Newfoundland and Labrador Hydro filed a Reliability and Resource Adequacy Study with the Board addressing both near-term and long-term reliability and supply adequacy for the province’s electrical system before and after the integration of the Muskrat Falls Project. The Study sets out Hydro’s view of near-term resource adequacy, long-term resource planning considerations and the resource options available to meet its proposed planning criteria.

 


Reports
The Liberty Consulting Group Reliability and Resource Adequacy Study Report - 2019-08-19
 
 
The Liberty Consulting Group
  Quarterly Monitoring Reports
  Labrador-Island Link Monthly Updates
 
 
Operational Studies
From NLH - Avalon Capacity Study - Solutions to Serve Island Demand During a LIL Bipole Outage - 2019-05-24
 
 
Related Reports
Investigation and Hearing into Supply Issues and Power on the Island Interconnected System - Phase Two