Newfoundland and Labrador Hydro filed a Reliability and Resource Adequacy Study with the Board addressing both near-term and long-term reliability and supply adequacy for the province’s electrical system before and after the integration of the Muskrat Falls Project. The Study sets out Hydro’s view of near-term resource adequacy, long-term resource planning considerations and the resource options available to meet its proposed planning criteria.
 
Study
From NLH - 2024 Resource Adequacy Plan - REVISION 2 - REDACTED - 2024-08-26
From NLH - 2024 Resource Adequacy Plan - REVISION 1 - REDACTED - 2024-07-09
From NLH - 2024 Resource Adequacy Plan - CORRECTED - REDACTED - 2024-07-09
From NLH - 2024 Resource Adequacy Study - REDACTED - 2024-07-09
From NLH - Reliability and Resource Adequacy Study - 2022 Update - 2022-10-03
From NLH - Reliability and Resource Adequacy Study - 2021 Update - 2021-03-16
From NLH - Reliability and Resource Adequacy Study - 2020 Update - Volume II - Near Term Reliability Report - 2020-11-18
From NLH - Reliability and Resource Adequacy Study - November 2019 Update - 2019-11-15
From NLH - Reliability and Resource Adequacy Study - November 2018 - 2018-11-16
 
Intervenors
The Consumer Advocate
Newfoundland Power
Island Industrial Customer Group
Labrador Interconnected Group