates”) to:

                                                                    i.      reflect the revised rate of return on rate base for 2007 resulting from the operation of the Automatic Adjustment Formula (the “Formula”);

                                                                  ii.      permit recovery of additional costs payable to Newfoundland and Labrador Hydro (“Hydro”) for the supply of power as a result of a revised wholesale rate effective January 1, 2007;

                                                                iii.      approve a revised rate stabilization adjustment to apply to the rates of Newfoundland Power for the period January 1, 2007 to June 30, 2007; and approve a revision to Newfoundland Power’s Rate Stabilization Clause.

Decision:

1.       Pursuant to section 75 of the Act the Board approves, on an interim basis, the schedule of rates, tolls and charges attached as Schedule “A” to this Order to be effective on all energy consumed on and after January 1, 2007.

2.       The proposed RSA factor of 0.444¢ per kWh to be applied to Customer Rates for the period January 1, 2007 to June 30, 2007 is approved.

3.       The Rate Stabilization Clause set out in Schedule “B” with effect from January 1, 2007 is approved.

Date Issued:

December 14, 2006

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 43 (2006)

Application:

For approval of, under Section 70 of the Act, changes in the rates to be charged for the supply of power and energy to Newfoundland Power Inc., (Newfoundland Power”), Rural Customers and Industrial Customers; and under Section 71 of the Act, changes in the Rules and Regulations applicable to the supply of electricity to Rural Customers; and approval of Rate Changes to Hydro’s Rural Island Interconnected Customers and Isolated Non-Government Rural Customers.

Decision:

Pursuant to Section 70 & 71 of the Act the Board hereby approves, on an interim basis, the schedule of rates attached as Schedule “A” to this Order, to be effective for consumption on and after January 1, 2007.

Date Issued:

December 19, 2006

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 44 (2006)

Application:

For approval of deferral of expenses associated with the repair of the Unit 2 Boiler at the Holyrood Thermal Generating Station as a Major Extraordinary Repair, pursuant to Sections 69, 78 and 80 of the Act.

Decision:

1.       The Board hereby approves:

(i)      treatment of the costs associated with the Unit 2 boiler tube repairs at the Holyrood Thermal Generating Station as a Major  Extraordinary Repair;

(ii)    the amortization of the actual expenses for the repairs together with interest, estimated to be $2,666,000, over a five-year period beginning in 2006; and

(iii)   the inclusion in the rate base of the unamortized balance of the deferred costs of the repairs.

2.       Hydro shall pay the expenses of the Board arising from this Application.

Date Issued:

December 21, 2006

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 45 (2006)

Application:

For approval of, under Section 70 of the Act, changes in the rates to be charged for the supply of power and energy to Newfoundland Power Inc., (Newfoundland Power”), Rural Customers and Industrial Customers; and under Section 71 of the Act, changes in the Rules and Regulations applicable to the supply of electricity to Rural Customers; and approval of Rate Changes to Hydro’s Rural Island Interconnected Customers and Isolated Non-Government Rural Customers – interim rates for Hydro’s Labrador Interconnected Customers.

Decision:

Pursuant to Section 70 & 71 of the Act the Board hereby approves, on an interim basis, the schedule of rates attached as Schedule “A” to this Order, to be effective for consumption on and after January 1, 2007.

Date Issued:

December 22, 2006

 

 

Newfoundland and Labrador Hydro                                                                   P.U. 46 (2006)

Application:

For approval of, under Section 70 of the Act, changes in the rates to be charged for the supply of power and energy to Newfoundland Power Inc., (Newfoundland Power”), Rural Customers and Industrial Customers; and under Section 71 of the Act, changes in the Rules and Regulations applicable to the supply of electricity to Rural Customers; and approval of Rate Changes to Hydro’s Rural Island Interconnected Customers and Isolated Non-Government Rural Customers – amendments to the Rate Stabilization Plan.

Decision:

1.       Pursuant to Section 75 of the Act, the Board approves, on an interim basis, the monthly amount of the 2007 automatic rate adjustment for the Rural Labrador Interconnected system be increased from ($117,901) to $92,560 which amount arises from the phase-in of the credit from secondary energy sales to CFB Goose Bay to the rural deficit, leaving the CFB Revenue Credit applied to the rural deficit in Hydro's Final 2007 Test Year Cost of Service and future years, as formerly set out in the table of clause 1.3(b) of the Rate Stabilization Plan, to be determined later by final order of the Board; and

2.       Pursuant to Sections 69 and 75 of the Act, the Board approves, on an interim basis, that Hydro shall set up a reserve account to maintain the December 31, 2006 Rate Stabilization Plan Hydraulic Variation balance, net of the normal 25% December 31, 2006 allocation, with normal Rate Stabilization Plan financing charges applied, until the balance in the account is disposed of later by final Order of the Board.

Date Issued:

December 29, 2006


Newfoundland Power                                                                                              P.U. 1 (2005)

Application:

For approval to borrow under the terms of a committed revolving term credit facility filed pursuant to Section 91 of the Act.

Decision:

1.       Pursuant to Section 91 of the Act, the Board approves Newfoundland Power’s issue of the Committed Facility to the amount of $100,000,000 for the purposes of financing (i) working capital requirements of Newfoundland Power necessary to meet its service obligations under the Act and (ii) capital expenditure requirements of Newfoundland Power as approved from time to time by the Board pursuant to the Act.

2.       NP shall pay all costs and expenses of the Board incurred in connection with this Application.

Date Issued:

January 12, 2005

 

 

Newfoundland and Labrador Hydro                                                                        P.U. 2 (2005)

Application:

For approval to treat the Asbestos Abatement Plan at the Holyrood Thermal Generating Plant as a Major Extraordinary Repair.

Decision:

1.       Hydro treat the costs associated with the Asbestos Abatement Plan at the Holyrood Thermal Generating Station, at an estimated cost of $8.7 million($10.4 million including financing), to be carried out for a three-year period commencing in 2005, as a Major Extraordinary Repair and that it accumulate and amortize each year’s actual expenses for the Asbestos Abatement Plan, together with interest, for a five-year period.

2.       Hydro include the unamortized balance of the deferred Asbestos Abatement Plan costs in its rate base.

Date Issued:

January 12, 2005

 

 

Newfoundland and Labrador Hydro                                                                        P.U. 3 (2005)

Application:

For approval of additional 2005 capital expenditure for preliminary engineering and design work for a transmission interconnection of the Duck Pond Mine Site owned by Aur Resources Inc., an Intended industrial customer of Hydro, pursuant to Section 41 (3) of the Act.

Decision:

1.       Pursuant to Section 41 (3) of the Act, the Board approves the additional 2005 expenditure of $120,000 for the preliminary engineering and related work associated with a 55 km transmission interconnection to the Duck Pond Mine site owned by Aur Resources Inc., an intended industrial customer of Hydro.

2.       Pursuant to Section 41 (5) of the Act, the Board approves the contribution from Hydro’s intended industrial customer, Aur Resources Inc., of $120,000 towards the preliminary engineering and related work associated with a 55 km transmission interconnection to the Duck Pond Mine site.

Date Issued:

January 18, 2005

 

 

Newfoundland and Labrador Hydro                                                                        P.U. 4 (2005)

Application:                                                    

For approval of the Rate Stabilization Plan components of the rates to be charged to Industrial Customers pursuant to Section 70(1) of the Act.

Decision:

1.       The Board hereby approves the Firm Rates for Hydro’s Industrial Customers to be effective for consumption on or after January 1, 2005.

2.       Hydro shall pay the expenses of the Board incurred in connection with this matter.

Date Issued:

January 26, 2005

 

 

Newfoundland Power                                                                                              P.U. 5 (2005)

Application:

For approval to amend Order No. P.U. 48 (2004) issued on December 9, 2004, in connection with an application by Newfoundland Power Inc. for approval of (i) revised distribution line cost per meter for CIACs; (ii) revised distribution line plant upgrade cost for CIACs; and (iii) revised CIAC cost factors.

Decision:

Board Order No. P.U. 48 (2004) be amended as follows:

By deleting therefrom, section 1. (b), page 3, in its entirety and substituting therefore the following:

 

1.      (b)        Appendix A, Schedule “B”, Page 12 of 15 Revised January 31, 2002; and

Appendix C, Schedule “D”, Page 14 of 15 Revised January 31, 2002

 

of the Contribution in aid of Construction Policy: Distribution Line Extensions and Upgrades to General Service Customers, approved by Order No. 32 (2001-2002) be and they are hereby rescinded and replaced by the following Appendices, and appended to this Order:

 

Appendix A, Schedule “B”, Page 12 of 15 Revised January 1, 2005; and

Appendix C, Schedule “D”, Page 14 or 15 Revised January 1, 2005.

Date Issued:

February 1, 2005

 

 

Newfoundland Power                                                                                              P.U. 6 (2005)

Application:

For approval of a contribution in aid of construction for a line extension to serve Discovery Trail Farm Limited.

Decision:

Pursuant to Section 41(5) of the Act, the Board approves the contribution in aid of construction in the amount of Seventy-four thousand two hundred eleven dollars and eighty cents ($74,211.80), including HST, as calculated under the Policy to provide single-phase service to an abattoir for Discovery Trail Farm Limited, near Clarenville.

Date Issued:

February 9, 2005

 

 

Newfoundland and Labrador Hydro                                                                        P.U. 7 (2005)

Application:

For approval of a contribution in aid of construction for the supply of three-phase electrical service to a Chlorination Building located at Trout River, pursuant to Section 41(5) of the Act.

Decision:

Pursuant to section 41(5) of the Act, the Board approves the contribution in aid of construction in the amount of fifty thousand, twenty-seven dollars and nine cents ($50,027.09), including HST, for the supply of three-phase electrical service to the Chlorination Building located at the crossroads in Trout River, as calculated under the Policy.

Date Issued:

February 9, 2005

 

 

Newfoundland Power                                                                                              P.U. 8 (2005)

Application:

For approval of a contribution in aid of construction for a three-phase service upgrade for Ultramar Ltd.

Decision:

Pursuant to Section 41(5) of the Act, the Board approves the contribution in aid of construction in the amount of Sixteen thousand four hundred eighty-two dollars and ninety-five cents ($16,482.95), including HST, as calculated under the Policy to provide three-phase service to a service station/restaurant for Ultramar Ltd.

Date Issued:

March 22, 2005

 

Newfoundland Power                                                                                              P.U. 9 (2005)

Application:

For approval of a contribution in aid of construction for a line extension to serve the Government of Newfoundland and Labrador, Department of Environment and Conservation, who operates a recreation park located off Route 10 (Southern Shore Highway)

Decision:

Pursuant to Section 41(5) of the Act, the Board approves the contribution in aid of construction in the amount of Sixty thousand eight hundred thirty-five dollars ($60,835.00), including HST, as calculated under the Policy to provide single-phase service to a recreation park for the Government of Newfoundland and Labrador, Department of Environment and Conservation.

Date Issued:

March 22, 2005

 

Newfoundland Power                                                                                            P.U. 10 (2005)

Application:

For approval of a contribution in aid of construction for a line extension

Decision:

Pursuant to Section 41(5) of the Act, the Board approves the contribution in aid of construction.

Date Issued:

March 22, 2005

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 11 (2005)

Application:

For approval of (i) an additional proposed capital project (Cat Arm Road Rehabilitation);

(ii) an increased expenditure for a previously approved project (Upper Salmon Power Canal Slope Stabilization); (iii) the replacement of a failed diesel energy in the Ramea generating station; and (iv) a lease for employee accommodations, pursuant to Section 41 (3) of the Act.

Decision:

1.   The Board hereby approves, pursuant to Section 41(3) of the Act, additional 2005 capital expenditures as follows:

(i)      An amount of $1,260,000 for the rehabilitation of the Cat Arm Road;

(ii)    The increased amount of $2,671,000 to carry out remediation work for slope stabilization for the Upper Salmon power canal (being an increase of $1,668,000 over the amount previously approved);

(iii)   An amount of $225,700 for the replacement of a failed engine for its Ramea diesel generating station; and

(iv)  A lease for a dwelling house in Postville in the amount of $10,800 per annum.

2.   Hydro shall pay the expenses of the Board incurred in connection with this matter.

Date Issued:

April 15, 2005

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 12 (2005)

Application:

For approval of of (i) the construction of a transmission interconnection to the Duck Pond Mine Site, owned by Aur Resources Inc., situated to the southeast of Millertown, pursuant to Section 41(3) of the Act; and (ii) a customer contribution for the transmission interconnection, pursuant to Section 41 (5) of the Act.

Decision:

1.       Pursuant to Section 41 (3) of the Act, the Board approves the additional 2005 capital expenditure of $5,705,500 for the construction of a transmission interconnection of approximately 45 kilometres to the Duck Pond Mine site owned by Aur Resources Inc., an intended industrial customer of Hydro.

2.       Pursuant to Section 41 (5) of the Act, the Board approves the contribution from Hydro’s intended industrial customer, Aur Resources Inc., of $5,705,000 for the construction of the aforesaid transmission interconnection.

3.       Hydro shall pay the expenses of the Board incurred in connection with this matter.

Date Issued:

April 19, 2005

 

 

Newfoundland Power                                                                                            P.U. 13 (2005)

Application:

For approval of the balance of the weather normalization reserve as of December 31, 2004 pursuant to Sections 69(3) and 78 of the Public Utilities Act.

Decision:

NP’s weather normalization reserve of a Negative Balance of $10,477,386 as at December 31, 2004 is hereby approved.

Date Issued:

April 28, 2005

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 14 (2005)

Application:

For approval of two additional proposed capital budgets for 2005: (i) the replacement of the electronic control system for the governor of one Cat Arm Unit; and (ii) the addition of disconnecting means to 600 Volt motor control centre branch feeders at the Holyrood Thermal Plan pursuant to Section 41(3) of the Act.

Decision:

1.  Pursuant to Section 41(3) of the Act, additional 2005 capital expenditures are approved as follows:

(i)                  an amount of $377,600 for the replacement of the electronic control system for the governor of one of the generating units at the Cat Arm Generating Station; and

(ii)                an amount of $613,300 for the installation of disconnecting means to 600 Volt motor control centre branch feeders at the Holyrood Thermal Plant.

2.   Hydro shall pay the expenses of the Board incurred in connection with this matter.

Date Issued:

May 24, 2005

 

 

Newfoundland Power                                                                                            P.U. 15 (2005)

Application:

For approval of a Contribution in Aid of Construction for a line extension.

Decision:

Pursuant to Section 41(5) of the Act, the Board approves the CIAC.

Date Issued:

May 24, 2005

 

 

Newfoundland Power                                                                                            P.U. 16 (2005)

Application:

For approval of (1) Rate Stabilization and Municipal Tax Adjustments to be applied to the rates of NP for the period July 1, 2005 to June 30, 2006; and (2) a Schedule of Rates, Tolls and Charges incorporating the Rate Stabilization and Municipal Tax Adjustments, pursuant to Section 70(1) of the Act.

Decision:

1.       The Board hereby approves the following:

(i)      the Rate Stabilization Adjustment of 1.150 cents/kWh as set out in Schedule A and the Municipal Tax Adjustment factor of 1.02408 as set out in Schedule B to be applied to all bills based on consumption on and after July 1, 2005 to June 30, 2006; and

(ii)    the rates proposed by NP to be effective on all electrical consumption on and after July 1, 2005, set out in Schedule C.

2.   NP shall pay the expenses of the Board in connection with this Application.

Date Issued:

June 16, 2005

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 17 (2005)

Application:

For approval of rates to be charged its Island Interconnected Customers (Rate Class 1.1, 2.1, 2.2, 2.3, 2.4 and 4.1), Isolated Rural Domestic Customers (Rate Class 1.2D) and for Isolated Rural Street and Area Lighting (Rate Class 4.1D), pursuant to Section 70 of the Act and for approval of the Rates to be charged to Newfoundland Power Inc as affected by the change in the Rate Stabilization Plan component of the rates, pursuant to Section 71 of the Act.

Decision:

1.   The Board hereby approves the Schedules of Rates for Hydro’s Island Interconnected customers, attached hereto as Schedule A, and the Schedule of Rates for Hydro’s Isolated Rural Domestic customers and for Isolated Rural Street and Area Lighting, attached hereto as Schedule B, to be effective for consumption on and after July 1, 2005.

2.   The Board hereby approves the Schedule of Rates for Hydro’s retail customer, NP, attached hereto as Schedule C, to be effective as of July 1, 2005.

Date Issued:

June 16, 2005

 

 

Newfoundland Power                                                                                            P.U. 18 (2005)

Application:

For approval of a Contribution in Aid of Construction for a line extension.

Decision:

Pursuant to Section 41(5) of the Act, the Board approves the CIAC.

Date Issued:

June 22, 2005

 

 

Newfoundland Power                                  *P.U. 19 (2005) RESCINDED* see P.U. 27 (2005)

Application:

For approval of revisions to the policies respecting the demanding from customers of contributions toward the cost of improvements or additions to its property (“CIAC Policies”) pursuant to Sections 41 (6) and 55 of the Act.

Decision:

Pursuant to Section 41(6) and Section 55 of the Act, the Board approves the revised CIAC Policies as set out in Schedule “A” and Schedule “B” to this Order to be effective on and after July 1, 2005.

Date Issued:

June 22, 2005

 

 

Newfoundland Power                                                                                            P.U. 20 (2005)

Application:

For approval of to issue Series AK First Mortgage Sinking Fund Bonds pursuant to Section 91 of the Act.

Decision:

1.   Approval is hereby given to Newfoundland Power to issue Series AK First Mortgage Sinking Fund Bonds in an amount of up to $60,000,000 and on the general terms set out in the Application subject to the following conditions:

(a)          The Bonds shall be issued on or before December 31, 2005.

(b)          Newfoundland Power shall provide to the Board an Affidavit specifying the terms and conditions of the Bond issue within five (5) days (non-business days excepted) after closing the Bond issue.  In particular, the Affidavit shall set forth the following:

(i)                  date of the issue;

(ii)                term;

(iii)               maturity date;

(iv)              principal amount;

(v)                coupon rate;

(vi)              particulars of sinking fund, if any;

(vii)             price to public and to the underwriters;

(viii)           yield to the public;

(ix)              agency fee;

(x)                actual cost (i.e. yield) to Newfoundland Power,;and

(xi)              any other material terms or conditions not contemplated at the date of the Application but forming part of the negotiated terms and conditions.

(c)          Newfoundland Power shall provide to the Board a copy of the Agency Agreement relating to the Bond issue within five (5) days (non-business days excepted) after closing the Bond issue.

(d)          The proceeds from the Bond issue shall be used in the manner set out in paragraph 9 of the Application, and Newfoundland Power shall report by Affidavit to the Board on the disposition of the proceeds no later than January 15, 2006.

2.   All costs and expenses incurred by the Board in connection with the Application shall be borne by Newfoundland Power.

Date Issued:

July 14, 2005

 

 

Newfoundland Power                                                                                           P.U.  21 (2005)

Application:

For approval of a contribution in aid of construction (CIAC) for a residential subdivision located in the Town of Reidville.

Decision:

Pursuant to Section 41(5) of the Act, the Board approves the contribution in aid of construction in the amount of Eight thousand six hundred twenty-six dollars and fifteen cents ($8,626.15), including HST, as calculated under the Policy to provide single-phase electric service to a subdivision consisting of nine residential building lots located in the Town of Reidville.

Date Issued:

July 29, 2005

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 22 (2005)

Application:

For approval of a contribution in aid of construction (CIAC) for Aliant Communications Tower, Postville, Labrador

Decision:

Pursuant to Section 41(5) of the Act, the Board approves the contribution in aid of construction in the amount of One Hundred and Six thousand Four hundred fifty-three dollars $106,453.00), including HST, as calculated under the Policy, to supply single-phase electric service to one general service customer, Aliant Telecom Incorporated’s Communications Tower, located near the Transport Canada Airstrip at Postville, Labrador.

Date Issued:

September 9, 2005

 

 

Newfoundland Power                                                                                            P.U. 23 (2005)

Application:

For approval of a contribution in aid of construction for a line extension to serve Lakeside Investments Inc.

Decision:

Pursuant to Section 41(5) of the Act, the Board approves the deviation from the Policy as described in paragraph 9 of the Application to permit the Development to be treated as a subdivision for the purpose of calculating a CIAC under the Policy.

Date Issued:

September 9, 2005

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 24 (2005)

Application:

For approval, pursuant to Section 41 (3) of the Act, of a new proposed capital project for 2005, a Stage I Emergency diesel at Holyrood, and the approval of two Leases: (i) a lease for the iSeries Server; and (ii) an automobile lease.

Decision:

1.       Pursuant to Section 41(3) of the Act, changes to the 2005 capital expenditures and leases are approved as follows:

·         an amount of $192,600 for the replacement of a failed emergency diesel generating unit for the Holyrood Thermal Generating Station;

·         a 60-month lease of $179,987 per annum to lease the iSeries Server and related computer equipment as required for its approved iSeries Server Replacement Project;

·         a 40-month lease for an automobile in the annual amount of $9,961.56; and

·         the removal of the amount of $983,000 from the previously approved total budgeted capital expenditures.

2.   Hydro shall pay the expenses of the Board incurred in connection with this matter.

Date Issued:

September 23, 2005

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 25 (2005)

Application:

For approval, pursuant to Sections 41 (6) and 55 of the Act, revisions to its policies respecting the demanding from its customers of contributions for the costs of improvements or additions to its property ("CIAC policies").

Decision:

Pursuant to Section 41(6) and Section 55 of the Act, the Board approves:

(i)      the revised CIAC policies as set out in Schedule "A" and Schedule "B" attached hereto to be effective as of the date hereof.

Date Issued:

September 29, 2005

 

 

Newfoundland Power                                                                                            P.U. 26 (2005)

Application:

For approval, pursuant to Section 41(3) of the Act, of capital expenditures supplement to NP’s 2005 Capital Expenditure Budget [Order No. P.U. 43(2004)] to proceed with the construction and purchase of certain improvements to its property.

Decision:

Pursuant to Section 41(3) of the Act, the Board approves:

(a)     the capital expenditure in excess of $50,000, as set forth in Schedule "B" to the Application; and

(b)     the revised 2005 capital budget as set forth in Schedule "C" to the Application.

Date Issued:

September 29, 2005

 

 

Newfoundland Power                                                                                            P.U. 27 (2005)

Application:

For approval of revisions to correct omissions in the policies respecting the demanding from domestic and general service customers of contributions toward the cost of improvements or additions to its property (“CIAC Policies”) pursuant to Sections 41 (6) and 55 of the Act.

Decision:

1.       Pursuant to Section 41(6) and Section 55 of the Act, the Board approves the revised CIAC Policies as set out in Schedule “A” and Schedule “B” to this Order to be effective on and after July 1, 2005.

2.       Order No. P.U. 19 (2005) dated June 22, 2005 is hereby rescinded.

Date Issued:

November 2, 2005

 

 

Newfoundland Power                                                                                            P.U. 28 (2005)

Application:

For approval of a contribution in aid of construction (CIAC) for a line extension to serve cottage area customers located in a Cottage Area on the Witness Bay Line near Witless Bay.

Decision:

Pursuant to Section 41(5) of the Act, the Board approves the Non-Refundable Contribution in Aid of Construction in the amount of Two thousand one hundred sixty-one dollars and twenty-four cents ($2,161.24), including HST, for each domestic customer, as calculated under the Policy to provide single phase service to Domestic Customers located in a Cottage Area on the Witless Bay Line.

Date Issued:

November 7, 2005

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 29 (2005)

Application:

For approval of a contribution in aid of construction (CIAC) for a single-phase line extension to serve a Canadian Coast Guard Communications Tower located on dome Mountain, Happy Valley-Goose Bay, Labrador, pursuant to Section 41(5) of the Act.

Decision:

Pursuant to section 41(5) of the Act, the Board approves the contribution in aid of construction in the amount of $197,976.00, including HST, for the supply of single-phase electrical service to one general service customer, the Canadian Coast Guard Communications Tower, located on Dome Mountain, Happy Valley-Goose Bay, Labrador, as calculated under the Policy.

Date Issued:

November 10, 2005

 

 

Newfoundland Power                                                                                            P.U. 30 (2005)

Application:

For approval of:

(a)          its 2006 Capital Budget of $49,258,000;

(b)         approving 2006 leases with annual payments of $52,000; and

(c)          fixing and determining its average rate base for 2004 in the amount of $715,111,000.

Decision:

1.                               Pursuant to Section 41 of the Act, NP’s capital purchases and construction projects in excess of $50,000, as set out in Schedule A to this Order, are approved.

2.                               Pursuant to Section 41 of the Act, NP’s leases in excess of $5,000 a year, as set out in Schedule B to this Order, are approved.

3.                               Pursuant to Section 41 of the Act, the 2006 Capital Budget for improvement and additions to NP’s property in an amount of $ 49,258,000 is approved.

4.                               Pursuant to Section 78 of the Act, the rate base for the year ending December 31, 2004 is hereby fixed and determined at $ 715,111,000.

5.                               Unless otherwise directed by the Board, NP shall file an annual report to the Board on its 2006 capital expenditures by March 1, 2007.

6.                               In relation to the Wesleyville Gas Turbine Refurbishment project NP shall file, no later than the filing of its 2007 Capital Budget Application, a report including the final cost estimate, on the chosen alternative.

7.                               Unless otherwise directed by the Board, NP shall provide in conjunction with the 2007 Capital Budget Application, a status report on the 2006 capital budget expenditures showing for each project:

            (i)    the approved budget for 2006;

            (ii)   the expenditures prior to 2006;

            (iii)  the 2006 expenditures to the date of the application;

            (iv)  the remaining projected expenditures for 2006;

            (v)   the variance between the projected total expenditures and the approved budget; and

            (vi)  an explanation of the variance.

8.   NP shall pay all costs and expenses of the Board incurred in connection with the Application.

Date Issued:

November 14, 2005

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 31 (2005)

Application:

For approval of:

(a)  its 2006 Capital Budget in the amount of $42,636,000;

(b)    its 2006 Capital Purchases and Construction Projects in excess of $50,000;

(c)    its proposed estimated Contribution in Aid of Construction of approximately $300,000; and

(d)    fixing and determining Hydro’s average rate base for 2004 in the amount of $1,476,724,000.

Decision:

1.        Pursuant to subsection 41(3) of the Act, improvements and additions to Hydro’s property for construction and purchases in excess of $50,000, and leases in excess of $5,000 in a year, as set out in Section B to the Application and Schedule A attached to this Order, are approved.

2.        Pursuant to subsection 41(1) of the Act, the 2006 Capital Budget for improvements and additions to Hydro’s property in the amount of $42,636,000 is approved.

3.        Pursuant to section 78 of the Act Hydro’s average rate base for the year ending December 31st, 2004 is hereby fixed and determined at $1,476,724,000.

4.        Hydro shall pay all costs and expenses of the Board incurred in connection with this Application.

Date Issued:

November 30, 2005

 

 

Newfoundland Power                                                                                            P.U. 32 (2005)

Application:

For approval of a contribution in aid of construction (CIAC) for a line extension to serve domestic customers residing in a cottage area located in a Cottage Area at Thorburn Lake near Clarenville..

Decision:

Pursuant to Section 41(5) of the Act, the Board approves the Non-Refundable Contribution in Aid of Construction in the amount of Five thousand one hundred thirty-seven dollars and forty cents ($5,137.40), including HST, for each customer, as calculated in accordance with Clause 6(a) of the Policy to provide single phase service to Domestic Customers located in a Cottage Area at Thorburn Lake near Clarenville, Newfoundland and Labrador.

Date Issued:

December 13, 2005

 

 

Newfoundland Power                                                                                            P.U. 33 (2005)

Application:

For approval to proceed with the construction and purchase of certain improvements to its property pursuant to Section 41(3) of the Act and supplemental to its 2005 capital budget approved by Order No. P. U. 43(2004) and P. U. 26 (2005).

Decision:

1.   Pursuant to Section 41(3) of the Act, the Board approves the supplemental 2005 capital expenditures of:

         $500,000 for the Plant Refurbishment – Rocky Pond; and

$400,000 to Repair Portable Substation P-435.

2.   NP shall pay the expenses of the Board arising from this Application.

Date Issued:

December 15, 2005

 

 

Newfoundland Power                                                                                            P.U. 34 (2005)

Application:

For approval to proceed with the construction and purchase of certain improvements to its property pursuant to Section 41(3) of the Act and supplemental to its 2006 capital budget approved by Order No. P. U. 30(2005).

Decision:

1.   Pursuant to Section 41(3) of the Act, the Board approves the supplemental 2006 capital expenditures of:

         (i)  $963,200 for the Plant Refurbishment – Rocky Pond

2.   NP shall pay the expenses of the Board arising from this Application.

Date Issued:

December 15, 2005

 

 

Newfoundland Power                                                                                            P.U. 35 (2005)

Application:

For approval of changes to its System of Accounts pursuant to Section 58 of the Act and Order No. P.U. 44 (2004).

Decision:

Pursuant to Section 58 of the Act, the Board approves the definition of the Purchase Power Unit Cost Variance Reserve Account attached hereto and marked Schedule “A” for inclusion in Newfoundland Power’s System of Accounts to be effective for 2005.

Date Issued:

December 14, 2005

 

 

Newfoundland Power                                                                                            P.U. 36 (2005)

Application:

For approval of a contribution in aid of construction (CIAC) for a line extension to serve domestic customers residing in a cottage area located in a Cottage Area at Cape Pond Road, off the Southern Shore Highway.

Decision:

Pursuant to Section 41(5) of the Act, the Board approves the Non-Refundable Contribution in Aid of Construction in the amount of One thousand six hundred seventy-three dollars and twenty-six cents ($1,673.26), including HST, as calculated under the Policy, to provide single phase service to Domestic Customers located in a Cottage Area on Cape Pond Road off the Southern Shore Highway.

Date Issued:

December 14, 2005

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 37 (2005)

Application:

For approval of the rates to be charged to Labrador Interconnected Customers (Rate Class 2.1H, 2.2H, 2.3H, 2.4H, 1.1W, 2.1W, 4.11W, and 4.12W) and Isolated General Service Customers (excluding Government Departments) (Rate Class 2.1D and 2.2D), pursuant to Section 70 of the Act.

Decision:

Pursuant to Section 70 of the Act, the Board approves the Schedule of Rates for Hydro’s Labrador Interconnected Customers and the Schedule of Rates for Hydro’s Isolated Customers, attached hereto as Rates Schedules 1 to 11, to be effective for consumption on and after January 1, 2006.

Date Issued:

December 16, 2005

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 38 (2005)

Application:

For approval of the rates to be charged to Newfoundland Power Inc. effective January 1, 2006, pursuant to Section 70 of the Act.

Decision:

Pursuant to Section 70 of the Act, the Board approves the Schedule of Rates for Newfoundland Power Inc., attached hereto as Schedule 1, to be effective for consumption on and after January 1, 2006.

Date Issued:

December 14, 2005

 

 

Newfoundland Power                                                                                            P.U. 39 (2005)

Application:

For approval of a schedule of rates, tolls and charges on an interim basis pursuant to the operation of the Automatic Adjustment Formula.

Decision:

1.             Pursuant to Section 70 of the Act, the use of rates, tolls and charges approved in Order No. P. U. 16(2005), on an interim basis, to be effective on all electrical usage on and after January 1, 2006, is approved.

2.             No later than January 15, 2006 NP shall apply for approval of the forecast 2006 rate base, application of the Automatic Adjustment Formula to the rate of return on rate base and approval of its Schedule of Rates, Tolls and Charges.

3.             NP shall pay the expenses of the Board arising from this Application.

Date Issued:

December 23, 2005

 

 

Newfoundland Power                                                                                            P.U. 40 (2005)

Application:

For approval of the accounting policy of Newfoundland Power Inc. (“NP”) concerning revenue recognition and matters related thereto; and an application by NP for an order pursuant to Sections 67, 69, 78 and 80 of the Act:

(a) approving changes in accounting policy concerning revenue recognition to be effective for 2006 and subsequent years;

(b)  approving the recognition of $9,579,000 in 2005 Unbilled Revenue as revenue for regulatory purposes for 2006;

(c)  approving the disposition of the balance of the Unbilled Revenue Increase Reserve; and

(d)  approving revised values for rate base and invested capital for use in the Automatic Adjustment Formula for the calculation of return on rate base for 2006 pursuant to Order No. P. U. 19(2003).

Decision:

1.       NP’s proposal to adopt the Accrual Method of revenue recognition commencing in 2006 is approved.

2.       NP’s proposal to apply $295,000 of the 2005 Unbilled Revenue in 2006 to dispose of the current balance in the Unbilled Revenue Increase Reserve is approved.

3.       NP’s proposal to recognize for regulatory purposes $3,086,000 of the 2005 Unbilled Revenue in 2006 to account for income tax effects arising from the tax settlement is approved.

4.       NP shall defer recovery of an increase in 2006 depreciation expense of $5,793,000 in 2006 related to the amortization of the depreciation true-up as approved in Order No. P.U. 19(2003) until a further Order of the Board.

5.       NP shall deduct the average value of the unrecognized 2005 Unbilled Revenue from rate base commencing in 2006.

6.       NP shall, for regulatory purposes commencing in 2006, discontinue the use of regulated common equity and substitute book common equity in the calculation of return on rate base.

7.       NP shall file with its 2005 and 2006 annual returns a schedule which provides a reconciliation of the balance of the unrecognized 2005 Unbilled Revenue.

8.       NP shall pay the expenses of the Board arising from this Application, including the expenses of the Consumer Advocate incurred by the Board.

Date Issued:

December 23, 2005


Newfoundland and Labrador Hydro                                                                        P.U. 1 (2004)

Application:

For approval  (i) its 2004 Capital Budget pursuant to s.41 (1) of the Act; (ii) its 2004 capital purchases and construction projects in excess of $50,000 pursuant to s.41 (3)(a) of the Act; and (iii) its estimated contributions in aid of construction for 2004 pursuant to s. 41 (5) of the Act.

Decision:

Pursuant to subsection 90(1) of the Act, (1) the costs of the Industrial Customers are filed at $23,629.53 (US) and (2) NLH shall, within 30 days, pay intervenor costs to the Industrial Customers in the amount of $23,629.53 (US).

Date Issued:

January 28, 2004

 

 

Newfoundland Power                                                                                              P.U. 2 (2004)

Application:

For approval of a contribution in aid of construction (“CIAC”) for a line extension to serve seasonal customers whose residents are located at Gould’s Pond near Hodgewater Line, pursuant to section 41(5) of the Act.

Decision:

Pursuant to section 41(5) of the Act, the Board approves a CIAC in the amount of $7,111.03, including HST, for each Seasonal Customer, as calculated under the CIAC Policy.

Date Issued:

February 3, 2004

 

 

Newfoundland Power                                                                                              P.U. 3 (2004)

Application:

For approval of a contribution in aid of construction (“CIAC”) for a line extension to serve seasonal customers and residential customers whose residents are located at Lily Brook, near the community of Terra Nova, pursuant to section 41(5) of the Act.

Decision:

Pursuant to section 41(5) of the Act, the Board approves a CIAC in the amount of $2,683.33, including HST, for each Seasonal Customer, and $199.33, including HST, for the Residential Customer, as calculated under the CIAC Policy.

Date Issued:

February 3, 2004

 

 

Newfoundland Power                                                                                              P.U. 4 (2004)

Application:

For approval of a contribution in aid of construction (“CIAC”) for a line extension

Decision:

Pursuant to section 41(5) of the Act, the Board approves a CIAC.

Date Issued:

February 3, 2004

 

 

Newfoundland and Labrador Hydro                                 P.U. 5 (2004) / Reasons For Decision

Application:

For approval to proceed with the construction and purchase of improvements and additions to its property, pursuant to s.41 (3) of the Act.

Decision:

1.   Pursuant to section 41(3) of the Act, (1) the Board approves the supplementary 2004 capital expenditures of: (i) $793,000 for the End User Evergreen Program; (ii) $638,800 for the Office Server Operating System and Productivity Tools Evergreen Program; and (iii) $102,000 for the engineering study into the Upper Salmon Power Canal – Slope Stabilization.

2.   NLH shall pay all the expenses of the Board arising from this application.

3.   There will be no Order as to the costs.

Date Issued:

February 5, 2004

 

 

Newfoundland and Labrador Hydro                                                                        P.U. 6 (2004)

Application:

For approval of the lease of office space for a five-month period in the Prince Charles Building to support its 2004 regulatory activities pursuant to Section 41 of the Act.

Decision:

Pursuant to section 41(3) of the Act, the Board approves the proposed five-month lease of office space in the Prince Charles Building for the amount of $1,200 per month, plus HST.

Date Issued:

March 9, 2004

 

 

Newfoundland and Labrador Hydro                                                                        P.U. 7 (2004)

Application:

For approval of the lease of real property upon which to continue to operate an ambient air monitoring station, pursuant to Section 41 of the Act.

Decision:

Pursuant to section 41(3) of the Act, the Board approves the proposed five-year lease of a parcel of land in the vicinity of Lawrence Pond in the Town of Conception Bay South upon which to continue to operate an ambient air monitoring station in the amount of $6,000 per year, plus HST.

Date Issued:

March 9, 2004

 

 

Newfoundland Power                                                                                              P.U. 8 (2004)

Application:

For approval of a contribution in aid of construction for a line extension to serve the Town of Avondale, pursuant to Section 41(5) of the Act.

Decision:

Pursuant to section 41(5) of the Act, the Board approves the contribution in aid of construction in the amount of Fifty thousand nine hundred ninety-one dollars ($50,9991.00), including HST, as calculated under the CIAC Policy to provide three-phase service to a pumping station for the Town of Avondale.

Date Issued:

March 9, 2004

 

 

Newfoundland Power                                                                                              P.U. 9 (2004)

Application:

For approval of a contribution in aid of construction for a line extension to serve seasonal customers whose residences are located at Reid’s Pond near Whitbourne, pursuant to Section 41(5) of the Act.

Decision:

Pursuant to section 41(5) of the Act, the Board approves the contribution in aid of construction in the amount of Six thousand four hundred eighty-four dollars and nineteen cents ($6,484.19), including HST, for each Seasonal Customer, as calculated under the Policy.

Date Issued:

April 15, 2004

 

 

Newfoundland Power                                                                                             P.U. 10(2004)

Application:

For approval of a contribution in aid of construction to provide single-phase service to a cellular telephone tower for Aliant Telecom Inc.

Decision:

Pursuant to section 41(5) of the Act, the Board approves the contribution in aid of construction in the amount of Ninety-eight thousand six hundred forty-three dollars and fifty-five cents ($98,643.55), including HST, as calculated under the CIAC Policy to provide single-phase service to a cellular telephone tower for Aliant Telecom Inc.

Date Issued:

April 15, 2004

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 11 (2004)

Application:

For approval of a contribution in aid of construction for a line extension to serve an Attendants’ Cabin locate at the Torrent River Fishway, near Hawkes Bay, pursuant to Section 41(5) of the Act.

Decision:

Pursuant to section 41(5) of the Act, the Board approves the contribution in aid of construction in the amount of Twenty-five thousand, two hundred ninety-two dollars and fifty-two cents ($25,292.52), including HST, as calculated under the CIAC Policy to provide single-phase electrical service to one (1) general service customer located at the Torrent River Fishway, near Hawkes Bay.

Date Issued:

April 15, 2004

 

 

Newfoundland Power                                                                                            P.U. 12 (2004)

Application:

For approval of a contribution in aid of construction for a line extension to serve the Town of Paradise, pursuant to Section 41(5) of the Act.

Decision:

Pursuant to section 41(5) of the Act, the Board approves the contribution in aid of construction in the amount of Twenty-three thousand one hundred thirty-two dollars and ninety-four cents ($23,132.94), including HST, as calculated under the CIAC Policy to provide three-phase service to a pumping station for the Town of Paradise.

Date Issued:

April 15, 2004

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 13 (2004)

Application:

For approval of an additional 2004 capital expenditures, pursuant to Section 41(3) of the Act.

Decision:

Pursuant to section 41(3) of the Act, the Board approves the additional 2004 expenditure of $302,600 to replace a 300 kW diesel unit (#564) with a new 450 kW diesel unit in Port Hope Simpson.

Date Issued:

May 7, 2004

 

 

Newfoundland and Labrador Hydro                               P.U. 14 (2004), Appendices

Application:

Application by Newfoundland and Labrador Hydro (the “NLH”) for approval, inter alia, rates to be charged its customers (the “Application”) pursuant to the Electrical Power Control Act, 1994 and the Public Utilities Act R.S.N. 1990, Chapter P-47 and proposed amendments to the Rate Stabilization Plan.

Decision:

Please click Order for complete details.

Date Issued:

May 4, 2004

 

 

Newfoundland Power                                                                                            P.U. 15 (2004)

Application:

For approval of a contribution in aid of construction (“CIAC”) for a line extension to serve Humber Valley Resort Corporation located near Corner Brook pursuant to Section 41(5) of the Act.

Decision:

Pursuant to Section 41(5) of the Act, the Board approves:

                                                                     I.      the deviation from the Residential Policy as described in paragraph 10 of the Application; and

                                                                   II.      the contribution in aid of construction of Thirty-three thousand six hundred ninety-two dollars and seventy cents ($33,692.70), including HST, as calculated under the Policy to provide single-phase service to 118 building lots and a marina.

Date Issued:

May 19, 2004

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 16 (2004)

Application:

For approval of an additional 2004 capital expenditures, pursuant to Section 41(3) of the Act.

Decision:

Pursuant to section 41(3) of the Act, the Board approves the additional 2004 expenditure of $465,000 for the upgrade to the security infrastructure, plan and procedures at Hydro’s Holyrood Marine Terminal.

Date Issued:

June 3, 2004

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 17 (2004)

Application:

Application by Newfoundland and Labrador Hydro (the “NLH”) for approval, inter alia, rates to be charged its customers (the “Application”) pursuant to the Electrical Power Control Act, 1994 and the Public Utilities Act R.S.N. 1990, Chapter P-47 and proposed amendments to the Rate Stabilization Plan.

Decision:

1.             The forecast average 2004 test year Rate Base is hereby approved to be $1,483,506,000.

2.             The Board hereby allows a Rate of Return on Rate Base, based on the 2004 test year, of 7.466%.

3.             The Board hereby approves the Schedule of Rates as filed by NLH, attached hereto as Schedule “A” of this Order, which excludes Rates for its Rural Isolated and Island Interconnected Customers.

4.             The Rates approved in Schedule “A” will be effective for consumption on and after July 1, 2004 for all customers, except Labrador Interconnected firm customers, whose rates will be effective for bills issued on and after July 1, 2004.

Date Issued:

June 11, 2004

 

 

Newfoundland Power                                                                                            P.U. 18 (2004)

Application:

Application for approval of (1) amendments to NP’s Rate Stabilization Clause and Municipal Tax Clause and (2) Rate Stabilization and Municipal Tax Adjustments to be applied to the rates of NP for the period July 1, 2004 to June 30, 2005, pursuant to Section 71 of the Act.

Decision:

The Board approves the following:

1.        the Rate Stabilization Clause set out in Schedule A;

2.        the Municipal Tax Clause set out in Schedule B; and

3.        the Rate Stabilization Adjustment of 0.688 cents/kWh and the Municipal Tax Adjustment factor of 1.02486 to be applied to all bills based on consumption on and after July 1, 2004 to June 30, 2005.

Date Issued:

June 25, 2004

 

 

Newfoundland Power                                                                            P.U. 19 (2004) Amended

Application:

Application to revise its schedule of rates, tolls and charges to permit recovery of additional costs payable to Newfoundland and Labrador Hydro for the supply of power as a result of Order No. P. U. 17(2004) and for the approval of an amendment to NP’s Rate Stabilization Clause.

Decision:

1.        The Board hereby approves the rates, tolls and charges attached in Schedule “A”, to be effective on all energy consumed on and after July 1, 2004 as well as other charges which are billed on and after that date.

2.        The Board hereby approves the Rate Stabilization Clause attached hereto and marked as Schedule “B”, effective July 1, 2004.

3.        All costs and expenses incurred by the Board in connection with the Application shall be borne by NP.

Date Issued:

June 25, 2004

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 20 (2004)

Application:

Application by Newfoundland and Labrador Hydro for approval of, inter alia, rates to be charged its customers and resulting Order Nos. P. U. 14(2004) and P. U. 17(2004).

Decision:

1.        The Board hereby approves the Schedule of Rates for Hydro’s Rural Isolated Customers, attached hereto as Schedule “A”, and the Schedule of Rates for Hydro’s Island Interconnected Customers, attached hereto as Schedule “B”, to be effective for consumption on and after July 1, 2004.

2.        The Board hereby approves the revisions to the Rules and Regulations, attached hereto as Schedule “C”, to be effective July 1, 2004.

3.           Hydro shall file a report with its next General Rate Application documenting any changes to its policies for automatic changes in rates for all of Hydro’s rural customers whose rates and rate changes are tied to NP’s rates that are necessary to ensure the policies are consistent with existing legislation, Government direction and Board Orders.

Date Issued:

June 25, 2004

 

 

Newfoundland Power                                                                                            P.U. 21 (2004)

Application:

For an Order rescinding Order No. P.U. 9(2004), pursuant to section 76 of the Act and approval of a revised contribution in aid of construction (“CIAC”) for a line extension to serve seasonal customers located at Reid’s Pond near Whitbourne, pursuant to Section 41(5) of the Act.

Decision:

1.       Pursuant to Section 76 of the Act, Order No. P.U. 9(2004) is hereby rescinded; and

2.       Pursuant to Section 41(5) of the Act, the Board approves:

a)      The CIAC of Six thousand four hundred eighty-four dollars and nineteen cents ($6,484.19), including HST, as calculated under the Policy; and

b)      the suspension of the payment of refunds to the Customers until such time as the shortfall of $420.41 per customer is recovered.

Date Issued:

July 6, 2004

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 22 (2004)

Application:

For approval of a contribution in aid of construction (“CIAC”) for a single-phase extension to serve a Microwave Communications Tower located on Moliak Hill, near Rigolet, Labrador, pursuant to Section 41(5) of the Act.

Decision:

Pursuant to Section 41(5) of the Act, the Board approves the contribution in aid of construction in the amount of five hundred seventy thousand, eight hundred and forty-six dollars ($570,846.00), including HST, for the supply of single-phase electrical service to one (1) general service customer, Aliant Telecom Incorporated’s Microwave Communications Tower site, located on Moliak Hill, near Rigolet, Labrador as calculated under the Policy.

Date Issued:

July 6, 2004

 

 

Newfoundland Power                                                                                            P.U. 23 (2004)

Application:

For approval of a contribution in aid of construction (“CIAC”) for a line extension to serve season customers located at Mobile First Pond near the community of Mobile pursuant to Section 41(5) of the Act.

Decision:

Pursuant to Section 41(5) of the Act, the Board approves:

a)      the contribution in aid of construction in the amount of Two thousand four hundred seventy-one dollars and fifty-one cents ($2,471.51), including HST, as calculated under the Policy; and

b)      the suspension of the payment of the refunds to the Customers until such time as the shortfall of $522.22 per customer is recovered.

Date Issued:

July 6, 2004

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 24 (2004)

Application:

For approval of an award of costs to the Towns of Labrador City and Wabush resulting from Orders No. P.U. 14 and 17 (2004).

Decision:

1.       The amount of the award of costs to the Towns of Labrador City and Wabush in this matter is fixed at $55,000.

2.        Hydro shall, within 30 days of the date of this Order, pay the award of costs of $55,000 to the Towns of Labrador City and Wabush.

Date Issued:

July 8, 2004

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 25 (2004)

Application:

For approval of an award of costs to the Industrial Customers resulting from Orders No. P.U. 14 and 17 (2004).

Decision:

1.        The amount of the award of costs to the Industrial Customers in this matter is fixed at $315,000.

2.        Hydro shall, within 30 days of the date of this Order, pay the award of costs of $315,000 to the Industrial Customers.

Date Issued:

July 8, 2004

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 26 (2004)

Application:

For approval of a contribution in aid of construction (“CIAC”) for a single-phase line extension to serve the West Pond Cottage area, Halls Bay near South Brook Junction, pursuant to Section 41(5) of the Act.

Decision:

Pursuant to Section 41(5) of the Act, the Board approves the contribution in aid of construction in the amount of nine hundred thirty-five dollars and seventy cents ($3,935.70), including HST, for the supply of single-phase electrical service to twenty-nine (29) seasonal residential customers located at the West Pond Cottage Area, Halls Bay, located near South Brook Junction, as calculated under the Policy.

Date Issued:

July 21, 2004

 

 

Newfoundland Power                                                                                            P.U. 27 (2004)

Application:

For approval of a contribution in aid of construction (“CIAC”) for a single-phase line extension to serve seasonal customers located at the Hell Pond Road near the community of La Manche, pursuant to Section 41(5) of the Act.

Decision:

Pursuant to Section 41(5) of the Act, the Board approves the contribution in aid of construction in the amount of Three thousand nine hundred twenty-one dollars and fifty cents ($3,921.50), including HST, as calculated under the Policy to provide single-phase service to Seasonal Customers located at Hell Hill Pond Road near La Manche.

Date Issued:

July 21, 2004

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 28 (2004)

Application:

For approval of additional 2004 capital expenditures pursuant to Section 41(3) of the Act.

Decision:

1.                          Pursuant to Section 41(3) of the Act, the Board approves the additional 2004 expenditure of $258,100 for the replacement of a diesel generating unit at Hydro’s Hopedale diesel generating station.

2.                          Hydro shall pay the expense of the Board arising from this matter.

Date Issued:

July 30, 2004

 

 

Newfoundland Power                                                                                            P.U. 29 (2004)

Application:

For approval of a contribution in aid of construction (“CIAC”) for a line extension to serve Humber Valley Resort Corporation, pursuant to Section 41(5) of the Act.

Decision:

Pursuant to Section 41(5) of the Act, the Board approves:

(a)    the deviation from the Residential Policy as described in paragraph 9 of the Application; and

(b)    the contribution in aid of construction of Twenty-one thousand six hundred ninety-seven dollars and five cents ($21,697.05), including HST, as calculated under the Policy to provide single-phase service to 93 building lots.

Date Issued:

August 20, 2004

 

 

Newfoundland Power                                                                                            P.U. 30 (2004)

Application:

For approval of a contribution in aid of construction (“CIAC”) for a single-phase line extension to serve Seasonal Customers located at Saltwater Pond, near Cottrell’s Cove, pursuant to Section 41(5) of the Act.

Decision:

Pursuant to Section 41(5) of the Act, the Board approves the contribution in aid of construction in the amount of Four thousand three hundred fifty-one dollars and sixty cents ($4,351.60), including HST, as calculated under the Policy to provide single-phase service to Seasonal Customers located at Saltwater Pond, near Cottrell’s Cove.

Date Issued:

August 20, 2004

 

 

Newfoundland Power                                                                                            P.U. 31 (2004)

Application:

For approval of a contribution in aid of construction (“CIAC”) for a single-phase line extension.

Decision:

Pursuant to Section 41(5) of the Act, the Board approves the contribution in aid of construction

Date Issued:

August 20, 2004

 

 

Newfoundland Power                                                                                            P.U. 32 (2004)

Application:

For approval of a contribution in aid of construction (“CIAC”) for a single-phase line extension

Decision:

Pursuant to Section 41(5) of the Act, the Board approves the contribution in aid of construction.

Date Issued:

August 20, 2004



Newfoundland Power                                                                                            P.U. 33 (2004)

Application:

For approval of the balance of the weather normalization reserve as of December 31, 2003, pursuant to Sections 69(3) and 78 of the Act.

Decision:

Pursuant to Sections 69(3) and 78 of the Act, the Board approves NP’s weather normalization reserve of a Negative Balance of $10,434,575 as at December 31, 2003 be and the same is hereby approved.

Date Issued:

August 25, 2004

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 34 (2004)

Application:

For approval to relocate its mobile diesel generating units from Roddickton to St. Anthony; pursuant to Section 41 of the Act.

Decision:

1.       Pursuant to Section 38 of the Act, the Board consents to the relocation of Hydro’s two 850 kW mobile diesel generating units from Roddickton to St. Anthony.

2.        Pursuant to Section 41(3) of the Act, the Board approves the supplementary 2004 capital expenditure of $95,200 by Hydro to carry out the relocation of its two 850 kW mobile diesel generating units from Roddickton to St. Anthony

3.        Hydro will pay all costs of the Board associated with this Application.

Date Issued:

September 2, 2004

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 35 (2004)

Application:

For approval of a contribution in aid of construction (“CIAC”) for a single-phase line extension to serve the West Pond Cottage area, Halls Bay near South Brook Junction, pursuant to Section 41(5) of the Act.

Decision:

1.   Pursuant to Section 76 of the Act Order No. P. U. 26(2004) is hereby rescinded.

2.   Pursuant to Section 41(5) of the Act, the Board approves:

(i)   the contribution in aid of construction in the amount of three thousand, nine hundred thirty-five dollars and seventy cents ($3,935.70) each, including HST, for the supply of single-phase electrical service to twenty-two (22) Seasonal Residential Customers located at the West Pond Cottage Area, Halls Bay, located near South Brook Junction; and

(ii)  the suspension of the payment of refunds to the Customers until such time as the shortfall of $19,879.20 is recovered.

Date Issued:

September 9, 2004

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 36 (2004)

Application:

Request from Hydro for written consent of the Board for the termination of service and abandonment of the distribution line to the Nugget Pond Division of Richmont Mines Inc., at the Hammerdown mine site, pursuant to Section 38 of the Act.

Decision:

Pursuant to Section 38 of the Act, the Board consents to the termination of service and abandonment of the distribution line providing electrical service to the Nugget Pond Division of Richmont Mines Inc., at the Hammerdown mine site located near the community of King’s Point.

Date Issued:

September 9, 2004

 

 

Newfoundland Power                                                                                            P.U. 37 (2004)

Application:

Application for Approval of a Contribution In Aid of Construction (CIAC) for Inco Limtied’s Hydromet Demonstration Site located at Argentia.

Decision:

Pursuant to Section 41(5) of the Act, the Board approves the CIAC of Sixty-three thousand eight hundred thirty-two dollars and ninety-eight cents ($63,832.98), including HST, as calculated under the Policy to provide three-phase service to a nickel processing facility for Inco Limited.

Date Issued:

October 22, 2004

 

 

Newfoundland Power                                                                                            P.U. 38 (2004)

Application:

Application for Approval of a Contribution In Aid of Construction (CIAC) for a Seasonal Customer located near Port Blandford.

Decision:

Pursuant to Section 41(5) of the Act, the Board approves the CIAC of Six thousand five hundred ninety-four dollars and ten cents ($6,594.10), including HST, as calculated under the Policy to provide single-phase electrical service to Mr. Oscar Heaney at Port Blandford.

Date Issued:

October 22, 2004

 

 

Newfoundland Power                                                                                            P.U. 39 (2004)

Application:

Application for Approval of a Contribution In Aid of Construction (CIAC) for Seasonal Customers located at Beaver Pond Road near the existing George’s Lake Cottage Area.

Decision:

Pursuant to Section 41(5) of the Act, the Board approved the CIAC of Two thousand nine hundred eighty-nine dollars and one cent ($2,989.01) including HST, as calculated under the Policy to provide single-phase service to Seasonal Customers, located at Beaver Pond Road.

Date Issued:

October 22, 2004

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 40 (2004)

Application:

Proposal from Hydro for a range of return on rate base pursuant to Order No. P. U. 14(2004).

Decision:

1.  The Board approves a range of rate of return on rate base for Hydro of 30 basis points (±15 basis points), effective January 1, 2005.

2. The Board approves the definition of excess earnings as set out below, with any balance greater than zero as of December 31 of each year, commencing January 1, 2005, to be recorded in Hydro’s excess earnings account as a liability and reported to the Board as part of its annual financial report.

Definition of Excess Earnings

Excess earnings shall be defined as the greater of A-(B x C) and 0 where:

A = Actual return on rate base, calculated as net interest expense, including debt guarantee fee, plus net income

B = Actual average rate base, December 31

C = Upper limit of return on rate base, defined as Test Year Return on Rate Base + 15 basis points

Date Issued:

October 27, 2004

 

 

The Towns of Labrador City and Wabush                                                            P.U. 41 (2004)

Application:

Application by the Towns of Labrador City and Wabush for reconsideration of costs awarded in Order No. P.U. 24(2004)

Decision:

The application by the Towns of Labrador City and Wabush for reconsideration of Order No. P.U. 24(2004) is denied.

Date Issued:

October 27, 2004

 

 

The Industrial Customers                                                                                    P.U. 42 (2004)

Application:

Application by the Industrial Customers for reconsideration of costs awarded in Order No. P.U. 25 (2004).

Decision:

The application by the Industrial Customers for reconsideration of Order No. P.U. 24(2004) is denied.

Date Issued:

October 27, 2004

                                                                                                                                            

 

Newfoundland Power                                                                                            P.U. 43 (2004)

Application:

Application for approval of, pursuant to Sections 41, 78 and 80 of the Act:

(a) approving its 2005 Capital Budget of $48,141,000;

(b) (i) fixing and determining its average rate base for 2003 in the amount of $675,730,000; (ii) approving its revised forecast average rate base for 2004 in the amount of $713,072,000; and (iii) approving its forecast average rate base for 2005 in the amount of $740,142,000; and

(c) approving revised values for rate base and invested capital for use in the automatic adjustment formula (the “Automatic Adjustment Formula”) for the calculation of return on rate base for 2005 pursuant to Order No. P.U. 19 (2003).

Decision:

1.       Pursuant to Section 41(3) of the Act, NP’s capital purchases and construction projects in excess of $50,000, as set out in Schedule A this Order, are approved.

2.          Pursuant to Section 41(1) of the Act, the 2005 Capital Budget for improvement and additions to NP’s property in an amount of $48,141,000 is approved.

3.       Pursuant to Section 78 of the Act, the rate base for the year ending December 31, 2003 is hereby fixed and determined at $675,730,000.

4.       The forecast average rate base for 2004 in the amount of $713,072,000 and for 2005 in the amount of $740,142,000, are approved.

5.       Unless otherwise directed by the Board, NP shall file an annual report to the Board on its 2005 capital expenditures by March 1, 2006.

6.       Unless otherwise directed by the Board, NP shall provide in conjunction with the 2006 Capital Budget Application, a status report on the 2005 capital budget expenditures showing for each project:

            the approved budget for 2005;

            the expenditures prior to 2005;

            the 2005 expenditures to the date of the application;

            the remaining projected expenditures for 2005;  

            the variance between the projected total expenditures and the approved budget; and           

            an explanation of the variance.

7.       Unless otherwise directed by the Board, NP shall file with the Board, no later than its Capital Budget Application for 2006, a copy of the study with respect to NP’s strategy to assess all aspects of operating and capital expenditure associated with meter reading.

8.      Unless otherwise directed by the Board, NP shall file with the Board, no later than its Capital Budget Application for 2006, a report on the chosen alternative with respect to the Wesleyville Gas Turbine.

9.      NP shall pay all costs and expenses of the Board incurred in connection with the Application.

Date Issued:

November 22, 2004

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 44 (2004)

Application:

Newfoundland and Labrador Hydro Application for a Demand and Energy Rate to be charged Newfoundland Power Inc.

Decision:

1.       The Board approves the demand and energy rate to NP as proposed by Hydro to be effective January 1, 2005 as set out in Schedule 1 to this Order.

2.       The Board approves Hydro’s proposal for a three-year phase-in of the demand and energy rate to NP.

3.       Hydro shall file an application for subsequent adjustments to the demand and energy rate for NP in accordance with the proposed phase-in schedule.

4.       The Board approves the establishment by NP of a reserve as proposed.

5.       NP shall file an application no later than March 1 of each year for the disposition of the balance in the reserve for the previous year.

Date Issued:

December 8, 2004

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 45 (2004)

Application:

Newfoundland and Labrador Hydro Application for approval of a Contribution in Aid of Construction (CIAC) for a single-phase line extension to serve the Southwest Brook Microwave Communications Tower located approximately 17 km southwest of St. Julien’s Intersection on Route 432, pursuant to Section 41(5) of the Act.

Decision:

Pursuant to Section 41(5) of the Act, the Board approves the Contribution in Aid of Construction in the amount of nine hundred and eight thousand, four hundred and thirty-eight dollars (908,438.00), including HST, for the supply of single-phase electrical service to one (1) general service customer, Aliant Telecom Incorporated’s Southwest Brook Microwave Communications Tower, located on Route 432 approximately 17 km southwest of St. Julien’s Intersection, as calculated under the Policy.

Date Issued:

December 9, 2004

 

 

Newfoundland Power                                                                                            P.U. 46 (2004)

Application:

Application for approval of capital expenditures supplemental to Newfoundland Power Inc.’s (the “Company”) 2004 Capital Expenditures Budget approved by Order No. P. U. 35(2003)

Decision:

Pursuant to Section 41(3) of the Act, the Board approves:

a)       the construction projects and capital purchases totaling $100,000, as set forth in Schedule “B” to the Application; and

b)      the revised 2004 capital budget totaling $52,309,000 as set forth in Schedule “C” to the Application.

Date Issued:

December 9, 2004

 

 

Newfoundland Power                                                                                            P.U. 47 (2004)

Application:

Application for approval of a Contribution in Aid of Construction (CIAC) for a line extension to serve seasonal customers located at Goose Cove, near Trinity, Trinity Bay, pursuant to Section 41(5) of the Act.

Decision:

Pursuant to Section 41(5) of the Act, the Board approves a Contribution in Aid of Construction in the amount of Four thousand and one hundred eighty-three dollars and seventy cents ($4,183.70), including HST, as calculated under the Policy to provide single phase service to two seasonal customers, located at Goose Cove, near Trinity, Trinity Bay.

Date Issued:

December 9, 2004

 

 

Newfoundland Power                                                                                            P.U. 48 (2004)

Application:

Application for approval of (i) revised distribution line cost per metre for CIAC’s; (ii) revised distribution plant upgrade cost for CIAC’s; and (iii) revised contribution in aid of construction (CIAC) cost factors.

Decision:

1. (a)  Appendix A, Schedule A, Page 11 of 11 Revised, of the Contribution in Aid of Construction Policy: Distribution Line Extensions to Residential and Seasonal Residential Customers, approved by Order No. P.U. 32 (2001-2002) be and it is hereby rescinded and replaced by Appendix A, Schedule A, Page 11 of 11 Revised January 1, 2005, appended to this Order.

   (b)  Appendix A, Schedule B, Page 12 of 15 Revised January 31, 2002,

         Appendix B, Schedule C, Page 13 of 15 Revised January 31, 2002, and

         Appendix C, Schedule D, Page 14 of 15 Revised January 31, 2002

 

of the Contribution in Aid of Construction Policy: Distribution Line Extensions and Upgrades to General Service Customers, approved by Order No P.U. 32 (2001-2002) be and they are hereby rescinded and replaced by the following Appendices, and appended to this Order:

            Appendix A, Schedule B, Page 12 of 15 Revised January 1, 2005,

            Appendix B, Schedule C, Page 13 of 15 Revised January 1, 2005, and

            Appendix C, Schedule D, Page 14 of 15 Revised January 1, 2005.

 

   (c)  Appendix D, Schedule “E”, Page 15 of 15, Revised January 31, 2002

 

of the Contribution In Aid of Construction Policy, CIAC Cost Factors to General Service customers,  approved by Order No. P.U. 32 (2001-2002) be and it is hereby revised and replaced by the following appendix, and appended to this Order

 

Appendix D, Schedule “E”, Page 15 of 15, Revised January 1, 2005.

 

2.      The revised cost factors submitted with the application dated October 13, 2004, and approved above, are to be used in the calculation of all CIAC’s with effect from January 1, 2005, and, where advantageous to customers of the Newfoundland Power, on all CIAC’s quoted but unpaid as of January 1, 2005.

 

3.             Newfoundland Power submit a revised CIAC Policy in its entirety incorporating the revisions approved herein.

Date Issued:

December 9, 2004

 

 

Newfoundland Power                                                                                            P.U. 49 (2004)

Application:

Application for approval of a variation from generally accepted accounting principles concerning the amortization of costs associated with a proposed Early Retirement Program, pursuant to Section 58 of the Act.

Decision:

The Board approves the following treatment of the 2005 Retirement Program:

a)       the Ten-Year Amortization Methodology for the pension expense and the funding of the pension liability, and

b)      the Twenty-Four Month Amortization Methodology for the aggregate retirement allowance.

Date Issued:

December 9, 2004

 

 

Newfoundland Power                                                                                            P.U. 50 (2004)

Application:

Application for approval of a Proposed Rate of Return on Rate Base, a Proposed Definition of the Excess Earnings Account and a Proposed Schedule of Rates, Tolls and Charges, to be effective January 1, 2005, pursuant to the Automatic Adjustment Formula.

Decision:

The Board approves:

o       pursuant to Section 80 of the Act, a rate of return on rate base for 2005 of 8.68% in a range of 8.50% to 8.86%;

o       pursuant to Section 80 of the Act, a revised definition of the Excess Earnings Account, as set out in Schedule 1; and,

o       pursuant to Section 70 of the Act, the rates, tolls and charges, to be effective on all electrical usage on and after January 1, 2005, as set out in Schedule 2.

Date Issued:

December 9, 2004

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 51 (2004)

Application:

Newfoundland and Labrador Hydro Application for approval of the implementation of the 2005 rates to be charged to: (i) Hydro’s Labrador Interconnected customers in accordance with the five-year implementation of uniform rates for the Labardor Interconnected System; and (ii) Hydro’s Rural Isolated General Service customers on a demand and energy rate in accordance with the approved three-year phase-in.

Decision:

The Board hereby approves the Schedule of Rates for Hydro’s Labrador Interconnected Customers, attached hereto as Schedule “A”, to be effective for consumption on and after January 1, 2005.

Date Issued:

December 17, 2004

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 52 (2004)

Application:

Newfoundland and Labrador Hydro Application for approval of the implementation of the 2005 rates to be charged to Hydro’s: (i) Island Interconnected customers; (ii) Isolated Rural Domestic customers (excluding Government departments); (iii) Isolated Rural Street and Area Lighting (excluding Government departments); and (iv) Rural Isolated General Service customers.

Decision:

1.       The Board hereby approves the Schedule of Rates for Hydro’s Island Interconnected customers, Isolated Rural Domestic customers (excluding Government departments), Isolated Rural General Service customers (excluding Government departments), Isolated Rural Street and Area Lighting (excluding Government departments), attached hereto as Schedule “B”, to be effective for consumption on and after January 1, 2005.

2.       The revised page RR-1 of Hydro’s Rules and Regulations as attached in Schedule “C” is approved.

Date Issued:

December 17, 2004

 

 

Newfoundland and Labrador Hydro                               P.U. 53 (2004) / Reasons For Decision

Application:

Application for an Order pursuant to Sections 41 and 78 of the Act:

(i)      approving its 2005 Capital Budget of $42,431,000;

(ii)     approving its 2005 Capital Purchases, and Construction Projects in excess of $50,000;

(iii)    approving its Leases in excess of $5,000;

(iv)    approving its estimated Contributions in Aid of Construction for 2005; and

(v)     fixing and determining, pursuant to s. 78 of the Act, its Average Rate Base for 2003 in the amount of $1,422,412,000

Decision:

1.       Pursuant to subsection 41(3) of the Act, improvements and additions to Hydro’s property for construction and purchases in excess of $50,000, and leases in excess of $5,000 in a year, as set out in Schedule “A” attached to this Order are approved.

2.       Pursuant to subsection 41(1) of the Act, the 2005 Capital Budget for improvements and additions to Hydro’s property in the amount of $42,431,000 is approved.

3.       Pursuant to section 78 of the Act Hydro’s average rate base for the year ending December 31st, 2003 is hereby fixed and determined at $1,422,412,000.

4.       An allowance for unforeseen events of $1,000,000 is approved as part of the 2005 Capital Budget which allowance remains subject to the five conditions in respect thereof more particularly set forth in Order No. P.U. 7 (2002-2003).

5.       Each party shall bear its own costs incurred in connection with this Application.

6.       Hydro shall pay all costs and expenses of the Board incurred in connection with this Application.

Date Issued:

December 23, 2004

 

 

Newfoundland and Labrador Hydro                                                                      P.U. 54 (2004)

Application:

A request by Newfoundland and Labrador Hydro’s Industrial Customers (Abitibi-Consolidated of Canada at its Stephenville and Grand Falls divisions, Corner Brook Pulp and Paper Limited, and North Atlantic Refining Limited) through its legal counsel for an investigation into rates to be charged for 2005. 

Decision:

The request of the Industrial Customers for an investigation into rates to be charged by Hydro for 2005 is denied.

Date Issued:

December 23, 2004


Newfoundland Power Inc.                                                                       P.U. 1 (2003)

         Application:

General Rate Application (the “Application”) by Newfoundland Power Inc. (“NP”) filed pursuant to Order No. P.U. 22 (2002-2003).

Decision:

1.       The Schedule of Dates for the hearing of this Application is amended as set out in Appendix “A” - Item 2. – 2nd Revision.

2.      The Order of Witnesses as set out in Order No. P.U. 27 (2002-2003) Appendix “A” – Item 3 – 1st Revision is rescinded.

Date Issued:

January 21, 2003

 

 

Newfoundland Power Inc.                                                                       P.U. 2 (2003)

         Application:

For approval of: (i) Revised Distribution Line Cost per metre for CIACs; (ii) Revised Distribution Plant Upgrade cost for CIACs; and (iii) Revised Contribution in aid of Construction (CIAC) Cost Factors.

Decision:

Newfoundland Power Inc.’s “Contribution in Aid of Construction Policy: Distribution Line Extensions to Residential and Seasonal Residential Customers” and “Contribution in Aid of Construction Policy: Distribution Line Extensions and Upgrades to General Service Customers” (Revised effective January 31, 2002) approved by the Board for use by Newfoundland Power during 2002 shall remain in effect for CIACs calculated during 2003.

Date Issued:

January 30, 2003

 

 

Newfoundland and Labrador Hydro                                                      P.U. 3 (2003)

         Application:

To proceed with the construction and purchase of certain improvements to its property, pursuant to Section 41(3) of the Act.

Decision:

Pursuant to Section 41(3) of the Act, the Board approves the supplementary 2003 capital expenditure of  $281,400 for the replacement of the timber retaining wall at the Grey River Fish Compensation Structure as set out in Schedule A to the Application.

Date Issued:

February 5, 2003

 

 

Newfoundland Power Inc.                                                                       P.U. 4 (2003)

         Application:

General Rate Application (the “Application”) by Newfoundland Power Inc. (“NP”) filed pursuant to Order No. P.U. 22 (2002-2003) relative to First Procedural Order P.U. 27 (2002-2003), Amended by P.U. 34 (2002-2003) and further Amended by P.U. 1 (2003).

Decision:

1.       The Order of Witnesses is as set out in Appendix “A” – Item 3, attached to the Order.

2.       The Rules of Procedure set out in Order No. P.U. 27 (2002-2003) Appendix “A” - Item 4 are rescinded and are replaced with the Rules of Procedure as set out in Appendix “A” – Item 4, attached to the Order.

Date Issued:

February 26, 2003

 

 

Newfoundland Power Inc.                                                                       P.U. 5 (2003)

         Application:

General Rate Application (the “Application”) by Newfoundland Power Inc. (“NP”) filed pursuant to Order No. P.U. 22 (2002-2003) relative to an interlocutory application from Newfoundland Power.

Decision:

1.       The Board will not hear evidence or submissions relating to the setting and fixing of a rate of return on common equity for Newfoundland Power to the extent that it is beyond the Board’s jurisdiction.

2.       Except as set out in Paragraph 1 above the relief sought by Newfoundland Power is denied.

Date Issued:

February 27, 2003

 

 

Newfoundland and Labrador Hydro                                                      P.U. 6 (2003)

         Application:

Ex Parte Application by Newfoundland and Labrador Hydro (the “Applicant”) for the approval, pursuant to Section 71 of the Act, of an amendment to the Rules and Regulations pertaining to the “Hydro Delivery Points” for the supply of power and energy to its Industrial Customers.

Decision:

1.  The Rules and Regulations of service by the Applicant of each respective industrial customer, as set out in the industrial customer power contracts, are hereby approved as amended so that they read as follows:

(A) Abitibi-Consolidated Company of Canada (Stephenville Division)

1.01(i)           “Hydro Delivery Points” means the 230,000 volt bus at the Customer’s premises at its Stephenville paper mill, or at such other location or locations that Hydro and the Customer mutually agree in writing;

(B) Abitibi-Consolidated Company of Canada (Grand Falls Division)

1.01(n)           “Hydro Delivery Points” means: (i) the 13,800 volt bus bar located in Hydro’s frequency converter building at Grand Falls, (ii) the 6,600 volt bus bar located in Hydro’s frequency converter building at Grand Falls, and (iii) at the point where Hydro’s transmission line, TL-235, connects to the Customer’s 230,000 volt disconnect switch for the Customer’s transformer, T3, located adjacent to Hydro’s frequency converter building at Grand Falls, or at such other location or locations that Hydro and the Customer mutually agree in writing;

(C) Corner Brook Pulp and Paper Limited

1.01(l)           “Hydro Delivery Points” means: (i) Hydro’s 66,000 volt bus in its Massey Drive Terminal Station at Corner Brook, (ii) the line side insulators of the Customer’s terminal structure near the east end of its Deer Lake Power Plant being the termination point of Hydro’s 66,000 volt line, and (iii) the 66,000 volt 60 cycle bus and 50 cycle buses in the No. 1 an No. 2 Substation of the Customer, or at such other location or locations that Hydro and the Customer mutually agree in writing;

(D) North Atlantic Refining Limited

1.01(i)  Hydro Delivery Points” means the 13,800 volt bus on Hydro’s transformers on the north side of the road adjacent to the Customer’s premises in Come by Chance, or at such other location or locations that Hydro and the Customer mutually agree in writing.

2. Amendments to the definition of “Hydro Delivery Points” in the Rules and Regulations to reflect changes to the location at which power and energy is delivered by Hydro to the Industrial Customers shall not be effective until the Board is notified in writing of such changes and a copy filed with the Board.

Date Issued:

February 28, 2003

 

 

Newfoundland Power Inc.                                                                       P.U. 7 (2003)

         Application:

General Rate Application (the “Application”) by Newfoundland Power Inc. (“NP”) filed pursuant to Order No. P.U. 22 (2002-2003) and in the Matter of a Mediation Report filed with respect to certain issues regarding cost of service allocation, rate structure and tariff matters arising from the Application

Decision:

1.  The Board accepts and adopts the Mediation Report attached as Schedule A to this Order, with the exception of paragraph “j” which is replaced as follows to account for a typographical error noted by the parties after consent was given:

j. To the extent possible, there should be no adverse customer rate impacts.  Any overall revenue change should be distributed equally to each class of customers.  With the exception of any change in basic customer charges (see issue “n” below), no customer should have a rate change that produces an annual cost change that is more than twice the system average (unless the dollar impact is minimal).2

2.   The Board accepts the proposed resolution of the “Issues on Which the Parties Agree” as set out in the  Mediation Report and will incorporate the same in its final decision rendered on the Application.

3.  The Board reserves decision on the “Remaining Issue on Which Parties Do Not Agree” as set out in the Mediation Report.

Date Issued:

      March 5, 2003

 

 

Newfoundland Power Inc.                                                                       P.U. 8 (2003)

         Application:

General Rate Application (the “Application”) by Newfoundland Power Inc. (“NP”) filed pursuant to Order No. P.U. 22 (2002-2003) and in the Matter of request from the Consumer Advocate to issue certain subpoenas.

Decision:

1.       The request of the Consumer Advocate for the issuance of subpoenas to Mr. Alex Knight, Mr. Gerard Locke, Mr. Brian Martin and Mr. Bruce Gilbert is denied.

2.      The request of the Consumer Advocate for the issuance of a subpoena to Mr. Bruce Chafe is granted in the form as set out in Schedule “A” to this Order.

Date Issued:

      April 3, 2003

 

 

Newfoundland and Labrador Hydro                                                      P.U. 9 (2003)

         Application:

Application to issue Debenture/s in aggregate not to exceed $150,000,000 during the year ending December 31, 2003, pursuant to Section 91 of the Act.

Decision:

Approval is granted to issued Debenture(s) with an aggregate value not to exceed $150,000,000 Canadian in the principal amount subject to the certain conditions that are included in the Order.

Date Issued:

      April 17, 2003

 

 

Newfoundland and Labrador Hydro                                                    P.U. 10 (2003)

         Application:

Application for approval of certain amendments to the Rules and Regulations pertaining to several classes of Hydro’s Rural Customers pursuant to Section 71 of the Act.

Decision:

1.   The following amendments to the provisions of Schedule A (the Schedule of Rates) and of Schedule B (the Rules and Regulations) to Order No. P.U. 21 (2002-2003) are hereby approved and are incorporated in the revised portions of Schedule A and Schedule B:

(a)  The definition of “Government Departments and Agencies” is deleted and replaced by the following definition of “Government Departments”, which amendment would occur at subparagraph 1(a)(xii) of Schedule B:

“Government Departments” means electric service accounts of Provincial or Federal government departments, agencies, boards, commissions, and crown corporations but excludes hospitals, fish plants, churches, schools, community halls, municipal buildings and like facilities.”

(b)  The references to “Government Departments and Agencies” shall be substituted by the reference to “Government Departments” which substitutions would occur in the following provisions of Schedule A:

- In the “Availability” section of page 11 of 30 (Rate No. 4.1D);

- In the title and the “Availability” sections of page 12 of 30 (Rate No. 1.2G);

- In the title and the “Availability” sections of page 13 of 30 (Rate No. 2.5G); and

- In the title and the “Availability” sections of page 14 of 30 (Rate No. 4.1G)

(c)  Amending the list of rate classes for the Happy Valley-Goose Bay area, found at page 2 of 15, subsection 2(a) of Schedule B by

- renumbering class 3.1H Secondary Energy as class 5.1H;

- inserting the rate class of 3.1H Electric Heating General Service; and

- deleting the words “and Agencies” in the descriptors for Rate Classes 1.2G, 2.5G and      4.1G.

(d)  (i) Amending Schedule A by adding the previously existing $1.15 per fixture per month rate for streetlights in Labrador City where those streetlights are not owned by the Applicant, which rate class shall be Rate No. 4.12W found at a new page 30A of 30; and

(ii) Amending Schedule B by adding a reference to this rate class 4.12W on page 3 of 15 of Schedule B;

(e)    (i) Amending Schedule A on page 29 of 30, for rate 4.1W by substituting for the reference date for the installation or replacement of high pressure sodium streetlights of “after December 31, 2001”, the reference date of “on or after September 1, 2002”;

(ii) Amending Schedule A on page 30 of 30, for rate 4.11W by substituting for the reference date “as of December 31, 2001”, the reference date of “as of September 1, 2002”; and

(iii) Amending Schedule B, on page 3 of 15, paragraph 2(a), by substituting for the date reference for Rate 4.11W, the words “Installed on or after September1, 2002” in the place of the words “Installed as of December 31, 2001”.

2.   For those customer owned streetlights in Labrador which have been the subject of payments by the customer under rate 4.11W, the Applicant shall refund to that customer the difference between the amount it paid under rate 4.11W and the amounts payable under rate 4.12W.

3.   The Applicant shall pay the Board’s expenses arising from this Application.

Date Issued:

      April 17, 2003

 

 

Newfoundland Power Inc.                                                                     P.U. 11 (2003)

         Application:

For approval of a contribution in aid of construction (“CIAC”) for a line extension to serve seasonal customers pursuant to section 41(5) of the Act.

Decision:

Pursuant to Section 41(5), the Board approves the CIAC in the amount of $5,720.13, including HST, for each seasonal customer as calculated under the Policy.

Date Issued:

      April 30, 2003

 

 

Newfoundland and Labrador Hydro                                                    P.U. 12 (2003)

         Application:

For approval, pursuant to section 41(3) of the Act, to proceed with the construction and purchase of certain improvements to its property.

Decision:

Pursuant to section 41(3) of the Act, the Board approves the supplementary 2003 capital expenditure of $138,000 for the addition of self-dyked fuel storage at the diesel generating facility in Rigolet as set out in Schedule A to the Application.

Date Issued:

      April 30, 2003

 

 

Newfoundland Power Inc.                                                                     P.U. 13 (2003)

         Application:

For approval of a contribution in aid of construction (“CIAC”) for a line extension to serve the City of St. John’s, pursuant to section 41(5) of the Act.

Decision:

Pursuant to Section 41(5), the Board approves the CIAC in the amount of $35,779.00, including HST, as calculated under the Policy to provide three-phase service to a pumping station for the City of St. John’s.

Date Issued:

      April 30, 2003

 

 

Newfoundland and Labrador Hydro                                                    P.U. 14 (2003)

         Application:

For approval of a contribution in aid of construction (“CIAC”) for a line extension to serve a Pumping Station located in the Town of Seldom, Fogo Island, pursuant to section 41(5) of the Act

Decision:

Pursuant to Section 41(5), the Board approves the CIAC in the amount of $78,452.59, including HST, as calculated under the Policy for the supply of three-phase electrical service to a pumping station located in the Town of Seldom, Fogo Island.

Date Issued:

      April 30, 2003

 

 

Newfoundland Power Inc.                                                                     P.U. 15 (2003)

         Application:

For approval of a contribution in aid of construction (“CIAC”) for a line extension to serve seasonal customers, pursuant to section 41(5) of the Act.

Decision:

Pursuant to Section 41(5), the Board approves the CIAC in the amount of $2,417.68, including HST, for each seasonal customer, as calculated under the Policy.

Date Issued:

      April 30, 2003

 

 

Newfoundland and Labrador Hydro                                                    P.U. 16 (2003)

         Application:

For approval of: (1) its 2004 Capital Budget pursuant to Section 41(1) of the Act; (2) its 2004 capital purchases, and construction projects in excess of $50,000 pursuant to Section 41(3)(a) of the Act; and (3) its estimated contributions in aid of construction for 2004 pursuant to Section 41(5) of the Act.

Decision:

1.      The motion of the Industrial Customers for an oral hearing is hereby dismissed.

2.      The motion of the Industrial Customers for the consolidation of the capital budget application and the general rate application is hereby dismissed.

3.      The public hearing of the capital budget application will begin at 9:00 A.M., on June 25, 2003, unless otherwise directed by the Board.

Date Issued:

      May 30, 2003

 

 

Newfoundland and Labrador Hydro                                                    P.U. 17 (2003)

         Application:

For approval of: (1) its 2004 Capital Budget pursuant to Section 41(1) of the Act; (2) its 2004 capital purchases, and construction projects in excess of $50,000 pursuant to Section 41(3)(a) of the Act; and (3) its estimated contributions in aid of construction for 2004 pursuant to Section 41(5) of the Act.

Decision:

The public hearing of the capital budget application will begin at 9:00 A.M. on Monday, July 7, 2003, unless otherwise directed by the Board.

Date Issued:

      June 11, 2003

 

 

Newfoundland Power Inc.                                                                     P.U. 18 (2003)

         Application:

For approval of rate stabilization and municipal tax adjustments to be applied to the rates of the Applicant for the period July 1, 2003 to June 30, 2004 pursuant to section 71 of the Act pursuant to section 71 of the Act.

Decision:

The Board approves the Rate Stabilization Adjustment factor of 0.326 cents/kWh and the MTA factor of 1.02438 to be applied to all bills based on meter readings for the period July 1, 2003 to June 30, 2004.

Date Issued:

      June 19, 2003

 

 

Newfoundland Power Inc.                               P.U. 19 (2003), Appendices, Summary

         Application:

General Rate Application (the “Application”) by Newfoundland Power Inc. (“NP”) filed pursuant to Order No. P.U. 22 (2002-2003).

Decision:

Please click order to view details

Date Issued:

June 20, 2003

 

 

Newfoundland and Labrador Hydro                                                    P.U. 20 (2003)

         Application:

For approval of: (1) its 2004 Capital Budget pursuant to Section 41(1) of the Act; (2) its 2004 capital purchases, and construction projects in excess of $50,000 pursuant to Section 41(3)(a) of the Act; and (3) its estimated contributions in aid of construction for 2004 pursuant to Section 41(5) of the Act.

Decision:

Hydro’s proposed 2004 expenditure, project C-2, Purchase and Install Transformer, is hereby approved without prejudice to the parties right to 1) address argument on the sufficiency of the documentation supplied to support a capital project generally or the principles and procedures applied in the capital budget process, or 2) advocate an alternative position on the project in other proceedings as they may deem appropriate.

Date Issued:

      July 10, 2003

 

 

Newfoundland Power Inc.                                                                     P.U. 21 (2003)

         Application:

For approval of a contribution in aid of construction (“CIAC”) for a line extension to serve seasonal customers located at Mansfield Pond, near Brigus Junction, pursuant to section 41(5) of the Act.

Decision:

Pursuant to Section 41(5), the Board approves the CIAC in the amount of $6,628.13, including HST, for each seasonal customer as calculated under the Policy.

Date Issued:

      July 10, 2003

 

 

Newfoundland Power Inc.                                                                     P.U. 22 (2003)

         Application:

For approval of the balance of the weather normalization reserve as of December 31, 2003 pursuant to Sections 69 (3) and 78 of the Act.

Decision:

Pursuant to Sections 69 (3) and 78, the Board approves the weather normalization reserve of a Negative Balance of $10,918,978 as at December 31, 2002.

Date Issued:

      July 11, 2003

 

 

Newfoundland Power Inc.                                                                     P.U. 23 (2003)

         Application:

General Rate Application (the “Application”) by Newfoundland Power Inc. (“NP”) filed pursuant to Order No. P.U. 22 (2002-2003).

Decision:

1.       The forecast average rate base for 2003 and 2004 is hereby fixed and determined to be $672,215,000 and $703,102,000 respectively.

2.       The Board hereby fixes and determines a rate of return on rate base for 2003 of 8.96% and for 2004 of 8.91%.

3.       The allowed range of rate of return on rate base for 2003 shall be 8.78% to 9.14% and for 2004 shall be 8.73% to 9.09%.

4.       Pursuant to Section 70(1) of the Act, the Board hereby approves the Schedule of Rates, Tolls and Charges of NP attached hereto and marked Schedule “A”, to be effective on monthly bills issued on and after August 1, 2003, as well as other charges which are billed on and after that date.

5.       The Board hereby approves NP’s proposal for the rebate of 2001 excess revenue of $944,000 plus HST to customers.

6.       Pursuant to Section 75(3) of the Act the Board hereby approves NP’s proposal to rebate an amount of $2,696,000, which is the variance between revenue generated based upon 2003 interim rates and the revised 2003 test year revenue requirement, plus HST, to customers.

7.       NP shall file a report to the Board no later than October 31, 2003, illustrating the distribution of the rebate in the amount of $3,640,000 to the various customer classes using actual revenues for the 12 months ending July 2003.

8.       Pursuant to Section 71 of the Act the Board hereby approves the Rules and Regulations attached hereto as Schedule “B”, to be effective August 1, 2003.

9.       The Board hereby approves the revised definition of the Excess Revenue Account attached hereto and marked as Schedule “C”.

Date Issued:

July 21, 2003

 

 

Newfoundland and Labrador Hydro                                                    P.U. 24 (2003)

         Application:

Application by Newfoundland and Labrador Hydro (the “NLH”) for approval, inter alia, rates to be charged its customers (the “Application”) pursuant to the Electrical Power Control Act, 1994 and the Public Utilities Act R.S.N. 1990, Chapter P-47

Decision:

1.      Each party shall file an issues list in accordance with the schedule of pre-hearing dates setting out all those issues that the party intends to address in the proceeding.  The issues list is filed without prejudice to the party’s ability to canvass any issue in the proceeding.

2.      The Registered Intervenors in this proceeding are set out in Appendix “A” to this Order.

3.      The Schedule of Pre-hearing Dates as set out in Appendix “B” to this Order shall be observed by the parties, unless otherwise directed by the Board.

4.      The Rules of Procedure as set out in Appendix “C” to this Order shall be observed by the parties, unless otherwise directed by the Board.

Date Issued:

      July 23, 2003

 

 

Newfoundland and Labrador Hydro                                                    P.U. 25 (2003)

         Application:

Application by Newfoundland and Labrador Hydro (the “NLH”) for approval, inter alia, rates to be charged its customers (the “Application”) pursuant to the Electrical Power Control Act, 1994 and the Public Utilities Act R.S.N. 1990, Chapter P-47 and a Motion by the Towns of Labrador City and Wabush respecting costs.

Decision:

1.   The motion of the Towns of Labrador City and Wabush is denied.

2.   The issue of costs will be addressed upon motion of a party at the conclusion of the proceeding pursuant to Section 90(1) of the Act.

Date Issued:

      July 23, 2003

 

 

Newfoundland Power Inc.                                                                     P.U. 26 (2003)

         Application:

Application by Newfoundland Power Inc. (the “Applicant”) for approval of capital expenditures supplemental to the Applicant’s approved 2003 capital budget, to proceed with the construction and purchase of certain improvements to its property pursuant to Section 41 of the Act.

Decision:

Pursuant to Section 41of the Act, the Board approves:

a)       the construction projects and capital purchases in excess of $50,000, as set forth in Schedule B to the Application; and

b)      the revised 2003 capital budget as set forth in Schedule C to the Application.

Date Issued:

      July 25, 2003

 

 

Newfoundland Power Inc.                                                                     P.U. 27 (2003)

         Application:

For approval of a contribution in aid of construction (“CIAC”) for a line extension

Decision:

Pursuant to Section 41(5), the Board approves the CIAC.

Date Issued:

      August 14, 2003

 

 

Newfoundland and Labrador Hydro                                                    P.U. 28 (2003)

         Application:

For approval of a contribution in aid of construction (“CIAC”) for a single-phase line extension to serve an Arts & Exploration Centre located at the Junction of Route # 360 and # 361, near Bay D’Espoir, pursuant to section 41(5) of the Act.

Decision:

Pursuant to Section 41(5), the Board approves the CIAC in the amount of $262,464.50, including HST, as calculated under the Policy for the supply of single-phase electrical service to an Arts & Exploration Centre to be located at the junction of Route # 360 and # 361, near Bay D’Espoir, as calculated under the Policy.

Date Issued:

      August 14, 2003

 

 

Newfoundland and Labrador Hydro                                                    P.U. 29 (2003)

         Application:

For approval  (i) its 2004 Capital Budget pursuant to s.41 (1) of the Act; (ii) its 2004 capital purchases and construction projects in excess of $50,000 pursuant to s.41 (3)(a) of the Act; and (iii) its estimated contributions in aid of construction for 2004 pursuant to s. 41 (5) of the Act.

Decision:

- Pursuant to subsection 41(3)(a) of the Act, improvements and additions to Hydro’s property are approved for construction and purchases in excess of $50,000, as set out in Schedule A attached to this Order.

- A 2004 capital budget for improvements and additions to Hydro’s property in the amount of $27, 316,000 is approved pursuant to subsection 41(1) of the Act.

- Hydro’s proposed estimated contributions in aid of construction of $240,000 are approved provided that all such contributions are sought in accordance with the policies approved by the Board.

- Hydro shall pay costs to the Industrial Customers in the amount of the reasonable fees and expenses of Mr. Barreca as determined by the Board upon receipt of an invoice setting out his fees and expenses.

Date Issued:

      September 5, 2003

 

 

Newfoundland and Labrador Hydro                                                    P.U. 30 (2003)

         Application:

For approval of Lease of Office Space in support of NLH 2003 GRA, pursuant to section 41of the Act.

Decision:

Pursuant to Section 41 (3) the proposed six-month lease of office space in the Prince Charles Building for the amount of  $2,600 per month, plus HST

Date Issued:

      September 5, 2003

 

 

Newfoundland and Labrador Hydro                                                    P.U. 31 (2003)

         Application:

For approval of Additional 2003 Capital Budget items, pursuant to section 41(3) of the Act.

Decision:

Pursuant to Section 41 (3) of the Act, the Board approves the supplementary 2003 capital expenditures of: (1) $306,000 for the reconfiguration of TL255 (Grandy Brook to Hope Brook); and (2) $205,220 for a Load Research Study.

Date Issued:

      September 5, 2003

 

 

Newfoundland and Labrador Hydro                                                    P.U. 32 (2003)

         Application:

A Motion by the Industrial Customers seeking an order that the expert’s reports proposed to be filed by Board Hearing Counsel be excluded from evidence on the basis that the filing of such reports raises concerns with respect to an apprehension of bias.

Decision:

The motion of the Industrial Customers is denied.

Date Issued:

      September 23, 2003

 

 

Newfoundland Power Inc.                                                                     P.U. 33 (2003)

         Application:

Application for written consent to remove certain of NP’s diesel generating plants from service pursuant to Section 8 of the Act.

Decision:

1.   Pursuant to Section 38 of the Act, the Board consents to and approves the decommissioning by NP of the St. John’s Diesel Plant; and

2.   Pursuant to Section38 of the Act, the Board consents to and approves the decommissioning by NP of the Portable Diesel # 1 and # 2, after the 2.5 MW portable unit approved in P. U. 36 (2002-2003) is put into service at the Grand Bay Substation.

Date Issued:

      September 28, 2003

 

 

Newfoundland and Labrador Hydro                                                    P.U. 34 (2003)

         Application:

A Motion by the Towns of Labrador City and Wabush requesting that the hearings in Labrador scheduled to commence on November 3, 2003 be rescheduled to a later date convenient to all parties and the Board.

Decision:

The motion of the Towns of Labrador City and Wabush is hereby granted and the proceedings scheduled to commence on November 3, 2003 in Labrador are postponed.

Date Issued:

      October 30, 2003

 

 

Newfoundland Power Inc.                                                                     P.U. 35 (2003)

         Application:

For approval of an application by Newfoundland Power Inc. for an Order pursuant to Sections 41 and 78 of the Act:

(a)     approving its 2004 Capital Budget of $53,909,000; and

(b)     fixing and determining its average rate base for 2002 in the amount of $573,337,000.

Decision:

1.       Pursuant to section 41 (3) of the Act, improvement and additions to NP’s property are approved as follows:

      Construction and purchases in excess of $50,000, as set out in Schedule B attached to this Order.

2.       The amended 2004 Capital Budget for improvement and additions to NP’s property in an amount of $52,209,000 is approved pursuant to section 41(1) of the Act.

3.       Unless otherwise directed by the Board, NP shall follow the guidelines as set out in Schedule A attached to this Order, which may be amended from time to time by the Board.

4.       Unless otherwise directed by the Board, NP shall provide in conjunction with the 2005 Capital Budget Application, a status report on the 2004 capital budget expenditures showing for each project:

(i)                 the approved budget for 2004

(ii)               the expenditures prior to 2004;

(iii)             the 2004 expenditures to the date of the application;

(iv)              the remaining projected expenditures for 2004;

(v)                the variance between the projected total expenditures and the approved budget; and

(vi)              an explanation of the variance.


 

 

 

Newfoundland Power Inc.                                                                     P.U. 36 (2003)

         Application:

For approval of a contribution in aid of construction (“CIAC”) for a line extension to serve seasonal customers located near the community of Terra Nova, pursuant to section 41(5) of the Act.

Decision:

Pursuant to Section 41(5), the Board approves the CIAC in the amount of $4,218.20, including HST, for each Seasonal Customer, located in the community of Terra Nova, as calculated under the Policy.

Date Issued:

      October 29, 2003

 

 

Newfoundland and Labrador Hydro                                                    P.U. 37 (2003)

         Application:

For approval of the installation of interconnection plant for a non-utility wind turbine generation plant at Ramea, pursuant to Sections 41(3) and (5) of the Act

Decision:

1.   Pursuant to Section 41(3) of the Act, the Board approved the supplementary 2003 capital expenditure of 98,000 for the installation of interconnection plant for a non-utility wind turbine generation project at Ramea.

2.   Pursuant to Section 41(5) of the Act, the Board approves the demand from the customer, Frontier Power Systems Inc., of a contribution not to exceed $112,700 ($98,000 plus a maximum variance of 15%) towards the cost of the interconnection.

Date Issued:

      November 21, 2003

 

 

Newfoundland and Labrador Hydro                                                    P.U. 38 (2003)

         Application:

For approval of a contribution in aid of construction for a single-phase distribution line extension to the Flatwater Pond Cottage Area, Northside, near the Burlington Highway, pursuant to Section 41(5) of the Act.

Decision:

Pursuant to Section 41(5), the Board approves the CIAC in the amount of $2,962.40, including HST, for the supply of single-phase electrical service to thirteen (13) seasonal residential customers located at the Flatwater Pond Cottage Area, Northside, near the Burlington Highway, Route 413, as calculated under the Policy.

Date Issued:

      December 4, 2003

 

 

Newfoundland Power Inc.                                                                     P.U. 39 (2003)

         Application:

For approval of a contribution in aid of construction (“CIAC”) for a line extension to serve seasonal customers located at Woodford’s Station Road, Holyrood, pursuant to section 41(5) of the Act.

Decision:

Pursuant to Section 41(5) of the Act, the Board approves the:

1.       contribution in aid of construction in the amount of Six thousand nine hundred ninety-two dollars and fifty-eight cents ($6,992.58), including HST, for each Customer, as calculated under the Policy; and

2.       additional contribution in aid of construction in the amount of One thousand nine hundred forty-three dollars and fifty cents ($1,943.50), including HST, to be charged to Ms. Lesley Ann Ryan..

Date Issued:

      December 4, 2003

 

 

Newfoundland and Labrador Hydro                                                    P.U. 40 (2003)

         Application:

Application by Newfoundland and Labrador Hydro (the “NLH”) for approval, inter alia, rates to be charged its customers (the “Application”) pursuant to the Electrical Power Control Act, 1994 and the Public Utilities Act R.S.N. 1990, Chapter P-47 and proposed amendments to the Rate Stabilization Plan.

Decision:

Unless otherwise ordered by the Board, the Rate Stabilization Plan is hereby amended as Set out in Schedule “A” effective January 1, 2004.

Date Issued:

      December 16, 2003

 

 

Newfoundland Power Inc.                                                                     P.U. 41 (2003)

         Application:

For approval of a contribution in aid of construction (“CIAC”) for a line extension to serve seasonal customers located at Sandy Point near Norris Arm South, pursuant to section 41(5) of the Act.

Decision:

Pursuant to Section 41(5) of the Act, the Board approves the contribution in aid of construction in the amount of Nine thousand six hundred nineteen dollars and twenty-six cents ($9,619.26), including HST, for each Seasonal Customer, as calculated under the Policy.

Date Issued:

      December 18, 2003

 
     
 
 
About the Board
Commissioners
Legislation
Mandate and Lines of Business
Reporting Requirements
Disclaimer
Privacy Policy
Contact Us
  Public Utilities
Applications and Proceedings
Guidelines

Orders
Legislation
Compliance Filings and Reports
  Automobile Insurance
Applications and Proceedings
Guidelines

Orders
Legislation
Information Bulletins
Questions and Answers

  Petroleum Products
Current Pricing
Historical Pricing
How Prices Are Set
Applications and Proceedings
Orders
Legislation
Zone Map
Questions and Answers
 
 

Copyright © 2024 Board of Commissioners of Public Utilities. All Rights Reserved